Some Technical Considerations When Mining Under Bodies Of WaterBy John W. Fredland
Conducting mining operations under a body of Water can create hazardous conditions for miners. The potential for a sudden inrush must be considered and abnormal ground control conditions can be encoun
Jan 1, 1982
-
Site Characterization For Planning Underground Stone MinesBy Francis S. Kendorski
Underground stone mines tier construction aggregates and industrial minerals are being planned in increasing numbers throughout the United States. At the middle of the last century (1950s) underground
Jan 1, 2000
-
Prediction of Inter-Strata Movements Above Longwall Faces (bade68bf-520f-401d-9d3a-43ba4395e61a)By Neil Styler
This paper presents an analysis of measurements of inter-burden de- formations above six longwall faces. An attempt is made to demonstrate some correlation between the movements at the various sites,
Jan 1, 1984
-
Stability Of Interpanel-Pillar And Deformation Of Gateroad Due To Longwall MiningRetreat longwall method with re-use of gateroad has been traditionally employed in Japan, mainly because of the advantage of higher recovery. But the Miike Colliery has newly introduced the interpanel
Jan 1, 1990
-
Subsidence Prediction Influence Assessment and Damage ControlBy Y. Luo
An extensive subsidence research program conducted by the authors has greatly improved the accuracy and the capabilities of subsidence prediction under complicated mining and surface conditions. The t
Jan 1, 1997
-
The Role Of Engineering And Geology In Analyzing Ground Control ConditionsBy David A. Newman
Severe roof control problems have plagued a West Virginia underground mine since its initial development in the late 1970's. Adverse roof conditions in the Eastern portion of the reserve result f
Jan 1, 1999
-
Longwall Production, Maintenance, And Roof Control SystemBy W. Mark Hart
The current Automatic Data Acquisition system developed by some support manufacturers make it possible to monitor and record changes in leg pressure, DA RAM stroke in every shield and shearer position
Jan 1, 1994
-
Supercomputer Assisted Three-Dimensional Finite Element Analysis Of A Longwall PanelBy Duk-Won Park
The excavation of a longwall panel causes a continuous stress redistribution in the surrounding strata for every face advancement. The understanding of the behavior of rock to high level of stresses i
Jan 1, 1989
-
Calibration Of The Analysis Of Longwall Pillar Stability (ALPS) Chain Pillar Design Methodology For Australian ConditionsBy Mark Colwell
This paper summarizes the results of a research project whose goal was to provide the Australian coal industry with a chain pillar design methodology readily usable by colliery staff. The project was
Jan 1, 1999
-
Intersection Stability and Tensioned BoltingBy Yunqing Zhang
Roof failure occurs much more frequently at intersections than entries and crosscuts. Using a commercial finite element package, four-way and three-way intersections reinforced with the tensioned bolt
Jan 1, 2003
-
Geotechnical Mine Design Of The Foidel Creek MineBy H. N. Maleki
The results of five years of geotechnical investigations are presented to develop productive and stable longwall layouts for the Foidel Creek Mine. The program was initiated during the pre-mining stag
Jan 1, 1988
-
Rockbolting For Highly Stressed RoadwaysBy Holger Witthaus
The conditions of great mining depth and multi-seam¬longwalling require a special method of rockbolting, It can be described as a control loop which is based on the elements of planning, drivage and m
Jan 1, 2000
-
Typical Complete Stress-Strain Curves Of CoalBy Khaled Morsy
This study presents a typical stress-strain model for coal material using the available in-situ and laboratory tests data conducted on coal. This model can be used as a basic coal model in finite elem
Jan 1, 2001
-
Empirical Approach to Calculate Rock Loads in Coal Mine RoadwaysBy Erdal Unal
In order to define the support parameters, by use of empirical approaches, it is particularly important to analyze the rock-load height that should be controlled by supports. The controlling mechanism
Jan 1, 1986
-
The New Two-Dimension LaModel ProgramBy Olayemi Akinkugbe
As coal production in the United States continues to increase, the availability of unexploited or virgin fields continue to diminish. As a result, mine operators are forced to mine in unfavorable or m
Jan 1, 2004
-
Geotechnical Planning Basis for the Optimization of WorkingsBy Nikolaos Polysos
Besides considering the given geomechanical conditions, the geological/geotechnical logging of drill cores and heading faces during the driving of parallel entries and the resulting rock classificatio
Jan 1, 2003
-
Determination of Effective Column Lengths for Resin-Grouted Roof BoltsBy W. A. Cincilla
The use of resin-grouted rock anchors continues to gain popularity in underground wall mines in the United States. It is estimated that during 1985, more than 30% and as many as 35% of all roof bolts
Jan 1, 1986
-
Detailed Underground Measurements Of Roof Deflection And Bed SeparationBy André Vervoort
To learn more about the fundamental roof behaviour in South African coal mines, accurate underground measurements of roof deflection were conducted in bord and pillar panels during development and pil
Jan 1, 1992
-
Geotechnical Considerations for Longwall Top Coal Caving at Austar Coal MineBy Adrian L. Moodie
Austar Coal Mine (formerly Southlands and Ellalong Collieries) has had a long association with difficult strata control conditions associated with mining depth and a highly jointed/cleated coal seam.
Jan 1, 2011
-
Application of the Coal Mining Roof Rating System in South African CollieriesThis paper describes the experiences with the application of the Coal Mining Roof Rating (CMRR) System to South African strata conditions. Roof classification studies using the CMRR system were undert
Jan 1, 2001