Mine Stability MappingBy Collin L. Stewart
The high cost and limited flexibility of modern longwall systems has resulted in the need for mine engineers and geologists to predict possible adverse mining areas ahead of mining and to then design
Jan 1, 2006
-
An Application Of Energy Release RateBy Morgan M. Sears
In recent years, one large mine collapse and numerous smaller bump events have resulted in a renewed interest in coal bump research. With numerical modeling, the Energy Release Rate (ERR) calculation
Jan 1, 2009
-
New Developments In Headed Rebar Ground Support (e1369dc5-cd64-41ac-8b6d-861d8d628824)By Roland C. Walker
Traditional headed rebar has existed in the mining industry as a ground support product for many years. The head of a rebar bolt is most commonly produced by hot upset die forging. Upset die forging
Jan 1, 2009
-
Improvements in Coal-Waste Disposal Since Buffalo CreekBy Kelvin K. Wu
A coal waste disposal dam failed on Buffalo Creek near Saunders, West Virginia, on February 26, 1972. This accident resulted in the loss of 125 lives, left over 4000 people homeless, and resulted in m
Jan 1, 2006
-
Correlation Between Unconfined Compressive And Point Load Strengths For Appalachian RocksBy Luis E. Vallejo
The strength measured by the uniaxial compression test is a parameter that is widely used for the engineering classification of rocks. Sedimentary rocks such as shales, however, are difficult to evalu
Jan 1, 1989
-
Innovation In Control Of Geomechanical State Of Undermined Rock Mass And Deformations Of Earth SurfaceBy F. N. Voskoboyev
The suggested new method for control of geomechanical state of undermined rock mass ensures, as a safety measure for the earth surface protection, the decrease of deformations by 2,5 - 10 times in min
Jan 1, 1996
-
Coal Pillar Strength Based On The Ground Reaction Curve - A New ApproachBy Kazem Oraee
In underground coal mining, particularly room-and-pillar methods, the coal pillars play a significant role in roof stability. If the pillar dimensions are increased, the pillar bearing capacity also i
Jan 1, 2009
-
Mitigating the Effects of High Horizontal Stress on Ground Control in An Underground Stone Mine: A Case HistoryBy John Ellenberger
The nature of a stone deposit is rarely defined through exploration and engineering design, but more through the actual experience encountered as the mine develops; hence, issues with ground control a
Jan 1, 2012
-
Prediction of surface movement with emphasis on horizontal deformation due to miningBy Mao Bai
In predicting the integrity of under-mined structures, surface horizontal displacements and curvatures are frequently of greater importance than the more homogeneous vertical displacements. Accurate e
Jan 1, 1989
-
Geotechnical Factors Influencing A Time-Dependent Deformation Mechanism Around An Entry In A Dipping SeamBy M. K. Larson
The U.S. Bureau of Mines and Cyprus Shoshone Coal Corp. conducted a study of deformation mechanisms in strata around a longwall gate road system at two sites in an underground coal mine near Ham, WY.
Jan 1, 1996
-
Letter Of Nomination - 26th International Conference on Ground Control in MiningBy Christopher Mark
Dr. Christopher Mark serves as Team Leader of the Rock Mechanics Section in the Rock Safety Engineering Branch of the NIOSH - Pittsburgh Research Laboratory. In this position he leads a multi-discipl
Jan 1, 2007
-
Airbag Support for Ground Control in Thin Seam Coal MiningBy Fan Shaogang
In this paper, the airbags' structure and technical characteristics and its applications in China are described. Based on the practice of the airbags in mining thin seams, the effects on ground c
Jan 1, 1997
-
Trail Mountain Mine: A Case Study For Improving Locations Of Mining-Induced Seismicity With Double-Difference Relocation (2de3a4ff-91be-4a02-947a-fc4fd7ffaac8)By Eleanor Sonley
In October 2000, temporary seismographic stations were installed above the Trail Mountain Mine, Emery County, Utah, USA to supplement a regional network. Over seven months, 1826 mining-induced seismi
Jan 1, 2009
-
Subsidence prediction using a laminated linear modelBy Miklos D. G. Salamon
If all stratifications are horizontal, the computation of surface deformation induced by coal mining involves the prediction of roof and floor convergence and then the transfer of the effects of this
Jan 1, 1989
-
Outburst Control in Underground Coal Mines,By Floyd D. Varley
Outbursts, the sudden and violent out- pouring of material into mine openings, is a ground control problem increasingly encountered in the United States as deeper seams are developed. Outbursts, cause
Jan 1, 1986
-
Application Of A Polymer-Based Sealing Material To Prevent Roof From WeatheringBy Peter Zhang
The immediate roof at the test site consisted of laminated clay shale that is likely to be susceptible to weathering. With seasonal dry-wet cycles in the mine ventilation air, the roof in the intake
Jan 1, 2009
-
Geotechnical Mapping By Seismic Imaging In Underground MinesBy W. J. Mcgaughey
A crosshole seismic imaging (tomography) experiment has been carried out in an underground mine in order to delineate waste rock within a massive sulphide ore body. Data comprising 1526 travel time me
Jan 1, 1989
-
Design And Control Of Working Support In Polish Coal Mines Based On Three-Dimensional Numerical ModelingBy Slawomir Bock
One of the fundamental issues having a great influence on the safety of operations performed in underground mines is the support of workings which should assure their stability in a given geological s
Jan 1, 2009
-
Performance Evaluation Of A Cable Bolted Yield-Abutment Gate Road System At The Crandall Canyon No. 1 Mine, Genwal Resources, Inc., Huntington, UtahBy J. R. Koehler
Although two-entry yield pillar-based gate roads supported by wooden cribs have been commonly used throughout longwalling in the Wasatch PlateadRoan Cliffs coalfield of central Utah, a three-entry yie
Jan 1, 1996
-
Utilization of the Hilti OneStep Rock Anchor at Twentymile Coal Company to Reduce the Overall Amount of Time for Face Stabilization During Longwall RecoveryBy Bill Stormes
This paper will discuss implementation of the Hilti OneStep rock anchor technology to improve face bolting operations during the May 2008 longwall move; increase rock anchor installation capacity; and