Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Improving Performance Of Dust Controls For Continuous MinersLaboratory tests were conducted in a full-scale continuous miner test gallery to evaluate resulting dust levels for changes in face airflow, spray water quantity and pressure, and mining height. The m
Jan 1, 1994
-
The Block Method Of Strip Mining ? IntroductionBy L. W. Saperstein
Surface mining of coal is undoubtedly one of the more controversial aspects of the mineral industries today. There is a constant tug between the need for readily available and inexpensive energy suppl
Jan 1, 1973
-
Empirical Approach For Drift Blast Design In Hard Rock MinesBy S. P. Singh
Drifts are the nerve centre of underground mining. They provide essential communications between primary openings and production areas. In view of their strategic importance in the overall safety, eco
Jan 1, 1991
-
A Life-Cycle Approach To Coal Resource Analysis: Examples From The Appalachian And Illinois BasinsBy R. C. Milici
Historical production data and reserve decline rates can be used both to predict future coal production rates and to estimate when the reserve will be depleted. Reserve estimates inferred herein from
Jan 1, 1997
-
Roybal Raise: An Alternative Two-Compartment RaiseBy Don Suttie, Frank Roybal, John Wright
The Roybal Raise incorporates the simplicity and low cost of a short bald-headed raise while overcoming the usual impediments to driving a high baldheaded raise. The concept provides for speedy excava
Jan 1, 1984
-
Miners tunneling efforts nearly ended Civil War nine months soonerBy Bob Snashall
"We could blow that damned fort out of existence if we could run a mine shaft under it!," claimed one Union soldier eyeing Bobby Lee's Petersburg defense line protecting Richmond and Jeff Davis.
Jan 1, 1989
-
The Effect Of Feed Source In The Hot Water Processing Of Utah Tar SandBy M. Misra
The processing strategy for the effective separation of bitumen from low grade (< 10 weight percent bitumen) Utah tar sands by a hot water process differs significantly from that used for the processi
Jan 1, 1979
-
TBM's - U.S. - Where Are We - What Can We Do About It?By John W. Leonard
The typical tunnel boring machine in use on today's tunnel project uses 15'2-inch diameter cutters at a nominal load of 45 kips per cutter. The cutterhead rotates at a speed of 120 over D re
Jan 1, 1981
-
Innovative Grinding Circuits Through Staged Classification And Concentration ? IntroductionBy L. H. E. Weyher
Minerals beneficiation commonly requires initial crushing and grinding so that the mineral phase we seek to concentrate is adequately liberated to obtain a product of specified grade at optimum recove
Jan 1, 1985
-
Tectonic Analysis As An Exploration ToolBy Peter C. Badgley
Three tectonic provinces within the Cordilleran System, are analyzed in terms of tectonic framework. (1) Precambrian terrain of North-Central Colorado; (2) The Pacific Northwest; and (3) The San Andre
Jan 1, 1959
-
A Comparison Of Reclamation Requirements And Costs Under State And Federal Hard-Rock Mine Reclamation LawsBy D. L. Moellenberg
Under various state laws enacted mostly within the last 20 years, reclamation requirements and standards for hard-rock mining operations have been established virtually everywhere in the western Unite
Jan 1, 1994
-
Breaking Conway’s Law: Getting the Benefits from Integrated Design Automation - NAT2022By David Wright, Jerome Chamfray, Anthony Harding, Brian Boye
Conway’s Law states that unless we intentionally design automation tools around what we need, we will simply replicate our existing processes. While we may achieve some savings this way, there is an o
Dec 1, 2022
-
Stress Evolution and Failure Characteristics of Overburden During Multi‑Stope Mining for a Gently Inclined Thin Orebody - Mining, Metallurgy & Exploration (2023)By Yueyue Ding, Yuanhui Li, Zhengrong Li, Pengfei Yu, Kunmeng Li, Zhipeng Xiong
The stress evolution and failure characteristics of overburden were studied during multi-stope mining for a gently inclined thin orebody. Firstly, an indoor physical experiment was conducted on the ex
Mar 2, 2023
-
Rock Quality Alteration Surrounding Drifts And An In Situ Leaching Design Using Underground WorkingsBy J. L. Ellenberger
The U.S. Bureau of Mines has cooperated with Cyprus Casa Grande Corporation Cyprus Casa Grande Mine, Cas a Grande, Arizona, since 1988 to assess the hydrology of an in situ leaching test facility. Thi
Jan 1, 1994
-
Analysis Of Displacement And Strain Data For The Determination Of The In-Situ Deformability Of Rock MassesBy Rodolfo V. de la Cruz
The in-situ deformability of a highly jointed basalt rock mass was determined by two distinctly different methods: one, by the NX- borehole jack method where the displacements of opposing curved plate
Jan 1, 1982
-
The Effect of Chemical and Physical Coal Properties on Handling BehaviorBy Barbara J. Arnold
A coal's size distribution, clay content and moisture content can affect its handling behavior, but the combined effects of these properties and the effects of other properties are not known. Res
Jan 1, 1990
-
Development Of Fine Ore Production At Cape Lambert - History Of The ProjectBy G. J. Gersbach
The Robe River Iron Ore Project began in 1962 when Cliffs International acquired mining leases in Western Australia's Pilbara Region. Initial reserves were proven and bulk ore samples sent to the
Jan 1, 1983
-
Innovative Research On Bulk Density Of Coal For Application To Transportation SystemsBy J. W. Leonard
By using physical and chemical method to increase the bulk density of newly mined coal, the productivity of a mine can be significantly increased. Greater amounts of coal can be placed in fixed volume
Jan 1, 1992
-
Shrinkage Stoping at the Idarado MineBy William Hustrulid
INTRODUCTION The Idarado mine lies high in the San Juan Moun¬tains on the divide between the Uncompahgre and San Miguel Rivers and consists of a consolidation of a number of old and prominent mining
Jan 1, 1982
-
Benefits Associated With Two-Stage Spiral Cleaning At McClure River Preparation PlantBy S. Horton, F. L. Stanley, P. J. Bethell
Introduction The McClure River Processing Plant is located at McClure in Dickenson County, VA. The plant was originally constructed in 1979 as a 600 st per hour facility. The plant is fed by coals
Jan 1, 1992