Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Geologic Model For A Tunnel Cost ModelBy Steven G. Vick, Herbert H. Einstein
1. INTRODUCTION The Tunnel Cost Model (TCM) is a computer based model whose objective is to quantify the risks of hard rock tunneling in terms of cost and time to completion. The main feature of th
Jan 1, 1974
-
Metro Tunnels, Caracas, VenezuelaBy L. A. Romo, J. A. Ferrer
INTRODUCTION The principle line of the Caracas Metro is located generally along the most important east-west traffic corridor of the city from the yards and shops in Propatria at the western extrem
Jan 1, 1979
-
Puk Process For Nickel Ore Treatment Through Carbothermic Selective ReductionBy F. Grandjacques
INTRODUCTION Selective Reduction of Nickel in Oxidized Ores Oxidized nickel ores, either garnieritic or lateritic, contain much more iron than nickel. The regular carbon reduction in an electr
Jan 1, 1979
-
TBM Excavation Of Rogers Pass Railroad TunnelBy Gail B. Knight
INTRODUCTION In May 1984, The Canadian Pacific Railway awarded to the Joint Venture of Foundation of Canada, Ltd. of Toronto, Atlas Construction Co. of Montreal, and S. A. Healy Co. of Chicago the
Jan 1, 1987
-
Sampling and Analysis for Exposure to Diesel Exhaust Particulate in the Mining WorkplaceBy Michel Grenier, Mahendra Gangal
Two methods used to measure the exposure of mine workers to diesel exhaust particulate were compared. One method was developed by the U.S. Bureau of Mines and the University of Minnesota's Partic
Jan 1, 1997
-
The Impact Of Roof Conditions And The Mining Cycle In Determining A Representative Respirable Mass ConcentrationBy R. L. Grayson, N. P. Reddy, D. A. Kinzler, S. Yuan, W. R. Myers, R. A. Wells
An examination was conducted on the impact of roof conditions and the mining cycle in determining a representative respirable mass concentration at the mid-shearer location on a longwall panel. Multip
Jan 1, 1991
-
Design And Construction Of A 5-Kt (5500-St) Facilities Module For Main Pass 299 Sulfur MineBy C. W. Nelson, A. G. Moody
This paper describes the design, equipment selection and onshore fabrication of the largest facilities module ever installed in a single lift in the Gulf of Mexico. Measuring 35.5 x 70.1 x 21.3 m (110
Jan 1, 1994
-
Design And Construction Of The Keystone Tunnel Widening ProjectBy Stephen J. Klein, Fernando Orduz, Randall J. Essex
INTRODUCTION The Keystone Tunnel project consists of widening an existing 7.3 m-wide (24 ft) highway tunnel to a width of 13.7 m (45 ft) to provide a three-lane, two-directional highway tunnel. The
Jan 1, 1989
-
Simulation Based Degasification System Design For The Shihao Mine of the Songzao Coal Mining Administration in Sichuan ChinaBy Jeffrey J. Schwoebel, Jianliang Li, Daniel J. Brunner
A United Nations (UN) administered degasification technology transfer project, funded by the Global Environmental Fund (GEF) is underway at the Shihao Mine of the Songzao Coal Mining Ad- ministration
Jan 1, 1997
-
The Red Hook Intercepting Sewer - A Compressed Air Tunnel Case HistoryBy Eugene F. Casey, John G. Ruggiero
INTRODUCTION Construction of tunnels in urban areas, especially reclaimed areas, pose many problems. The Red Hook Intercepting Sewer Tunnel, Contract 1A is a portion of the Red Hook Water Pollution
Jan 1, 1981
-
Reducing Earthmover Tire CostsBy Charlie Sons
Pit and underground mine operators typically use a lot of big equipment tires. Just as typically, they spend a lot of money they shouldn't on these tires. That's because tire use and mainten
Jan 1, 1982
-
Multielement Extraction System For Determining 19 Trace Elements In Gold Exploration SamplesBy John G. Viets, J. Robert Clark
A multielement extraction system is being used successfully to provide essentially interference-free geochemical analyses to aid in gold exploration. The Methyl isobutyl ketone-Amine synerGistic Iodid
Jan 1, 1990
-
Controlled Recirculation Of Section Air In A Trona MineBy Andrew B. Cecala, Robert J. Timko, Christopher J. Pritchard
As mine venti1ation systems become more complex, it is increasingly difficult to supply fresh air to the working face. A high percentage of the fresh air entering a mine never reaches the working face
Jan 1, 1989
-
A Re-Examination of Conditioning of Coarse Florida PhosphateBy G. D. Hood, B. E. Davis
A problem that has continued to plague the Florida phosphate industry is loss of coarse phosphate in the flotation circuit. Attempts to remedy this problem such as floating the coarse material (plus 4
Jan 1, 1993
-
Owner-Engineer-Contractor Relationships In Tunneling-A Contractor’s ViewpointBy Sol Ribakoff
With the utilization of most of the "high dam" sites for hydro-electric power and the completion of most railroad routes, many tunnel contractors were extremely doubtful that tunnel driving would cont
Jan 1, 1997
-
3. Use of a Ground-Water Model in Planning for Oil-Shale MiningBy J. S. Long
A finite-difference model using a digital computer was constructed to assist in the water management of a proposed oil-shale mining operation in the Piceance Basin in Colorado. The presence of ground
Jan 1, 1979
-
The Application of Petroleum Engineering to Geothermal Development (e7fcbc76-2142-4a2c-aab2-ba67a895a85b)By V. E. Suter
Anyone with geothermal experience can readily attest that geothermal operations are a natural extension of oil and gas operations. A geothermal company and an oil company need the same type of people
Jan 9, 1980
-
Comparative Analysis Of Cyanidation And AcidotidoureationBy Malcolm J. Lake, P. Brad Marchant, Linda M. Broughton
Thiourea is recognized as a technically competitive alternative to cyanide for gold and silver extraction for a variety of ores and concentrates. This paper describes the results of a recent mini-pilo
Jan 1, 1998
-
Successful Soft Ground NATM Approach on Metro Section E4B in Washington, D.C.By Peter Kolitsch, Galyn Rippentrop
INTRODUCTION On April 14, 1994, the joint venture of Kiewit Construction Company and Kenny Construction Company was awarded a 76 million dollar contract for the construction of the New Hampshire A
Jan 1, 1997
-
Sampling and Modelling of Flotation CircuitsBy Eric Forssberg, Mats Hallin
INTRODUCTION Evaluation and optimization of mineral processes has been going on since the the first plant started hundreds of years ago. A huge mass of knowledge has been collected since then. The
Jan 1, 1991