Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    A PC-Based Worker Scheduling System For Underground Mines

    By R. L. Grayson

    Following lip on a USBM-sponsored research project, the authors have utilized the knowledge-base structure and system concepts from the Sun Sparcstation-based worker scheduling system of the Mine Mana

    Jan 1, 1996

  • SME
    Preliminary Considerations For Longwall Mining ? Introduction

    By George R. Huebner

    The White Pine Copper Company, subsidiary of Copper Range Company, is located in the Upper Peninsula of Michigan. The offices, plant, and mine are six miles south of Lake Superior in Ontonagon County.

    Jan 1, 1964

  • SME
    Tunneling to Manage Construction Impacts for Albany’s Beaver Creek Clean River Project, Albany, New York - RETC 2021

    By Greg Bold, Mahmood Khwaja, Yuannian (Jerry) Wan, Michael S. Schultz, William Simcoe

    Beaver Creek Clean River Project will satisfy the consent decree requirements by capturing and treating combined sewage overflows. The project consists of, approximately, 2,700 feet of 30-inch trenchl

    Jun 13, 2021

  • SME
    Chicago TARP McCook Main Tunnel - World’s Largest Live Tunnel Connection is Underway at Chicago’s Tunnel and Reservoir Plan (TARP)

    By Faruk Oksuz, Dave Schiemann, Matt Trotter, Mike Padilla, Miguel Sanchez, Carmen Scalise

    "Chicago’s Tunnel and Reservoir Plan (TARP) is a nearly $4.0 billion and over 30 years long program and arguably the largest and longest combined sewer tunnel and reservoir system in the world. Recent

    Jan 1, 2016

  • SME
    Copenhagen Cityringen Project: Urban Mining Challenges in Contaminated Ground

    By Valerio Violo, Antonio Raschillà, Livia Cicinelli

    "The Cityringen project foresees the construction of a new circular metro line in and around the city center of Copenhagen. Both drives, the north and the south one, required the TBMs to be equipped i

    Jan 1, 2016

  • SME
    CFD Modeling of a Novel Wet Scrubber for Capture of Respirable Dust in an Underground Coal Mine

    "Controlling dust generation and keeping it below permissible limits at the working face of a room and pillar mine is a challenge for mine operators. With the recent changes in the respirable-dust reg

    Jan 1, 2016

  • SME
    Overcoming Challenges in Tunneling for Albany’s Beaver Creek Clean River Project, Albany, New York - NAT2022

    By Jerry Wang, Greg Bold, Mahmood Khwaja, Rebecca Caldon, William Simcoe

    Phase III and Phase IV of the Beaver Creek Clean River Project, Albany, NY, includes microtunnel construction of 2,320 feet of 48-inch/36-inch internal diameter (ID) conveyance pipe and a 525 foot lon

    Dec 1, 2022

  • SME
    Rock Tunnels at High Water Pressure: Non-Continuous Pressurized TBMs Versus Slurry - RETC2021

    By Brad Grothen, Lok Home

    The choice of TBM type is never easy, but it becomes especially challenging when faced with a hard rock tunnel with expected high water flows and pressure. Slurry Shield tunneling has a long history o

    Jun 13, 2021

  • SME
    Brazil's Development As A World Supplier Of Pigment Grade Paper Coating Clays

    By Jr. Pickering

    Kaolin is mined from extensive sedimentary formations in the eastern Amazon River Basin of Brazil. Production began about 25 years ago from 30 meter thick beds of ultra-fine particle clay of superior

    Jan 1, 1999

  • SME
    Upward Surface Movement Above Deep Coal Mines After Closure and Flooding: Analytical Modeling Results

    By André Vervoort

    At the 2017 ICGCM-conference in Morgantown, WV, a case study was presented with measurements of the upward surface movements or uplift after the closure of two neighboring coal mines (Winterslag and Z

  • SME
    Analysis Of Mine Geology And Improvement Of Longwall Performance Using Continuous Shield Monitoring With LoSCoMS

    Large variations of coal seam thickness and roof conditions are associated with the occurrence of mine floor undulation at Shoal Creek Mine, operated by Drummond Company, Inc.. Ground control problems

    Jan 1, 1998

  • SME
    The Lee Tunnel Beckton London: An Innovative Use of FRC from Design to Construction Phase

    By John Greenhalgh, Benoit De Rivaz

    "1.INTRODUCTIONThis paper is based on the Lee Tunnel project, which is part of the Thames Water’s Tideway Project.The client Thames Water has employed a Joint Venture of Morgan Sindall/Vinci Grand Pro

    Jan 1, 2016

  • SME
    Software Modeling Of Mineral Process Objects

    By Kal V. S. Sastry

    Mathematical and expert system models are being used extensively for mineral process engineering. There exist no standardized methodologies for their computer implementation. In meeting this need, thi

    Jan 1, 1994

  • SME
    Hauling Coal Into The 21st Century (769c18a2-0d06-4ce7-9c68-865f00b87cb8)

    When I wrote the Railroad portion of "Mining Engineering" magazines 94 Powder River Basin (PRB) Coal Article I described to you some definite destinations the Railroads had in mind. As with many desti

    Jan 1, 1998

  • SME
    Marta's Broad Street Tunnels

    By Thomas R. Kuesel, Harvey W. Parker

    INTRODUCTION This paper describes the use of a shield and compressed air for construction of a short section of a pair of twin single-track tunnels for the Metropolitan Atlanta Rapid Transit Author

    Jan 1, 1981

  • SME
    Design and Construction Challenges for the North Temple Tunnel - NAT2022

    By Todd Kilduff, Michael Tinney

    The North Temple Tunnel pedestrian underpass in Salt Lake City, UT was built using a pipe canopy method that met significant challenges in potentially running ground conditions. Kilduff Underground En

    Dec 1, 2022

  • SME
    Out with the Old, In with the New: How We’ve Come Full Circle from the Burning River - NAT2022

    By Ben DiFiore, Richard DePew, Nate Long, Adrian Naranjo-Castillo, Chris Petta, Robert Auber

    The Walworth Run stream was brick-culverted in the 1800s, converting it to a 16-ft diameter sewer. This Cuyahoga River tributary contributed to the infamous burning river that became the catalyst for

    Dec 1, 2022

  • SME
    Influence of Trailing Cables on Magnetic Proximity Detection SystemsMining, Metallurgy and Exploration

    By Jacob Carr, Chenming Zhou, Nicholas Damiano, James Noll, Jingcheng Li

    Machine-related injuries are one of the major safety concerns in underground coal mines. Severe injuries and fatalities occur when a miner is struck, crushed, or pinned by mining equipment such as a c

  • SME
    Approaches to the Development of Coal Spiral Models

    By J. J. Davis, C. A. J. Fletcher, M. Li, T. Jancar

    This paper summarises the experimental approach to spiral modelling at the Julius Kruttschnitt Mineral Research Centre, University of Queensland, involving the use of plastic density tracers to determ

    Jan 1, 1995

  • SME
    An Example Of Classification Of Reserve Types By Historical Input To Geostatistics And Other Considerations In Defining Ore

    By D. E. Ranta, Leigh A. Readdy

    Defining classes of ore using geostatistical methods that match historical classifications has presented problems in the past. A simplistic and practical approach to this problem is presented. An exam

    Jan 1, 1992