Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Guaigui Multipurpose Project Rock Slope StabilityBy Bjørn Nilsen, Werner Stefanussen
The construction of the Guaigui Multipurpose Project includes a 74 metre high concrete face rock fill dam, a 350 metre long diversion tunnel and a 350 metre long spillway tunnel. The topography in the
Jan 1, 2006
-
The Application Of Radar Techniques For In-Mine Feature Mapping In The Bushveld Complex Of South AfricaBy D. Vogt
A brief summary of the propagation characteristics of rock provides the necessary understanding to design effective radar surveys. Measurements of the electrical properties of the major Bushveld plati
Jan 1, 2005
-
Equipment selection based on the AHP and Yager’s methodBy M. Yavuz
One of the challenging problems for optimization in mining operations is to choose the best equipment among the alternatives. Equipment selection is an important task for mine management due to its op
Jan 1, 2015
-
Pitfalls In Vezin Sampling For Finely Crushed Materials (4f77bfd3-c00c-4e22-9de0-dc8343fb6770)By C. Kruger
Anglo American Platinum has adopted a strategy of best practice principles (BPP) for sampling, mass measurement, analysis, and metal accounting for more than a decade now. When new plants are designed
Jan 1, 2014
-
Communication constraints in the safety system on South African mines and implications for the exercise of the Right to Refuse Dangerous WorkBy N. Coulson, P. F. Stewart
The Mine Health and Safety Act No. 29 of 1996, as amended, embeds an occupational health and safety management system that facilitates communication between representatives of the state, capital, and
Apr 14, 2024
-
Time-Dependent Behaviour Of Hard Rock In Deep Level Gold MinesBy D. F. Malan
In deep level hard rock mining the rheological behaviour of the rock is important as time-dependent aseismic processes can lead to a stable dissipation of energy thus reducing violent outbursts. Under
Jan 1, 1997
-
A Comparison Of The Reheat Cracking Susceptibility Of A Service Exposed High Temperature Alloy Steel With That Of New MaterialBy R. Loots
High temperature creep resistant alloys are used in power plants as steam pipes and headers where they have to withstand super heated steam temperatures of up to 600ºC for the lifetime of the plant. F
Jan 1, 2004
-
A New Underground Auger Mining SystemBy I. L. Follington
This paper describes the research and development programme to develop a prototype underground auger mining system aimed at developing and demonstrating an underground auger mining system able to prov
Jan 1, 2001
-
A critical evaluation of processes to produce primary titanium - SynopsisBy D. S. van Vuuren
Over the last 60 years many different processes were conceived to reduce the cost of titanium produced by the Kroll process. However, success eluded all previous efforts, which were consequently termi
Jan 1, 2009
-
"The Advantages Of Ili Inspection And Practical Issues Involved In Undertaking Projects". - IntroductionBy Ernie Holden, Chris Ringas
In the last 20 years, In Line Inspection (ILI) using intelligent pigs has become the principal tool used by pipeline operators to assess the condition of their pipelines. New pipelines are normally de
Jan 1, 2006
-
Unplanned dilution and ore loss prediction in longhole stoping mines via multiple regression and artificial neural network analysesBy H. Jang, Y. Kawamura
Unplanned dilution and ore loss directly influence not only the productivity of underground stopes, but also the profitability of the entire mining process. Stope dilution is a result of complex inter
Jan 1, 2015
-
Application Of Nanofiltration In Metal RecoveryBy I. W. van der Merwe
Recently, a new kind of filtration has emerged, namely nano-filtration (NF). It is a membrane-based process which exhibits totally unique separation characteristics for dissolved salts as well as for
Jan 1, 1998
-
Alignment Of SAMREC Reserve With Mining PlanBy L Tolmay, L Nair
Investor confidence can be compromised when one observes large discrepancies between the SAMREC reserves and the mining plan. It is therefore up to the responsible persons to ensure that all contribut
Jan 1, 2007
-
Capping and Kriging Grades with Long-Tailed DistributionsBy M. Maleki
Variogram analysis and kriging lack robustness in the presence of outliers and data with long-tailed distributions, which often arises when estimating grades in precious metal deposits. The capping te
Jan 1, 2014
-
Origins Of Some Fractures Around Tabular Stopes In Deep South African Mines ? SynopsisBy G. van Aswegen
The geometry and morphology of a set of low-angle fractures around a stope in a deep Witwatersrand gold mine are explained in terms of extension fractures forming under variable conditions of stress.
Jan 1, 2012
-
Building A Database For The Prediction Of Phases In Pt-Based SuperalloysBy L. A. Cornish, S. N. Prins, R. Süss
The work is being done using the Thermo-CalcTM software, and the database is being built up by obtaining good thermodynamic descriptions of all of the possible phases in the system. The database suppl
Jan 1, 2006
-
Silicon Processing: From Quartz To Crystalline Silicon Solar CellsBy B. S. Xakalashe
Keywords: Pyrometallurgy, silicon, solar cells Silicon has been the dominant material in the photovoltaic (PV) industry since its application in the space industry in 1958. This review focuses on
Jan 1, 2011
-
Piloting Of The Ishigaki Fibre-Wakishimizu (Fibre Media Rapid Filtration Equipment) At Skorpion Zinc - SummaryBy K. Nong, H. F. Fuls
The quality of Pregnant Leach Solution (PLS) at Skorpion Zinc is of utmost importance for efficient operation of the Solvent Extraction (SX) Plant. Suspended solids in the PLS forms CRUD in the settl
Jan 1, 2007
-
n Oorsig oor die biologiese behandeling van sianiedbevattende afvalwater* (A review of the biological treatment of cyanide-bearing waste water)By J. H. deur Potgieter
This paper, 'A review of the biological treatment of cyanide-bearing waste water' discusses the necessity for the treatment of cyanide-bearing waste water with a view to the avoidance of env
Jan 1, 1991
-
Process Developments At Tailings Leach PlantBy Martin Banda, Gift C. Chisakuta, Moses Chabinga
KCM made a major modification to the Nchanga Tailings Leach Plant (TLP) changing the circuit from feeding post leach thickeners in parallel with leach discharge for solid ?liquid separation to a Count
Jan 1, 2005