Simulation In Mineral Processing History, Present Status And PossibilitiesBy A. J. Lynch
Mineral processing models have been discussed for many years but it was not until digital computers became available about 1960 that serious attempts at circuit simulation could be carried out. Even t
Jan 1, 1999
-
Utility-based framework for optimal mine layout selection, subject to multiple-attribute decision criteriaBy F. M. C. C. Vieira
Four mining alternatives for exploiting an ultra-deep orebody were assessed through a multidisciplinary evaluation process which involved: the generation of a 3D geological model; the design and sched
Jan 1, 2003
-
Current And Potential Applications Of Fluid-Bed Technology In The Ferroalloy IndustryBy G. Denton, P. den Hoed, A. Luckos
The potential application of fluidized beds in several sectors of the ferroalloy industry is promising. They can be used in the direct reduction of iron ores to produce a feed for steelmaking, in the
Jan 1, 2007
-
Casting And Cooling/Crushing Of Silicon Metal And Silicon Alloy At Bécancour Silicon Inc.By D. Ksinsik, R. Boisvert, D. Leblanc
Casting, cooling and crushing/sieving of ferroalloys has followed a well-established pattern in the whole ferroalloys industry for many years. Usually liquid metal or alloys are cast into flat open m
Jan 1, 2004
-
Development of a corrosivity classification for cement grouted cable strand in underground hard-rock mining excavations - SynopsisA systematic study of groundwater conditions at eight underground mine sites exhibiting a wide range of groundwater qualities throughout Australia has been completed at the WA School of Mines. This ha
Jan 1, 2008
-
Optimization of geological lead-time in a feasibility study drill out—Two Rivers Platinum, Mpumalanga, South AfricaBy Hornsey R., P. van der Merwe
The Two Rivers Project is a feasibility study to evaluate the UG2 chromitite layer on Dwarsrivier372KT, Mpumalanga Province, South Africa. The project, which commenced in August 2001, is expected to r
Jan 1, 2003
-
Assessment of filter fabrics for chamber filter presses in the mining sector with focus on filtration properties, regenerability and service life, B. Fränkle, P. Morsch, B.T. McKenna, and H. NirschlBy B. T. McKenna, H. Nirschl, P. Morsch, B. Fränkle
Generally, filter media used in filter presses have a limited operational life. Besides mechanical damage, there is a growing deposition of fine particles with increasing filtration cycles, the so-cal
Jan 1, 2020
-
Improving the quality of tinplated steel using a novel technique to study the effect of industrial process parameters - SynopsisBy G. S. Maré
Tin plating operations are of a complex nature due to the many operational variables that need to be controlled in order to create a product of required quality. The work in this report lays the bas
Jan 1, 2010
-
Potential Metallurgical Treatment Of Copper Concentrates With High Arsenic Contents - SynopsisBy I. Mihajlovic
This paper investigates a potential method for arsenic removal from copper concentrates using hypochlorite leaching. The problems concerning pyrometallurgical processing of copper concentrates with hi
Jan 1, 2011
-
Improving The Trough Opening Process At Premier Mine Utilizing Electronic Delay DetonatorsBy H. Möhle
Premier Mine is a large underground diamond mine, situated at Cullinan in the Gauteng Province of South Africa. The mine hoists over 3 millions tons of diamond bearing kimberlite per year, from a mode
Jan 1, 2000
-
Calcium and magnesium rejection from sulphate solutions in lateritic nickel solvent extraction using Versatic 10 acid-LIX®84-IC system - SynopsisBy B. Ndlovu
The world mineral industry has over the years experienced growth in the production of nickel (Ni) due to its use not only in the catalytic industry but mainly also to its demand in the stainless steel
Jan 1, 2008
-
Design Considerations For The Damang Open Pit ExpansionBy A. Haines, O. Varaud, I. Baidoo
Abosso Goldfields Limited (AGL) is in the process of developing an expansion of their Damang Open Pit gold mine in Ghana. AGL acquired the Damang mine in January 2002, with SRK participating in the ge
Jan 1, 2006
-
Mine Development - Access To DepositBy S. M. Rupprecht
A deposit to be mined by underground methods can be accessed by a number of methods: ? Adit ? Decline or ramp ? Inclined shaft ? Vertical shaft. Adits are an economical approach when the
Jan 1, 2012
-
The West Driefontein Reclamation Carbon-In-Pulp Plant; Pilot Plant Testwork, Design, Commissioning And OptimizationBy G. D. Buson
Driefontein Consolidated Limited has a proud history in the South African gold mining industry dating back to March 1945 with the formation of the West Driefontein Gold Mining Company. The reclamation
Jan 1, 1999
-
Estimation of Rock Strength From Quantitative Assessment of Rock TextureBy C. A. Ozturk
The compressive strength of rock (sc) has an important effect on design of structures in rock engineering. Compressive strength can be determined in the laboratory using the uniaxial compressive stren
Jan 1, 2014
-
Rapid Installation Of Support In A Partially Raise Bored Shaft Using Sky Jacks. ? SynopsisBy D. Strachan
Installation of support in known poor ground intersections during reaming operations requires rapid access to stabilize the shaft wall and thus to prevent the loss of the shaft through scaling. This i
Jan 1, 2009
-
The Use Of Performance Monitoring Techniques In Detecting Process Shifts And Potential Root Causes In A Variable Speed Grinding ApplicationBy T. Khumalo, L. P. Coetzer
This paper addresses the impact of the variable speed drive on the particle size distribution in the product of a fully autogenous UG2 grinding circuit. It further discusses the impact of a varying pa
Jan 1, 2006
-
An economic risk evaluation approach for pit slope optimizationBy L. F. Contreras
In open pit mine design, it is customary for geotechnical engineers to define the appropriate slope design angles within practical limits. The conventional approach to slope angle design is based on t
Jan 1, 2015
-
Shear-bond strength testing of thin spray-on liners - SynopsisBy H. Yilmaz
A testing method for assessing the shear-bond strength of thin spray-on liner (TSL) on rock substrate was developed at Wits University Rock Mechanics Laboratories. The gap between a 20 mm thick steel
Jan 1, 2007
-
Using MIP for strategic life-of-mine planning of the lead/zinc stream at Mount Isa MinesBy M. L. Smith, G. Karunatillake
Lead-zinc production at MIM, Mount Isa includes three mines, a lead concentrator, zinc filter plant and lead refinery. Lead production is vertically integrated with lead-silver bullion shipped from Au
Jan 1, 2003