Challenges Of Earthen Cofferdam In Deep Excavations For Waterfront Structures, A Case StudyBy Balasubramani M., Ramana P. V., Bairagi K.
This paper is a case study of an earthen Cofferdam, constructed for a deep excavation at Intake location in river Aaundha, Maharashtra, India. A 12 m (39 ft) deep excavation was made to construct the
Nov 1, 2022
-
Soil Cement Tensile Strength and Modulus as a Function of Unconfined Compressive StrengthBy Dominic Parmantier, Jason Page
"In the past, the designers of DSM have analyzed various failure modes and then specified a minimum unconfined compressive strength (UCS) for the soil-cement. The specified minimum UCS reflected the c
Jan 1, 2015
-
Bertha Rescue Shaft – SR99 TunnelBy Lance Rasband, Richard Hanke
"Seattle Tunnel Partners (STP) started mining on Seattle’s SR99 tunnel on July 30, 2013, working slowly through a 15 ft (4.6 m) thick fiber-reinforced concrete headwall. Once through the headwall, the
Jan 1, 2015
-
Outstanding Issues In Understanding The Behaviour Of Thermally-Activated Pile FoundationsBy Teresa M. Bodas Freitas, Arianna Lupattelli, Peter J. Bourne-Webb, Diana Salciarini, Martina Zito, Donatella Sterpi
The thermomechanical response of thermally-activated (TA) piles under monotonic thermal loads is quite well understood and the remaining uncertainties relate to the effect of long-term, cyclic loading
May 1, 2022
-
Overview Of Enabling Works For Waterfront Structures – Design & ConstructionBy Nagarajan. D, Raja Rajan. K, Vijayakumar. T
Major bridges crossing mighty rivers must be constructed in flowing water. Constructing the sub-structure in water has been a challenging job for contractor. Special construction techniques with marin
Nov 1, 2022
-
Wet Soil Mixing For Foundation Support and Liquefaction Hazard Mitigation for the Ventura Cancer CenterBy Thang V. Nguyen, Lisheng Shao, Gary E. Taylor
"The Community Memorial Hospital of Ventura, California, proposed to build a new state-of-the-art Cancer Treatment Center with radiation shielding walls and roof. The loose silty soils at the site had
Jan 1, 2015
-
Transformation From Classical 2D To Digital 3D Thinking Process In The Design Of Geotechnical Structures: Perspective Of A Geotechnical ConsultantBy Harald Vogel, Johannes Lachenski, Friedemann Koetzel, Sebastian Schnell
In this paper, a digital subsoil approach, a work-in-progress, will be presented describing the transformation from a classical 2D to digital 3D thinking process in the design of geotechnical structur
May 1, 2022
-
CPT Methods for Helical Pile DesignBy Howard A. Perko, Margaret Dring, Gerald Verbeek, Scott Slaughter
Helical piles have become a widely used deep foundation system in recent years due to their many inherent advantages. The cone penetration test (CPT) is commonly used in geotechnical practice to evalu
Sep 8, 2021
-
Comparison of the Pre-Construction and Production QC Test Results for the Sela-22 Elliptical Jet Grouting Project (New Orleans, LA)By Filippo Maria Leoni, Alessandro Bertero, Gianluca Pianezze
"As part of the Southeast Louisiana (SELA) drainage program, designed by the U.S. Army Corps of Engineers (USACE) to reduce flood damages in the City of New Orleans and surrounding parishes through th
Jan 1, 2016
-
Innovative Deep Foundation Support Using Ductile Iron PilesBy Thomas Billups, Brendan FitzPatrick, Doug LeDo, David Carchedi
"Working in urban environments presents unique logistical challenges beyond those typically associated with traditional geotechnical analysis and design. These challenges often include working on site
Jan 1, 2016
-
3D FEM Modelling of a Ground Improvement SolutionBy Yazen Khasawneh, Osvaldo P. M. Vitali, John E. Agee, Mohammad Nassim
A 3D FEM modeling of a ground improvement solution for an ice rink slab with stringent differential settlement limits is presented. Due to the complexity of the geotechnical conditions and strict defo
Sep 8, 2021
-
Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-WallsBy Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city
Sep 8, 2021
-
Sloping Rubble Marine Seawalls Founded on Soft Soil Improved by Stone ColumnsBy Eleonora Di Mario, Colin B. Turnbull, Matthew G. Mills, Chengbin Miao, Wilhelm S. Degen
"In the past decade, the ‘zero-dredge’ philosophy has become the preferred option for the formation of marine seawalls and reclamations, compared to the partially or fully dredged options, as this sol
Jan 1, 2017
-
Ground Improvement by Dynamic Replacement within Intertidal Mangrove Mud Environment, Ichthys LNG, DarwinBy J. Racinais, P. Vincent
"In September 2011, Menard Oceania (MO) was engaged by Mac Mahon John Holland Joint Venture (MJHJV) to provide ground improvement solution for the $34bn Ichthys LNG development. With close to 400,000m
Jan 1, 1900
-
Deep Foundations for Top-Down Construction of High-Rise ProjectBy Martin B. Hudson, Kenneth S. Hudson, Gwendolyn Arreguin
A twin high-rise project site in Century City posed several foundation engineering challenges for the design team. One portion of the twin high-rise project site was required to utilize top-down const
Jan 1, 2019
-
Nicholson In The Neighborhood: Virginia’S North Hill ProjectBy Dominic Ammon, Mark Rothbauer, Paul Landers P. E.
Across the Potomac River from the location of the DFI47 Annual Conference (October 2022), in Alexandria, VA, two large permanent anchored walls with a decorative shotcrete face were recently construct
Oct 1, 2022
-
Fundamentals FirstBy Jeffrey C. Schuh, Logan Bloemer, Daniel P. Dietzler
Over the past 30 years, the authors have encountered numerous projects where recognizing the geology, soil properties and groundwater conditions, and considering alternative construction techniques ha
Jan 1, 2019
-
Cement Deep Soil Mixing Shear Wall Stabilization Calaveras Dam Replacement Project, CaliforniaBy Michael Forrest, John Roadifer, Glen Gorski
"The Calaveras Dam Replacement Project (CDRP) requires large disposal sites to store excess excavated materials that could not be utilized for dam construction. Because of access restrictions during d
Jan 1, 2015
-
Collaborative Value Engineering Redesign - DFI 2020By Martin Mcdermott, Kevin Tehansky, Robert Ross, Jeffrey Goodwin
A foundation value engineering redesign is a collaboration between the project owner, original design team, general contractor, foundation contractor and redesign team. Without the acceptance and coll
-
Jet Grouting for Strength in Marine Sediments with HydrocarbonsBy Paul M. Schuman, Alessandro Bertero, Giuliana A. Zelada, Sharon G. Cranston
Many jet grouted columns were recently installed to create a jet grout-treated soil foundation for an earthen embankment used in a large shoreline stabilization project in the Mystic River in Charlest