    A Resilience Approach for Design of Earth Retaining Systems with Application on MSE Walls

    By George Gazetas, Sissy Nikolaou, Fani Gelagoti, Irene Georgiou, Rallis Kourkoulis

    "The need to shift geotechnical design from a “factor of safety” to a “performance based” design (PBD) approach has increased rapidly in the past years following examples from structural engineering.

    Jan 1, 2016

  • DFI
    Performance Monitoring of Mixed Ground Working Platform for a CCR Surface Impoundment

    By Ali Ebrahimi, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, Roneet Das, William Tanner, Amir Ahmadipur

    There are safety concerns related to operation of heavy equipment over coal combustion residual (CCR) impoundments during construction of the impoundment closure programs. As part of a pilot study pri

    Jan 1, 2019

  • DFI
    The Use of Rigid Inclusions to Support Large Spans

    By Michael Shedlosky, Sonia Sorabella Swift, Nina Carney, David Tarasovic

    Rigid inclusions were used to support roadway fills and mechanically stabilized earth (MSE) walls for the South Capitol Street Corridor project. The first phase of this two-phase, nearly $1 billion pr

    Jan 1, 2019

  • DFI
    Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KY

    By Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba

    "Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in

    Jan 1, 2015

  • DFI
    Measurements of CDSM Strengths and Seepage Data Following Seismic Upgrades of San Pablo Dam

    By Atta B. Yiadom, A. David Miller, Robert C. Kirby, Sean M. Todaro

    "San Pablo Dam is a 170-foot (52-meter)-high earthfill embankment, located approximately 10 miles (16 kilometers) north of downtown Oakland, California, that impounds a 38,600 acre-feet (47.6 million

    Jan 1, 2015

  • DFI
    TBM Recovery Shaft Construction - SR-99 Tunnel

    By Lance Rasband, Richard Hanke, John Starcevich

    "The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure

    Jan 1, 2016

  • DFI
    Deep Foundation Support for the Iconic New York Wheel

    By Satyajit Vaidya, Rudolph Frizzi, Quadri Owokoniran

    "This paper presents a case history in the design and construction of high-capacity drilled shafts for the iconic New York Wheel presently being constructed along the St. George area waterfront in nor

    Jan 1, 2016

  • DFI
    Liner Piles Used As Support To Kentledge For Initial Compression Load Test

    By Venugopal B, M Kumaran, Thomas John, Vetriselvan A

    The initial pile load tests are conducted to ensure the geotechnical capacity of the pile in a particular site condition. Normally kentledge method is adopted for the compression pile load tests. In t

    Nov 1, 2022

  • DFI
    How Well Do Helical Piles Resist Earthquakes as Foundation Systems? WHERE TO GO FROM HERE?

    By Amy B. Cerato, Shawn Allred, Tatiana Vargas

    "Helical piles are deep foundation elements that resemble, and are installed like, a large steel soil screw — they have a slender steel shaft with one or more round helix bearing plates welded to the

    Jan 1, 2017

  • DFI
    Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs Extension

    By Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee

    "The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u

    Jan 1, 2015

  • DFI
    Construction of a Ground Improvement Scheme to Support Large Mechanically Stabilized (MSE) Earth Walls in Kitimat, BC – Using Cutter Soil Mixing

    By James Coull, Brian Wilson, David Siddle

    "In 2012, Golder Construction Inc. was awarded a Design-Build contract for the design and construction of an extensive, deep ground improvement scheme to support up to 20 metres (66 ft) high Mechanica

    Jan 1, 2017

  • DFI
    In-Situ Study On Improvement Of Soft Ground Using Stone Columns For Railway Embankment

    By Kishore Kumar B., Eswaran Prasad C R, Srini Naik B., Ramakrishna Raju N

    The authors through this paper intend to introduce the non-vibro technique of ground improvement by stone column, being used for the first time in India under the Western Dedicated freight Corridor in

    Nov 1, 2022

  • DFI
    Utilizing Real-Time Data and Statistical Analysis for Wet Soil Mixing: A Case History

    By Sunil Arora, Lisheng Shao, Chris Conkle

    "The East Garden Grove - Wintersburg Channel located in Orange County, California, required upgrades along the levees to mitigate potential liquefaction and lateral spreading hazards. The Orange Count

    Jan 1, 2015

  • DFI
    Mobilizing CIDH Pile Base Resistance on the Gerald Desmond Bridge Replacement Project with Tip Grouting

    By Adam Zagorski, Rusty Lucido, Curt Scheyhing

    "The current California Department of Transportation (Caltrans) practice based on AASHTO LRFD Bridge Design Specifications is to use the O’Neill and Reese method (FHWA, 1999) for calculating the side

    Jan 1, 2017

  • DFI
    Field Test Verification Of Ground Bearing Pressure Under Rig Tracks And Implications For Working Platform Design

    By Steffen Schweizer, Tadeusz Brzozowski, Alfred Koller, Michał Topolnicki, Jürgen Wäger, Grzegorz Sołtys

    A full scale test has been conducted to determine ground bearing pressure under rig tracks. The track loads were recorded in real time using Liebherr's Ground Pressure Visualisation system, and the ve

    May 1, 2022

  • DFI
    Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach

    By M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek

    "The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB

    Jan 1, 2016

  • DFI
    An Enhanced P&H Tensionless Pier Foundation for Onshore Wind Turbines

    By Yazen Khasawneh, Osvaldo P. M. Vitali, Mohammad Nassim

    The demand for renewable energy is growing as the conventional energy resources are becoming more limited and we are more conscious about the negative impact of conventional energy sources on the envi

    Sep 8, 2021

  • DFI
    Top-Loaded Bi-Directional Test and the Conventional Bi-Directional Load Test, a Direct Comparison

    By Patrick J. Hannigan, Seth Robertson, Frank Rausche, Rozbeh B. Moghaddam

    The Top-Loaded Bi-Directional Test (“TLBT”) and the conventional Bi-Directional Load Test (“BDLT”) are full-scale load tests where loads are applied bi-directionally to the foundation element. The BDL

    Sep 8, 2021

  • DFI
    Construction of a Deep Slurry Cutoff Wall for the Sacramento River East Levee Program

    By Louay Owaidat, Daniel Jabbour, Allan Frappier, Jose Gomez, Mark Stanley, Tino Maestas

    The U.S. Army Corps of Engineers (USACE) is implementing a levee strengthening program along the Sacramento River East Levee (SREL) designed to correct 11 miles of deficient levees as identified by re

    Sep 8, 2021

  • DFI
    Buttressing Berms for Stability of Cantilever Sheet Piles – Limit Equilibrium and Finite Element Approaches

    By Ali Ebrahimi, Meena L. Viswanath, John F. Beech, Mustafa B. Erten, Ming Zhu

    "Excessive deformation of a cantilever sheetpile wall can occur due to dredging, excavation, backfilling, or long-term creep behavior of soil. A buttressing berm constructed in front of the wall can b

    Jan 1, 2016