Ground Improvement Utilizing Vibro Probes Eliminates Liquefaction Concern For A Bridge FoundationBy Aly M. Mohammad
Croton Point Avenue Bridge carries Croton Avenue over Metro-North main tracks at Harmon Rail Yard in Westchester County, New York. The new bridge is 1100 foot long and 36 foot wide nine span structur
Jan 1, 2007
-
Tension Testing of the Grouted Anchorage Assembly for Multistrand AnchorsBy Lucian L. Bogdan
"SummaryActive loaded strand anchors are often used for slope stabilization, retaining walls or tiedown anchors. Normally, strands are tensioned against the structure and wedges are locked inside the
Jan 1, 2005
-
DEEP FOUNDATIONS INSTITUTE 45th ANNUAL CONFERENCE ON DEEP FOUNDATIONSBy Sebastian Lobo-Guerrero
Welcome to DFI45! our first on-line annual meeting. We cannot deny the severe impacts that the COVID19 pandemic is having in our industry and our lives. We extend our support to all of our members tha
Oct 27, 2020
-
Installation Of Augered Cast-In-Place Piles - Equipment (66bbaadf-14f6-4860-86d8-a6149d09411b)? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 1998
-
Switching From Monetary Process Management To Critical Success Factors Using An Appropriate Process Information SystemBy Jochen Maurer, Dr. Christian Hoyme, Dr. Hans Regler
Currently, it is very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. As a rule, companies depend on reports from on-site e
-
Evaluation Of Pile Load Test ResultsBy Rasin Duzceer
In this paper, the results of pile load test on 24 piles from twelve sites are presented. The pile load tests were performed on 14 driven and 10 bored piles of varying diameters and lengths installed
Jan 1, 2002
-
LRFD For Deep Foundations: Replacing The Traditional Factor Of Safety In DesignBy Lance A. Roberts
The Federal Highway Administration (FHWA) has mandated the use of the AASHTO Load and Resistance Factor Design (LRFD) specifications for all new federally-funded transportation infrastructure projects
Jan 1, 2008
-
Use Of Installation Effort To Evaluate And Design Drilled Displacement Piles In Fine-Grained SoilsBy W. Morgan NeSmith
A drilled displacement pile program was utilized for the expansion of an existing power plant in Cohasset MN adjacent to the Mississippi River. The drilled displacement (DD) pile is an innovative foun
Jan 1, 2008
-
Woodrow Wilson Bridge CofferdamsBy Roderic A. Ellman
The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.
Jan 1, 2005
-
Wick Drain Guide Specification (Method)"1.0 DESCRIPTIONThis work consists of furnishing all necessary labor, equipment, and materials to install prefabricated vertical (wick) drains in the ground in accordance with the Plans and as specifi
Jan 1, 2014
-
Steel Innovation: Changing the Economics of Below Grade FoundationsBy Dean Abbondanza
"Below grade foundation design has construction issues that above grade foundations do not. These cost factors are dependent on soil conditions and vary by region, but for the most part, the process r
Jan 1, 2005
-
Designed, Load Tested, Installed, And Integrity Tested ACIP Piles At Lovers' Key Site In Southwest FloridaBy Gregory A. Stephan
A case history of design, prediction, instrumented static load tests on probe piles, installation monitoring, and integrity testing of production piles is presented. Based upon project-specific subsoi
Jan 1, 1999
-
Soil Mixing And Jet Grouting Ground Improvement Under TanksBy Lisheng Shao
Soil mixing and jet grouting have been widely used to support heavy structures such as tanks, cement silos, and storage buildings. Although the installation methods vary between soil mixing and jet g
Jan 1, 2010
-
Piled Raft Floats On MoraineBy Terence P. Holman
Instrumented load testing of high capacity micropiles, followed by detailed analysis and numerical modeling, provided an opportunity for real foundation performance to be incorporated into the design
Jan 1, 2007
-
UHE Peixe Angical: Secant Cutoff Wall in Uncertain GeologyBy Dario Libano, Armando Caputo, Francisco Caputo
"UHE Peixe Angical is a 452 MW hydroelectric power plant located on the Tocantins River in Tocantins, Brazil. In 1999, geologists began feasibility studies to estimate the river’s hydroelectric potent
Jan 1, 2009
-
Selmon Expressway, Tampa: Case History of Drilled Shaft Design for Extreme VariabilityBy Ross T. McGillivray, David S. Graham, Dan A. Brown, Steven D. Dapp
"The Selmon Expressway includes an elevated structure extending across several miles of weathered karstic limestone geology, and represents a challenge for design because of the high variability of th
Jan 1, 2015
-
A Case History On Design, Construction, And Performance Of Stone Column Ground Improvement Beneath An Mse EmbankmentBy Karen Dawson
This paper presents a case study of the deformation-based design, construction, and performance of stone column ground improvement (GI) beneath a mechanically stabilized earth (MSE) wall and bridge ab
-
A Case History on Design, Construction, and Performance of Stone Column Ground Improvement beneath an MSE EmbankmentBy Dominic Parmantier, Karen Dawson, Suthan Pooranampillai, Seungcheol Shin
"This paper presents a case study of the deformation-based design, construction, and performance of stone column ground improvement (GI) beneath a mechanically stabilized earth (MSE) wall and bridge a
Jan 1, 2017
-
Construction Of A Spillwall In The Columbia RiverBy Francis B. Gularte
The Dalles Dam is located 192 miles upstream from the Columbia River?s mouth. As part of an effort to increase survival rates for young salmon migrating downstream to the Pacific Ocean, a river spillw
Jan 1, 2010
-
Integrity Testing Methods"Integrity tests refer to a variety of non-destructive tests (NDT) whose purpose is to measure or determine the quality and uniformity, and some- times dimensions, of cast-in-place concrete foundation