Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Development and Calibration of an Autogenous/Semi-Autogenous Mill Simulation Model for Process Control Applications

    By É. Poulin, J. Bouchard, E. M. Pérez-García

    Process control and optimization have always been crucial aspects in the mineral processing industry, and expectations constantly increase to cope with more stringent security, quality, efficiency, an

    Jan 1, 2019

  • CIM
    The Cigar Lake uranium deposit: discovery and general characteristics

    By K. Schimann, H. D. Knipping, J. P. Fouques

    "The Cigar Lake uranium deposit, in the Athabasca area of north Saskatchewan, was discovered in May 1981 by Cogema (Canada) Ltd., as operator of the Waterbury Lake Joint Venture.The deposit, which is

    Jan 1, 1986

  • CIM
    Removal of Arsenic and Dissolution of Copper from Arsenic Bearing Copper Ore by High Pressure Oxidative Leaching

    By Kazutoshi Haga, Batnasan Altansukh, Atsushi Shibayama, Ryuji Oinuma

    "Recently, the arsenic grade in copper ores has been increasing year by year. Arsenic bearing minerals (enargite (Cu3AsS4) and tennantite (Cu12As4S13)) coexist with typical copper minerals such as cha

    Jan 1, 2016

  • CIM
    Quantifying Dependencies in Computer-Based Mining Simulation Modeling

    By Mustafa Kumral

    Monte ? Carlo simulation is often used to assess the risks associated with uncertain variables in mining operations. The success of Monte-Carlo simulations depends upon reproducing the dependencies am

    Aug 1, 2013

  • CIM
    Utilization and Implementation of Geothermal Systems and Ground Source Heat Pumps for Underground Mine Cooling

    By K. Robertson, K. A. Scalise, K. C. Kocsis, M. B. Teixeira

    "Many deep and highly mechanized underground metal mines require cooling. In many cases, appropriate working conditions might be fulfilled by ventilation alone, but some require the implementation of

    Jan 1, 2019

  • CIM
    Recent Developments in Electric Arc Furnace Technology

    By E. R. Landry

    This paper reviews the current state of electric furnace technology, with emphasis on some of the more recent developments. A large section of the paper is devoted to the use of increasingly high powe

    Jan 1, 1967

  • CIM
    A Continuum Damage Modeling Approach for Simulation of Hydraulic Fractures

    By A. Dahi Taleghani, A. Shojaei

    Continuum damage mechanics (CDM) of rocks is studied together with their elastic and plastic behaviors to develop simulation tools for hydraulic fracturing jobs in naturally fractured formations. The

    Jan 1, 2015

  • CIM
    A Numerical Study on Oscillating Disc Cutting (ODC) Technology for Hard Rock Cutting

    By M. Ghamgosar, Erarslan N.

    Rock cutting includes many unknown parameters which result in different consequences of the different cutting conditions. However, based on the current suggested models for rock cutting, there are som

    Jan 1, 2015

  • CIM
    Silicates – A New Challenge for Mineral Processing for LKAB in Kiruna, Sweden

    By Kari Niiranen, Andreas Boehm

    LKAB (Luossavaara-Kiirunavaara AB) is operating underground iron ore mine, with three beneficiation and pelletizing plants in Kiruna, Northern Sweden. The wet low intensity magnetic separation (WLIMS)

    Jan 1, 2016

  • CIM
    Mine Closure and Exit Strategies. Risk Financing Solutions for Environmental Liabilities and Sustainability

    By Paul T. Fitzgerald

    Risk financing solutions are emerging to fully address environmental liabilities for mining operations. Supported by specialized insurance and alternative risk transfer (ART) products, mine owners can

    Apr 1, 2005

  • CIM
    Filtration Fundamentals

    By N. Nemeth

    A brief summary of available filtration research is given. Its usefulness and shortcomings to practical application are examined and suggestions for new avenues of research outlined.

    Jan 1, 1967

  • CIM
    The V ALMIN Code - the Australian experience "Valuation 1 Session" Mining Millennium 2000 PDAC/CIM, 5-10 March 2000, Toronto, Canada.

    By Michael J. Lawrence

    "The VALMIN Code was developed and formally adopted by The Australasian Institute of Mining and Metallurgy (AusIMM) in 1995 and a revision was issued in 1998. The VALMIN Code applies to all relevant r

    Jan 1, 2003

  • CIM
    Autonomous Thin Spray-on Liner Application in Irregular Tunnel and Mine Roadway Surfaces

    By M. P. Tibbs

    An autonomous spray application system for a structural Thin Spray-on Liner (TSL) is targeting productivity and safety on underground coal continuous miners by potentially replacing steel mesh, and ha

    Aug 1, 2013

  • CIM
    Ring Gear Inspection Using Eddy Current Array (ECA) Combined With Alternating Current Field Measurement (ACFM) Techniques

    By Tom Shumka

    All mineral processing facilities that use girth gear driven mills need to inspect the gear teeth on a routine basis, whether it is every six months or every three years. The inspection frequency depe

    Jan 1, 2012

  • CIM
    Mining REDD+ for a Green Economy - Good business, climate stabilization, shareholder value, and reducing risk

    In-Country Business Development Agenda ?Siting/Permitting/Operational Planning ?Securing, maintaining, enhancing social license to operate ?Biodiversity conservation and ecosystem services ?IF

    Aug 1, 2013

  • CIM
    Phase Relations and Precious Metals Distribution in the Cu-Fe-S-As and Cu-Fe-S-Sb Systems Saturated With Carbon at 1473 K

    By L. Voisin, K. Itagaki

    In the reductive smelting of the copper concentrate like a blast furnace operation using coke as fuel and reductant or in processing the copper concentrate which contains coal in the bulk, a sulfur-de

    Jan 1, 2007

  • CIM
    Coal crushing

    By B. W. Raymond, D. W. Zandee

    "IntroductionCoal deposits are found in many regions in Canada and vary widely in their age, quality and rank. All classifications of coal except anthracite are found in significant quantities in this

    Jan 1, 1989

  • CIM
    Loading and Blasting a Hot Pillar Remnant

    By Roland Hunt

    This paper deals with the practical problems as sociated with blasting a heated pillar remnant. This pillar remnant was the final stage in the blasting of a multi-stag e pillar blast. Production from

    Jan 1, 1977

  • CIM
    The Plant Engineering and Maintenance Association of Canada

    By Norm Clegg

    The Plant Engineering and Maintenance Association of Canada PEMAC is a national, not-for-profit industry association for plant and facility maintenance, engineering and physical asset management in a

    Feb 1, 2008

  • CIM
    Integrating Environmental Management and Mine Production Management

    By Chelto. D. Smith

    With the pressure on mine and metallurgical managers to take accountability for responsible corporate governance in their operational area, it is no longer acceptable to rely on central departments in

    May 1, 2009