    TIG Welding of Single Crystal CMSX-4 Alloy

    By J. Dupre, A. Gontcharov, H. Pepin

    Produced by the conventional TIG welding CMSX-4 welds had been studied. It was demostrated that microstructure of welds depended on filler materials, welding parameters and joint design. Epitaxial sol

    Jan 1, 2006

  • CIM
    Milling

    By David C. Cook

    The milling complex, situated just east of the Cassiar townsite, receives raw ore from the tramline and processes it into 105,000 tons per year of milled asbestos fibre. The ore is passed through a co

    Jan 1, 1978

  • CIM
    Towards Mechanistic Descriptions of Charge and Slurry Transport in Tumbling Mills (9cf2cc6c-a5a7-4d0b-861d-5dfc2f8aa93b)

    By D. J. Parker, G. B. Tupper, I. Govender

    Positron-Emission-Particle-Tracking (PEPT) has enabled the non-invasive observation of charge and slurry transport in model mills under operational conditions. We use high quality PEPT data to infer t

    Jan 1, 2012

  • CIM
    Coarse Size Pre-Concentration of Low Grade Copper Ores by Dense Medium Separation

    By Y. Hou, E. Arinaitwe, L. Tong

    A series of dense medium separation (DMS) tests were performed on four low-grade copper ores from Mount Polley mine in order to determine their amenability to pre-concentration. The tested ores contai

    Jan 1, 2014

  • CIM
    In Situ Image Analysis of Batch Settling of Flocculated Minerals with Physical-Statiscal Feature Extraction Method

    By M. R. MacIver, M. P. Pawlik

    "An image analysis method based on chord length distributions is applied to the batch settling of polyacrylamide flocculated kaolin suspensions. Two features of the interaggregate void space, the void

    Jan 1, 2016

  • CIM
    Estimation of the in Situ Block Size in Jointed Rock Masses Using Three-Dimensional Block Simulations and Discontinuity Measurements

    By M. Pötsch, A. Kluckner, P. Söllner, W. Schubert

    "The in situ block size is a key parameter in the geomechanical characterization of rock masses. It describes the fracturing of the rock mass and thus is a measure for the degradation of the rock mass

    Jan 1, 2015

  • CIM
    Ore characteristics that Affect Breakage and Mineral Liberation during Grinding

    By W. Petruk

    A study was undertaken to determine whether interrelations between mineral grains affect ore breakage during grinding, and to establish a correlation between ore breakage and mineral liberation. A bas

    Jan 1, 1988

  • CIM
    The Recruitment and Retention of Women in TTO

    Presentation Overview ?WRDC Purpose and Activities ?Women in Trades, Technology and Operations (TTO) Occupations ?Factors in Successful Recruitment / Retention of women (VBNC) ?Recruitment and Ret

    May 1, 2006

  • CIM
    Cretaceous non-swelling bentonite from the Manitoba Escarpment

    By BARRY BANNATYNE

    Non-swelling bentonite has been quarried in Manitoba by Pembina Mountain Clays Limited since 1941. It occurs in several thin layers near the base of the Pembina Member of the Upper Cretaceous Vermilio

    Jan 1, 1984

  • CIM
    Land use issues in mineral extraction

    By K. Sinding, R. Poulin

    "Recent land-use decisions in British Colwnbia, and the publication of a report on compensation for expropriations of resource interests, have highlighted the nature of land use policies. Landuse deci

    Jan 1, 1994

  • CIM
    Comparison of Reinforcement Benefits of Spray-on Linings in Side-by-Side Unconfined Compression Failure Tests on Rock

    By James F. Archibald

    Testing has been accomplished to substantiate recent laboratory trials which have demonstrated that thin liner membranes, applied to rock core samples, can significantly enhance the structural perform

    May 1, 2001

  • CIM
    Design of liner plate culverts for underground mining environment

    By Roy EI. Durr, Glen R. Davidge

    "This paper presents the results of structural analyses and full-scale destructive tests conducted on liner plate culverts. The purpose of this work was to establish a design method and evaluate the s

    Jan 1, 1995

  • CIM
    Haulage Evaluation for an Underground Deposit

    By David L. Sprott

    This paper presents an evaluation of underground-to-surface haulage options for a relatively large deposit. Specifically, it presents a recommended haulage option to provide the greatest value to the

    May 1, 2008

  • CIM
    Mill Expansion at Les Mines Selbaie

    By K. Wood, L. Duval

    "The paper discusses the approach used to add a new, separate 5000 t/d copper-zinc treatment circuit to an existing, 1650 t/d copper circuit, essentially within the existing mill building. Temporary i

    Jan 1, 1987

  • CIM
    Study on Integration of Real-Time Atmospheric Monitoring System Data and MFIRE Simulation

    By L. Yuan, J. H. Rowland, R. A. Thomas, D. Bahrami, G. P. Cole

    "The past several decades have seen a steady increase in the use of atmospheric monitoring systems (AMS) in underground mines as sensor technology has advanced and costs for this technology have decre

    Jan 1, 2019

  • CIM
    Potential for In-Situ Solutionisation of Wire and Arc Additive Manufactured (WAAM) 2XXX Aluminium Alloys

    By J. Fixter, P. Prangnell, Z. Pinter, E. Eimer, B. Chehab

    "High deposition rate Wire and Arc Additive Manufacture (WAAM) can provide benefits to the aerospace industry, including a reduction in lead time, reduced material waste and, through higher solidifica

    Jan 1, 2018

  • CIM
    A Comparison of the Anchorage Performance of Cable Bolts Based on a Newly Developed Testing Methodology

    "With the plethora of cable bolts on the market, geotechnical engineers can be baffled by the differences in performance claims from the manufacturers but perhaps more importantly they are sometimes a

    Jan 1, 2015

  • CIM
    Iron Separation from Iron Bearing Polymetal Chloride Solutions by Means of Hydrolysis and Crystallization

    By H. Weissenbaeck, B. Nowak, M. Oesterreicher, R. Stastny

    The producers of certain metals like nickel and cobalt increasingly face a shortage of easy-to-mine and easy-to-process ore bodies. Their focus is shifting towards alternative raw materials which in t

    Jan 1, 2016

  • CIM
    Best Practices from Surface Mining- Automating Downtime & Production Reporting to Deliver Effective Maintenance

    AGENDA ? Company Overview ? Industry Direction ? Technology to support maintenance ? data access, connectivity, process historian, downtime & production reporting. ? Case Studies Company Overview

    Apr 1, 2005

  • CIM
    Influence of Sample Geometry (Scale Effects) on Mine Backfill Properties

    By Kristie D. Tarr

    Ideally, in situ monitoring would supply the input data for numerical modeling of backfill material property requirements. However, clue to production requirements and costs of conducting field tests,

    May 1, 2008