Recovery of Old Mine Workings in Weak GroundBy McCarthy P. L
With production at Olympic Dam scheduled to commence in June 1988, it has been necessary to install a complete underground ore handling system capable of removing two million tonnes of material a
Jan 1, 1988
-
Technical note-outbursts in Australian coal mines: a petrographic factorBy Botz R. W
Macroscopic and microscopic studies of the outburst-prone Gemini Coal (Bowen Basin) showed that outbursts were associated with a localized inertinite-rich ply. Previous studies of the Gemini Coal had
Jan 1, 1986
-
Platinum-Bearing Magmatic Rocks of the Southern Brook Street Terrane, South Island, New ZealandBy J Mavrogenes, C J. Spandler, S M. Eggins, K Worden
Major occurrences of platinum group minerals (PGM) are in crustally-contaminated, huge, layered igneous complexes (Bushveld and Stillwater) and gabbroic intrusions (Norilsk); relatively minor occurren
Jan 1, 2005
-
The Kanowna Belle Project Progress Towards the Underground MineThe Kanowna Belle deposit was discovered in 1990 following encouraging assays from soil sampling and RAB drilling. At the end of September 1993, diamond drilling had been completed to a vertical dept
Jan 1, 1990
-
Case Study - NWT Diamonds ProjectBy Penny T. G
BHP Diamonds and their joint-venture participants DiaMet Minerals, Chuck Fipke and Stewart Blusson are currently developing Canada's first commercial diamond mine in the arctic barren lands of
Jan 1, 1997
-
Application of a Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model for Subsidence PredictionBy Chugh Y. P
A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the
Jan 1, 1992
-
The Development of a New High-Energy Absorption MeshBy G Giles
One of the main tools used by mining operations to mitigate the risk of rock burst is the installation of a so-called ædynamic resistantÆ support system. Such systems are designed to absorb the impact
Jan 1, 2008
-
The Application of Desktop Computers in Open Pit Mine PlanningBy Visnovsky
The computing needs of a mine planning office vary greatly depending on the staff available and the nature of the work undertaken. Some offices work acceptably with few aids apart from hand held c
Jan 1, 1983
-
Optimising Raising Development Using the Drop Raise Method at DOZ Mine PT Freeport IndonesiaBy M E. Rakidjan
The DOZ underground mine at PT Freeport Indonesia is a copper and gold mine in Indonesia with current ore production of 42 000 tpd. Because of the mine expansion into the West DOZ more ventilation rai
Jan 1, 2005
-
Contributed Discussion to "Optimization Techniques for the Open Pit Limit Problem" by L. Caccetta and L. M. Giannini (Bulletin and Proceedings, Vol. 291, December, 1986).The authors have succeeded in providing additional rigour and clarity to the formulation and execution of the dynamic programming algorithm for optimum open pit limit determination. The inclusion of t
Jan 1, 1987
-
Mining and Treament of Gold Bearing Clayey Ores at Golden Ridges, new GuineaThe extraction of the values from gold bearing clay or clayey ores has always presented difficulties. A description of the successful operation of a mill working on material of this nature is here giv
Jan 1, 1951
-
The Potential for Backfill in Highwall MiningBy G L. Boyd
Backfill applied to highwall mining is foreseen as a means to increase recovery of mineable coal to levels comparable with underground longwall mining. This paper describes the progress of research to
Jan 1, 1998
-
Development of a New Dry Density Separator for Fine-Grained MaterialsDevelopment of a New Dry Density Separator for Fine-Grained Materials
Sep 13, 2010
-
Bauxite in the Darling Range, Western AustraliaAlthough the 'exi'stence of bauxite in Australia has been known for many years it is only recently that exploitation has commenced.. of the two most' important` deposits, strangely a
Jan 1, 1964
-
Converter Slag Flotation Practice at Mount Isa Mines LimitedBy Watsford RMS, Schache IS, Slaughter PJ
As part of the overall Copper Smelter expansion activities at Mount Isa Mines from 1970 - 1975, a decision was made to open circuit the converter slag from the Smelter and treat this product by flo
Jan 1, 1978
-
Beyond Airleg Mining - Narrow Vein Mining in the 21st CenturyHigher commodity prices and environmental considerations will make selective narrow-vein mining more attractive in future. Unfortunately, hand-held airleg (jackleg) mining is a mature technology that
Jan 1, 2008
-
Design, Construction and Commissioning of A 4 Tonne/Hour Matte Fuming Pilot PlantBy Lightfoot BW, Foo KA, Conochie DS
Aberfoyle Limited operated a matte fuming pilot plant, incorporating a SIROSMELT furnace in 1980/81. This plant was a significant advance in both smelting and tin extraction technology. Important
Jan 1, 1984
-
Some Characteristics of the Strong Outbursts of Coal and Gas in Coal Mines in ChinaChina has at least 200 collieries suffering from the problem of instantaneous outbursts of coal and gas. Strong outbursts often have occurred in geological tectonic zones and concentrated stress a
Jan 1, 1986
-
Grade Control Techniques at Paddington Gold MineBy Amos QG
The Paddington I and proposed Paddington II Pits are both located in what is, by Eastern Goldfields standards, a large tonnage-low grade orebody. The Pits have been designed to supply ore to a substan
Jan 1, 1986
-
Metallurgical Operation at GunpowderGunpowder Copper Limited processes 1,000 tonne/day of Mammoth ore in a conventional flot- ation concentrator. Run of mine ore is prepared for flotation by three stages of crushing and two stages of
Jan 1, 1974