Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Permanent Creek Diversion Through Spoil ù Back Creek, Queensland

    By P Bethune

    Back Creek is a tributary of the Condamine River. It flows in a northerly direction across the existing Commodore coal reserves. The diversion of Back Creek was proposed to minimise sterilisation of t

    Jan 1, 2003

  • AUSIMM
    Pilot Studies of the Ravensthorpe Nickel ProjectÆs Pressure Acid Leach Slurry Heater

    By M Miller

    Operators of nickel laterite pressure acid leach and gold pressure oxidation technology frequently employ a series of steam condensing heaters to preheat the leach feed slurry. The heaters are an econ

    Jan 1, 2005

  • AUSIMM
    Nabarlek Uranium Mine Design, Construction, Operation Monitoring and Decommissioning of the Water Management System

    By Weatherhead J, Grounds J

    The Nabarlek Uranium Project located in Arnhem Land in the Northern Territory of Australia was a small high-grade deposit which was the first uranium mine brought into operation following the extens

    Jan 1, 1988

  • AUSIMM
    Laboratory Studies in Comminution - Part II Rod Versus Ball Milling of a Tin Ore

    By Quast K. B

    Laboratory batch rod and ball milling tests were conducted on samples of Heavy Medium Separator (HMS) sinks from Renison Tin Limited. The product size distributions for this heterogeneous material wer

    Jan 1, 1995

  • AUSIMM
    The Design and Commissioning of the Argyle Diamong Mines Heavy Medium Separation Plant

    The Argyle Diamond Mine came on stream late in 1985 as the world's largest diamond producer in terms of carat output. The design of the process plant, including the heavy medium separation (HM

    Jan 1, 1987

  • AUSIMM
    Inclined Blastholes for Pit Wall Control Using Tamrock 4000 Drill

    A typical large surface mine in Scandinavia has hard rock, a cold cli- mate, poor ore, a complicated vein type orebody and high labour costs. In order to survive, these mines have to maximise their o

    Jan 1, 1989

  • AUSIMM
    Recent Advances in Base Metal Extraction

    By Batterham R. J

    Some developments in copper, lead and zinc extractive metallurgy which have gone in to production or seem to be close to production scale are described with emphasis on why these innovations have been

    Jan 1, 1992

  • AUSIMM
    Cyclone Smelting for Residues from Zinc Metal Production

    By Melcher G

    The challenge to the zinc industry is shifting from maximum metal recoveries to the environmentally safe processing of the ore concentrates. The main source of solid residues from hydrometallurgical

    Jan 1, 1993

  • AUSIMM
    A Model Study of the BHP New Zealand Steel Iron-Making Melter

    By Gregory O, Winters BI, Garlick C, Rogers H, Ye ZC

    BHP New Zealand Steel produces iron from titaniferous ironsand by a direct reduction process comprising multi- hearth furnaces/rotary kilns/electric iron melters. The electric iron melter is a six-in-

    Jan 1, 1995

  • AUSIMM
    Pisces-a Symbol for the Future

    By King MN, Travis IC

    PISCES - the Planning and Information System for Coal Export Services has been developed by Port Waratah Coal Services (PWCS) to ensure the efficient and economic operation of the Hunter Valley Co

    Jan 1, 1987

  • AUSIMM
    Optimisation of Mines and Smelters by the Application of Improves Computing Systems

    By Quayle J. E

    This paper covers period from 1973 through to 1988 and the mines of West Coast Mines, Elur Mine, North Mine and Risdon Zinc Smelter, now all part of the Pasminco Group. During this period, optimisat

    Jan 1, 1991

  • AUSIMM
    Selected Aspects of Formation of Dangerous Methane Accumulations

    By Rosmus P

    Improper use of auxiliary ven- tilation units during heading operations may often result in the appearance of hazardous methane accumulations. This is the case especially when roadways are ventilat

    Jan 1, 1988

  • AUSIMM
    The Monitoring of Medium Rheology in Dense Medium Cyclone Plants

    By Reeves T. J, Hansen J. Y

    Dense medium cyclone theory, supported by extensive experimental and plant-scale evidence, demonstrates that medium rheology (stability and viscosity) substantially affects cyclone performance in mine

    Jan 1, 1989

  • AUSIMM
    Mining from Deeper Levels at Mount Lyell the 50/60 Series Mining Plan

    By McMullen P. H

    Mining of copper ore at Mount Lyell has been continuous since 1893. The operation has always been marginal and the depressed copper Market over the last decade has seen mining continue on the basi

    Jan 1, 1988

  • AUSIMM
    Life of Mine Land Use Plan - Comalco Weipa

    This paper outlines the aims, objectives and means by which a life of mine land use plan was established for Comalco's bauxite mine at Weipa. Comalco realises the need to strategically plan for f

    Jan 1, 1992

  • AUSIMM
    Mathematical Modelling of the Convergence and Vertical Stress Patterns Around a Longwall Panel in New South Wales

    By Pattinaja MA

    Mathematical modelling was carried out to determine the probable convergence and vertical stress patterns around a retreating longwall panel in an underground coal mine in New South Wales. An &apo

    Jan 1, 1986

  • AUSIMM
    Health Monitoring of Underground Mining Machines

    By Steinbrucker G

    Improvements in mining by the application of electronics necessitates analy-sis of the objectives and problems. A detailed analysis has shown that increased tunel-ling performance is one of the most i

    Jan 1, 1985

  • AUSIMM
    The Economic Life of a Rock Drill (e7c90118-9ca4-4519-bb2c-97419e088a80)

    With the use of 36 rock drills of the jackhammer type at the West Lyell Open Cuts of the Mt Lyell Mining & Railway Co, it is of importance to determine the economic as well as the physical life of

    Jan 1, 1994

  • AUSIMM
    Prevention of Coal and Gas Outbursts in Taiwan Coal Mines

    By Liu C. H, Juang Y. F

    Coal/gas outbursts were one of the rather difficult safety problems faced in the coal mines of this Country, with coal fields characterized by frequent disturbances of folds, faults and pinch-offs.

    Jan 1, 1988

  • AUSIMM
    Shallow Compressed Air Tunnelling on the Murl Project

    By Bennet A. G

    As part of the construction of the Melbourne Underground Rail Loop it was necessary to construct two 7 metre diameter tunnels, each 100 metres in length, by shield driven excavation through an all

    Jan 1, 1981