Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Prediction of Rock Cutting Performance using Fracture Mechanics Principles - A review

    By Waller M. D, Whittaker B. N, Singh R. N

    This paper overviews the recent research progress in predicting cutting performance using fracture mechanics principles. It is emphasised that rock fragmentation due to cutting is mainly a process

    Jan 1, 1992

  • AUSIMM
    Microbiological Biodegradation of Manganese Oxides

    By Madgwick J, Pracejus B

    The microbial, microaerobic, biodegradation of cryptomelane-rich and pyrolusite-rich samples of manganese oxides was studied in repeated five-day static batch cultures over II weeks. Manganous ion was

    Jan 1, 1992

  • AUSIMM
    The Role And Behaviour Of Fill in Mining

    This paper reviews the role of fill in mining including consolidated fill both histor- ically and currently as determined by a recent survey of the Fill Subcommittee of the Canadian Advisory Commit

    Jan 1, 1973

  • AUSIMM
    Strata Support Interaction on a Powered Support Longwall Face Under a Massive Dolerite Sill - A Study

    By Ghose AK

    Design and selection of support systems for longwall faces call for in-depth know- ledge of strata mechanics and in particular of strata-support interactions. The paper presents the results of fiel

    Jan 1, 1992

  • AUSIMM
    Biorecovery of Selenium from Smelter Effluents

    By Salley J, Gould WD

    The stack-gas scubber effluent from base metal smelters often contain 20-100 ppm of oxidized selenium salts. Due to their toxicity, these must be removed from solution prior to release of the effluent

    Jan 1, 1990

  • AUSIMM
    A Laboratory Facility For Testing Cemented Fills

    This case study describes various aspects of establishing a laboratory facility for testing chemically-cemented fill materials. The applicability of data obtained from such a facility related to m

    Jan 1, 1973

  • AUSIMM
    A Proposed Standard for the Objective Measurement of Muck Pile Profiles

    Blast Engineers frequently use the terminology "the blast showed good heave", or even "the heave was better this time". It is reasonably obvious that "good" and "better" are not the best terms to us

    Jan 1, 1990

  • AUSIMM
    The Use of High Shock Energy Explosives to Control Overbreak in Development Rounds

    It is not often that mines have as much warning of the approach of bad ground conditions as was the case at the Western Mining Corporation, Kambalda Nickel Operations Lafranchi/Schmitz Decline. Most a

    Jan 1, 1992

  • AUSIMM
    High-Speed Motion Picture Photography Analysis in 3D - A New Approach to Analyzing Full Scale Blasts

    By Vanderberg B

    A 3D, PC based computer program is currently under development by Blasting Analysis International, Inc., to analyze the kinetics of full scale blasts with two or more high-speed motion picture camer

    Jan 1, 1990

  • AUSIMM
    The Stratigraphic and Metamorphic Sequence of Mount Isa, and Associated Igneous Intrusions

    The stratigraphic sequence west of Mount Isa contains the Judenan Beds, Eastern Creek Volcanics, and May Downs gneiss. It is an incomplete sequence as major north-south faults divide the area into fou

    Jan 1, 1972

  • AUSIMM
    The Determination of Silver in Lead Sulphide Concentrate by Atomic Absorption Spectroscopy (5be5cf21-9cd4-4cff-b4fd-1553b31a5e99)

    By Greaves M. C, Amos M. D

    A study was made of the instrumentation and technique of atomic absorption spectroscopy developed by Walsh of the Commonwealth Scientific and Industrial Research Organisation (CSIRO), Australia.The me

    Jan 1, 1994

  • AUSIMM
    Tailings and Water Management in Wet Climates from Initial Planning to Final Abandonment

    By Brett D

    Tailings disposal and water management are one of the most important environmental issues in mining projects. The nature and the method of disposal of the tailings will determine the long term envir

    Jan 1, 1991

  • AUSIMM
    A Second Derwent Crossing for Hobart

    Proposals for engineering works in the River Dement in recent years have been made in the context of very little geological informat- ion. Breakage of the Tasman Bridge, forced a complete re-apprai

    Jan 1, 1977

  • AUSIMM
    The Design, Installation and Commissioning of the Northparkes MinesÆ Lift 2 Ground Handling System

    By I Ross

    The ground handling system needed for the second lift of the underground block caving operation at Northparkes Mines had to link into the existing infrastructure. Production requirements indicated tha

    Jan 1, 2005

  • AUSIMM
    Underground Downhole Geophysics at CSA Mine, Cobar

    By Erickson M. E, Smith C. K, Carswell J. T

    Thirteen holes totalling 3200m were surveyed using a downhole time domain Geonics EM37 system at the 830 metre level within the CSA Mine, Cobar, New South Wales, in order to search for blind, electric

    Jan 1, 1990

  • AUSIMM
    Investigations into the Predictability of Volumes and Characteristics of Mine Waters in Coal Seams of the Sydney Basin

    By Anderson JDC

    Opencast Lignite Mining requires topwall strata of seams to be fully depleted and footwall aquifers sufficiently depressurized. To prevent a spread of the cone of depression into protected wetlands

    Jan 1, 1988

  • AUSIMM
    Restructuing for Survival at the Renison Mine

    By Thomas W

    Due to record low tin prices and an uncompetitive position in world markets, the Renison tin mine has undergone three major phases of restructuring in the last three years. This has involved substanti

    Jan 1, 1992

  • AUSIMM
    The Use of an Agitated Bed of Particles as an Electrode System for Metal Deposition

    A number of suggestions have been made to improve the design of cells used for electro winning and electro refining of metals. Most of these designs have been aimed at increasing the current densit

    Jan 1, 1969

  • AUSIMM
    Optimising the Drilling Budget with Geophysical Logging

    By Fullagar P. K

    In resource definition and mine development, major capital expenditures are committed on the basis of sparse information and even in production surprises such as bad ground are not uncommon. Drill h

    Jan 1, 1997

  • AUSIMM
    Optimisation of Cut-off Grades During Design of Underground Mines

    The theory of declining optimimum cut-off grades is more than 25 years old, but for a number of reasons it is still not widely used in industry. A lack of faith in the veracity of estimated grades i

    Jan 1, 1991