Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimising a Mineral Supply Chain under Uncertainty with Long-term Sales Contracts

    By J Zhang, R Dimitrakopoulos

    A two-stage stochastic mixed integer non-linear program is formulated for a mining complex to optimise strategic and tactical plans. The objective is to find the near optimal decisions for a mineral s

    Nov 24, 2014

  • AUSIMM
    Practical and Strategic Technology Choices for Advanced Mining

    By I Gipps

    The mining industry has come through a period of major change in community expectations regarding safety and environmental impact and these changes can be expected to continue in the future. These cha

    Jan 1, 2003

  • AUSIMM
    Non-Conventional Use of VoD Measurement Technology for the Quantification of Delay Performance

    By P Aguilera, C Guerrero, M Tucker

    With the advent of Electronic Detonator Systems in the global mining industry, as well as the development of high precision pyrotechnic delays, the measurement and analysis of delay performance (usual

    Jan 1, 2004

  • AUSIMM
    Buckling of Sheave Wheels

    Sheaves are a critical safety component in a winding system and are expected to survive such extreme loading events as rope break. Sheave designs have often been developed and evolved empirically, con

    Jan 1, 2005

  • AUSIMM
    Optical and SEM-Based Microscopy Integration for Optimisation of Geometallurgical Modelling and Ore Deposit Characterisation

    By R Hartner

    Digital optical microscopy (DOM) and automated SEM-based (ASEM) mineralogy systems (MLA, QEMSCAN) have experienced significant developments within the last decade. However these developments have been

    Sep 5, 2011

  • AUSIMM
    The Palaeoproterozoic Warramunga Formation, Tennant Creek Block, Central Australia: Sedimentology, Geochemistry and Provenance

    By N Donnellan

    The Palaeoproterozoic Warramunga Formation is notable as the host to the enigmatic, so-called 'Tennant Creek style' mineralisation. These polymetallic (but mainly Au-Cu-Bi) ore deposits t

    Jan 1, 1994

  • AUSIMM
    Winning the Safety Battle

    By S Hanrahan, S McLaughlin

    A case study is presented that details the safety journey at a North American project involving two major contracts: a 1000 m shaft recovery and rehabilitation, and the development of a drainage galle

    Jun 22, 2016

  • AUSIMM
    Design and Construction of Tunnels for Northern Gateway Project, New Zealand

    By M Behrens, A McPhee, B D. Hegan

    This paper describes the design and construction of twin 400 m long road tunnels as part of the Northern Motorway Extension Project in Auckland, New Zealand. Construction of the tunnel civil works is

    Jan 1, 2008

  • AUSIMM
    Water Supply at the Warrego Mine, Tennant Creek, Northern Territory (533fe125-f87f-451f-a8a7-f8cc9efcc262)

    By Ride G

    The provision of a water supply is a major consideration in planning mining developments particularly in remote areas. The evaluation and development of adequate water supplies in and areas of Aust

    Jan 1, 1980

  • AUSIMM
    A Black Canvas – Planning a Greenfield Coalmine in New South Wales

    By T W. C Stambolie

    Coalmines, like any other mine, generally involve the classic three-staged approach to mining studies; namely concept, pre-feasibility study (PFS) and feasibility studies (Cusworth, 2012). Subsequent

    Jun 28, 2016

  • AUSIMM
    Murrin Murrin Heap Leaching Project

    By N Meadows, M Rodriguez

    A 200 000 tpa heap leach demonstration plant was approved by the Murrin Murrin Joint Venture (MMJV) in December 2005 and engineering commenced in January 2006. The demonstration plant will utilise sto

    Jan 1, 2006

  • AUSIMM
    Mine Ventilation Model Validation - ItÆs not Rocket Science!

    By J Rowland

    "Ventilation models are invaluable tools for both prediction of routine daily ventilation changesin an operating mine to circuit performance expectations at the mine in 20 yearsÆ time. Arguably ventil

    Jun 1, 2012

  • AUSIMM
    Improving Production Drilling and Blasting in the Kim South Orebody at Agnew Gold Mine

    By T A. Carter

    In 2010 Agnew Gold Mine (AGM) struggled to produce the required tonnages from its stopes. The longhole rises used to create void in stopes were unreliable and often failed to gain the designed rise he

    Mar 24, 2014

  • AUSIMM
    Fundamental sintering characteristics of fine-grained hematite precipitate in a simulated sinter blend

    By G Reynolds, N A. Ware, L Lu

    Queensland Pacific Metals (QPM) is progressing its Townsville Energy Chemicals Hub (TECH) project to produce nickel and cobalt sulfates for advanced battery materials. Apart from the nickel and cobalt

    Sep 18, 2023

  • AUSIMM
    A Case for Revision of Time-Honoured Mine Ventilation Design Parameters through Active Field Observations

    By B Belle

    "Mines around the world are inherently and operationally diverse. Current methodologies for the design of mine ventilation and cooling infrastructure involve controlling major safety and health hazard

    Jun 1, 2012

  • AUSIMM
    Metallurgical Management Tools for Continuous Improvement

    By R Dunne, W McCallum

    Continuous improvement might be defined as seeking incremental improvement over time through improved equipment, processes, technology and the efforts of people. Most people working in ore processing

    Oct 29, 2012

  • AUSIMM
    SBRE – a simple, flexible and scalable framework to perform conditional simulations for uncertainty quantification

    By J Ashford, Minniakhmetov

    Geostatistical simulations are the best practice for uncertainty quantification in non-linear systems. Simulations are currently undertaken on an ad hoc basis in the mining industry due to high requir

    Mar 22, 2022

  • AUSIMM
    Mineralogical Quantification of Iron Ore Sinter

    By S Hapugoda, J Manuel, E Donskoi, L Lu

    Sinter can constitute up to 80–85 per cent of the total ferrous burden in modern blast furnace ironmaking operations. The mineralogy and microstructure of iron ore sinter play an important role in det

    Jul 13, 2015

  • AUSIMM
    When Nothing is What You Need – The Importance of Using Blanks at All Stages of Sample Preparation

    By J Webb

    "It is vitally important in projects where the cut-off grade is low that there is no contamination during the sampling and sample preparation process, both in the ore and the waste zones. Failure to i

    Jul 29, 2014

  • AUSIMM
    Operational Management of Underground In-Seam Drilling Sites

    By ZáWang, F Hungerford, T Ren

    Operations in an underground drill site have to co-exist within the mineÆs ventilation and operational system. The space requirements of a drilling operation have to be adapted to the limitations prov

    Jul 1, 2013