Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
An Open Pit Multistage Mine Production Scheduling Model for Drilling, Blasting and Excavating OperationsBy S Q. Liu, E Kozan
This paper proposes a new multiresource multistage scheduling problem for optimising the open pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is
Nov 24, 2014
-
The Impact of Residence Time on Copper Recovery in Telfer Gold MineÆs Cyanide Recycling ProcessBy P Breuer, A Simons
The sulfidisation, acidification, recycle and thickening (SART) process is currently being used at NewcrestÆs Telfer Gold Mine to recover cyanide and copper from the cyanidation tails of the pyrite co
Sep 26, 2013
-
The Status of Implementation of Proximity Detection Systems in Underground MinesBy D Kent
The introduction of digital technologies into the underground mining industry, in both coal and hard rock mining, has enabled many high bandwidth applications to be adopted by mines.Digital networks b
Mar 21, 2011
-
Life-of-mine Development and Production Scheduling Optimisation for Sublevel Cave OperationsBy G Chitombo, A Perryman, A D. Campbell, J White, B Hollis
This paper describes the development and implementation of an optimisation tool developed as part of the Mass Mining Technology (MMT) Project. The tool, known as the SLC Schedule Optimiser, is capable
May 9, 2016
-
The Network Centric MineBy G Malherbe, J Gonzalez, D C. Franklin, J Bassan, C T. Farrelly
To respond to ever-increasing challenges, mining companies have been experimenting with new business models and technologies in order to speed mine development, production, processing and transport. T
Nov 20, 2012
-
Exploration History of the Mbalam Iron Ore ProjectBy S E. Thornett, P L. Kitto, R S. Longley
"The Mbalam Iron Ore Project covers mineralisation in two areas of metamorphosed hematitic banded iron formation (itabirite) in the north-west Congo Craton; namely at Mbarga in south-east Cameroon and
Aug 12, 2013
-
Development of an Aquatic Habitat and Water Resource in Closing Out the Enterprise PitBy Fawcett M
Pine Creek Goldfields Limited (PCG) is rehabilitating the Enterprise Pit to an aquatic habitat and potential water resource. This paper discusses the development and implementation of that plan. Pin
Jan 1, 1994
-
Getting underground: design and construction of a portal in a pit with moving wallsBy J Player, P Evans, G Sweby
Achieving quick underground access after the completion of an open pit mine can be critical to maintaining project value and ensuring regular ore feed to the mill. This paper outlines the design and c
Mar 15, 2021
-
Quantification of surface sensor representivity of primary crushed ore for bulk ore sortingBy J Rutter, D Francois-Bongarcon, M Federov, N Odiar, M Scott
There are two fundamental methods for metalliferous sensing of primary crushed ore available for deployment at operations. These methods can be classed as surface measurement techniques (including XRF
Nov 10, 2020
-
Geometallurgy of the South Middleback Ranges Magnetite Deposit – Predicting Plant Performance from the PitBy D Gerrard, J Begelhole, J Gerber
The Iron Magnet deposit has been mined since 2007 when Arrium (then OneSteel) commissioned the magnetite concentrator to supply feed to the pelletising plant in Whyalla. The concentrate quality requir
Jul 13, 2015
-
Modification of Some Failure Criteria for Rock and CoalBy V S. Vutukuri, K Shariar
This paper present a modification of selected strength criteria for coal and rocks containing weakness planes. The three strength criteria, namely, Murrell (1965), Bieniawski (1974a, 1983) and Hoek a
Jan 1, 1999
-
Applied Remote Sensing Research For Mineral ExplorationThe Division of Minerals and Geochemistry in collaboration with three mineral exploration companies, Mawson Pacific Ltd, Ramsgate Resources Ltd and Tectonic Systems Pty Ltd commenced a two year re
Jan 1, 1987
-
Opening Supports to Segmental Linings – A Novel Shotcrete Support SolutionBy M Burdick, A Harding, M Krulc, M Chappell
Substantial schedule advantages can be made on projects if cross-passage construction can occur at the same time as tunnel boring machine (TBM) operation with little or no impact on TBM logistics. How
Sep 17, 2014
-
Some Notes on the Equipment of the Electrolytic Zinc Company of Australasia Limited, at Rosebery, TasmaniaThe purpose of this paper is to list by tabulation and flow sheet, the operating equipment and installations in use at Rosebery, and to refer to particular items which may be of interest for purposes
Jan 1, 1949
-
Bulk Mining Explosives ù Technical Tool or Commercial Commodity?By G Le Juge, K Waldock
The current suite of bulk mining explosives has been available to the industry for over 20 years. The flexibility and performance of ammonium nitrate based emulsion blend explosives were accepted by t
Jan 1, 2004
-
Misima Gold Mine – A Case Study in the Use of Historical Data for an Updated Mineral Resource EstimateBy C Switzer, R Logan, S Konopa, P Stoker, R Lewis
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Misima gold mine, located on Misima Island within the Milne Bay Province of Papua New G
Mar 18, 2015
-
30 years of seismic system design, implementation and interpretationBy J Player, G Sweby, S Webber, E Jones
Seismic systems are a tool for the monitoring and forecasting the rock mass response to excavation. Common issues encountered at mine site audits and reviews are: how to design an effective seismic sy
Nov 29, 2022
-
Bauxite Deposits of the Kimberley, Western AustraliaBy Zani J. A, Jackson W. D
Bauxite was discovered in the Kimberley in 1965 by an Amax field crew. Reserves of 230 million tons, of bauxite. averaging 47% total alumina on Mitchell Plateau and 980 million tons averaging 36%
Jan 1, 1973
-
Back analysis of pit slope performance in a saturated alluvial sedimentBy J Player, G Sweby
The material properties and hence performance of saturated alluvial sediments slope can be incorrectly forecast if the water content is not preserved, and materials properties not correctly determined
Jun 22, 2022
-
Energy Efficiency Opportunities in Milling – Improving Comminution Circuit EfficiencyBy F Musa
One of the main energy efficiency opportunities identified from the majority of mine site energy audits is to optimize the comminution circuit to reduce energy consumption through improved throughput
Aug 8, 2011