Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Analysis of premature failure of rock bolts and cable bolts failed in underground coal minesBy P Craig, A Crosky, H Ramandi, S Saydam, H Chen
Frequency of reports on premature failure of rock bolts and cable bolts have increased in past two decades. Such a failure threatens both the safety of underground mine workers and the economic viabil
Nov 30, 2018
-
Hoist Ropes for Double-Drum Winders ù A New ConceptBy R Verreet
In April 2000 Mount Isa Mines installed hoist ropes of a new design on the double-drum winder at their P49 shaft. The ropes, CASAR Duroplast, were about three times as expensive as the previously used
Jan 1, 2005
-
Screen Media Aperture Size Measurement Using MetsoÆs Screen TrackerBy G van Niekerk, M Wortley
Screening is a critical part of many mineral processing circuits and keeping the aperture of the screening media within specification is vital to ensure efficient performance of the processing plant.
Sep 26, 2011
-
Practical Sampling for Online Analysis and Composite Samples of Slurries - The Art of CompromisesIn practice a sampling solution is a compromise of many requirements: the sample should be representative; the sampling system should also be reliable, less than 95 per cent availability rest
Mar 1, 2010
-
The Impact of Pile Loading on Adjacent Metro Tunnels – Barangaroo South, AustraliaBy P K. Wong, D A. F Oliveira, F M. Azad
In situations where foundation piles are located in proximity to existing or future tunnels, it is typical for the tunnel owner to require that sleeving of the piles be carried out to at least the inv
Sep 17, 2014
-
Legacy tailings dam closure with a bituminous geomembrane coverBy M Medina, J Alexander, R J. Longey
Capricorn Copper Pty Ltd (CCPL) are operating the Capricorn Copper Mine located at Gunpowder, Queensland. As current holder of the environmental authority for the site, CCPL have obligations to rehabi
Jul 1, 2021
-
Water Production Simulation Tool for Coal Seam Gas Operations in Bowen and Surat BasinsBy R Strand, L Reading, G Keir
A major challenge in managing coal seam gas (CSG) water is predicting how much water will be produced as the industry develops. Klohn Crippen Berger Ltd (KCB) was commissioned by the Queensland Depart
Nov 26, 2013
-
A Case Study In Ore Reserve Procedures At Mount LyellBy Rowe J
The case study is based on the largest ore deposit at Mt. Lyell; the Prince Lyell deposit, comprising a regular lensoid mass of dissemina- ted and vein pyrite-chalcopyrite mineralisation. Reserve est
Jan 1, 1979
-
Differential Flotation of Copper, Lead, Zinc and Iron Sulphide Minerals at Lake George Mines Pty. Ltd., Captain's Flat, New South WalesBy Nixon J. C, Reynolds C
Three principal features of the ore at Captain's Flat, New South Wales, tend to complicate concentration of the valuable minerals, these being:1. The ore occurs in three more or less separate bod
Jan 1, 1952
-
Utilising Electronic Detonators at Hail Creek Mine for ‘Dynamic Buffering’By A Baker
Hail Creek Mine is an open cut coal operation owned by Rio Tinto. It is located 120 km south west of Mackay in the Bowen Basin region of central Queensland. Opened in late 2003, the mine produces two
Nov 8, 2011
-
Comparison of Min/Max Autocorrelation Factors, Kriging, Co-kriging and Inverse Distance Block Totals – A Magnetite Hematite Case StudyBy D Kentwell
For deposits where a full assay suite of elements/oxides is available and where several variables are critical to the evaluation of the deposit, it is desirable for the estimated block values of all e
Jul 13, 2015
-
Effect of the Recycling Load on the High Pressure Grinding Rolls' Performance - A Case Study with the Industrial Unit During Cement Clinker GrindingBy H Benzer, N A. Aydogan
It is well known that the high pressure grinding rolls (HPGR) can only be operated efficiently under choke feeding conditions in which a material bed is built up between the rollers to ensure interpar
Jan 1, 2009
-
Rock Bolts for Permanent Tunnel LiningBy J de Witte
When used in suitable ground conditions, rock bolts can have advantages over other permanent tunnel lining solutions. Permanent rock bolts offer flexibility in tunnelling profile and rapid rock bolt i
Mar 8, 2011
-
Selection of an Optimum Truck and Shovel Fleet Based on Effective Flat Haul and Capacity Constraint ModellingBy P Hagan, S Campbell
A study was undertaken using various methodologies to determine the optimum loading and hauling configuration for different haul routes at Callide Mine, a coal mine located in central Queensland. The
Sep 18, 2012
-
Application of SLon Magnetic Separators in Modernising the An Shan Oxidised Iron Ore Processing IndustryThe An Shan iron ore deposit is the biggest low-grade oxidised iron deposit in China. Over the past ten years, about 120 SLon verticalring-pulsating high gradient magnetic separators units have been i
Jan 1, 2009
-
Carbon Prefloat Improvements at Century MineBy D G. Rantucci
Organic carbon is a major ore contaminant at MMG’s Century mine. This carbonaceous matter is associated with shale hosted sphalerite mineralisation. It occurs as elongated lamellae and as inclusions
Aug 8, 2011
-
Redevelopment of the Morning Star Gold Mine - ABSTRACT ONLYMorning Star Gold aims to enter the ranks of Australia's gold producers, revitalising the Eastern Victorian Goldfi elds in the second half of 2010 - the fi rst gold production in around 50 years
Aug 1, 2010
-
Optimised Process Control in Iron Ore via Online Analysis of Light ElementsBy L Köresaar, J Moilanen
With lower and increasingly variable Fe grades in iron ore resources, the monitoring of Si, Al, Mg and other light elements to meet quality requirements is gaining importance in the iron ore beneficia
Jul 13, 2015
-
A Comparative Study of Manual Wagon Top Sampling and Auto Mechanical Sampling of 200 mm Size Coal with Respect to Stopped Belt Sampling of Thermal Coal at Indian Super Thermal PowerplantsBy K M. P Singh, K M. K Sinha, G S. Jha, T Gouricharan, K K. Sharma
The majority of the powerplants in India are fed with non-coking coals, with the coals dispatched from their respective mines via wagons loaded by a rapid loading system or pay loader. The usual top s
Jul 29, 2014
-
Competing Factors in Support Selection for the West Zone of the Beaconsfield Gold Mine, TasmaniaBy P Fuller, A R. Penney
Re-commencement of mining in the Western Zone of Beaconsfield Gold Mine following a seismically-induced rockfall fatality in April 2006 required a change of mining method involving drilling and blasti
Jan 1, 2008