Search Documents

  • CIM
    Global warming - reality or conjecture?

    By John Stubbles

    Data are presented on the global warming issue to reinforce the decision by the U.S to reject the Kyoto protocol. The evidence that CO2 is a problem rather than a benefit is inconclusive and will be d

    Jan 1, 2004

  • SME
    Connections to Old Tunnels - Design Guidelines

    By Jozef F. Zurawski

    Increasingly new interceptors or new Combined Sewer Overflow (CSO) projects require connections to existing tunnels. More often than not, the existing facilities are old, in poor or questionable condi

    Jan 1, 2008

  • SME
    Levels of Geotechnical Input for Design-Build Contracts

    By Joseph P. Gildner, Michael S. Kucker, Robert A. Robinson

    Considerable controversy seems to exist over the extent and nature of information that should be provided in design-build type contracts. Much of this controversy may relate to the types of owners, ra

    Jan 1, 2001

  • ISEE
    Large Hole Rotary Drill Performance

    By J Lyall Workman, Peter N. Calder

    "Large hole rotary drilling is one of the most common methods of producing blastholes in open pitmining. Large hole drilling generally refers to diameters from 9 to 17 inch (229 to 432 mm), however ac

    Jan 1, 1996

  • TMS
    Depth through Breadth: Addressing the Grand Challenges of Teaching Sustainability

    By Svetlana Nikitina

    While many question "sustainability" as an intellectual field on the grounds that it is too broad and "undisciplined," we are able to achieve a good balance between breadth of coverage and depth of in

    Jan 1, 2010

  • AUSIMM
    A batch elutriation technique for the density-based fractionation of iron ore

    By D M. Hunter, S M. Iveson, K P. Galvin

    For low density materials such as coal, density-based fractionation of particles via the sink-float method is relatively simple due to the availability of liquids of suitable density; however, for hig

    Jul 24, 2017

  • AUSIMM
    Optimisation Challenges in Underground Mine Planning and Design

    Underground mine planning is characterised by a series of designs, starting with prefeasibility and culminating in operational. Information on the mineralisation and geotechnical conditions is availab

    Dec 6, 2010

  • NIOSH
    Computer Simulation Of Particulate Systems

    By Lindsay D. Norman

    Computer models for simulating the construction and for calculating the properties of particulate solids in two- and three-dimensional systems (coverings of circles and packings of spheres, respective

    Jan 1, 1971

  • SAIMM
  • NIOSH
    OFR-11-72 A Current Appraisal Of Underground Coal Gasification - I. Summary - A. Purpose And Scope

    The Bureau of Mines in the Department of the Interior is increasingly concerned with the safety and health of personnel engaged in coal-mining operations, particularly below ground. The Bureau is also

    Jan 1, 1971

  • NIOSH
    OFR-88-81 Evaluation Of Intrinsically Safe Instruments And Apparatus For Use In Underground Coal Mines

    By J. M. Kurtz

    Ten Methane Monitoring Systems and Machine Control Circuits were examined and tested per the requirements in CFR Title 30, Parts 18 and 27, the Standard UL 913 and the document "Test Requirements For

    Jan 1, 1980

  • SME
    Geology of the Clean Water Coalition?s Proposed Reach 4 Tunnel and its Effect on Design, Las Vegas, NV

    By Ray Brainard

    Treated effluent from the Clean Water Coalition (CWC) member agencies is currently discharged at an annual average rate of 6,570 l/s into the Las Vegas Wash, and is increasing annually. As the effluen

    Jan 1, 2008

  • NIOSH
    RI 3562 Studies Of Roof Movement In Coal Mines - 4. Study Of Subsidence Of A Highway Caused By Mining Coal Beneath ? Introduction

    By E. R. Maize

    [?he scconG rcport of :his st?rI.org 8cdt with o3servatioi:s of conver- gence of roof an4 floor at t!x*re: ?.cc.-.tioris iri til~ ClVucible mine of kke Cru- cib1.o Fuel Co. Data on sl:'ociacnce ?

    Jan 1, 1941

  • SME
    Got Wet Or Dry? Get Mist Drilling.

    By Dan Armour

    Bolting solutions traditionally offered only wet drilling or dry drilling options; each with advantages and disadvantages. Joy Mining Machinery has developed a Mist Drilling System that incorporates t

    Jan 1, 2005

  • CIM
    Model Predictive Control of the Flotation Process

    By Donald Leroux, Martin Suichies, Andy Trusiak, Chris Dechert

    "In modem concentrators, the operation of flotation machines is often stabilized by simple control loops. Froth level, slurry density and aeration rate are all physical parameters typically controlled

    Jan 1, 1999

  • SAIMM
    Design and manufacturing of a teleoperated excavator platform APCOM 2021

    By M. Salimov, J. Sattarvand

    The conventional visualisation method of remote equipment is through the installation of one or more cameras on the machine, and sending a live feed to the operator’s flat display. However, the perfor

    Sep 1, 2021

  • SME
    Industrial Minerals 1995

    The United States continued to depend on imported bauxite during 1995. Domestic bauxite mine production remained at about the same level as in 1994. It amounted to less than 1% of total world produc

    Jan 1, 1996

  • NIOSH
    RI 5376 Analyses Of Crude Oils From 470 Important Oilfields In The United States ? Summary

    By C. M. McKinney

    This report contains Bureau of Mines routine analyses of 492 samples of crude petroleum from 470 United States oilfields, each of which produced 2,500 barrels a day or more during at least 1 of the ye

    Jan 1, 1957

  • SME
    Evaluations Of Bit Sleeve And Twisted-Body Bit Designs For Controlling Roof Bolter Dust

    By T. W. Beck

    Drilling into coal mine roof strata to install roof bolts has the potential to release substantial quantities of respirable dust. Due to the proximity of drill holes to the breathing zone of roof bolt

    Feb 27, 2013

  • ISEE
    Modelling Non-Ideal Explosives with Detonation Shock Dynamics (DSD) Theory

    By Lars Arne Granlund

    Due to the coarse structure of mining explosives, one has to model a finite reaction zone,contrary to C-J calculations, describing their detonations, i.e they become dependent of diameter and confinem

    Jan 1, 1995