  • CIM
    Mine Site Hydrogen Storage and Delivery Model

    By M. C. Bétournay

    Mine site infrastructure for storage and delivery of hydrogen must be standardized and acceptable for routine and safe industrial use before fuel cell technology is adopted as a major power source. A

    May 1, 2007

  • SAIMM
    Evaluation of floor heaving in galleries by numerical analysis

    By M. Yavuz, M. Aksoy, G. Once, M. Iphar

    This paper is concerned with a study on the floor heaving in the transport road of the GLI Omerler Colliery in Tuncbilek-Turkey. This gallery has been opened at the depth of 200 m through the formatio

    Jan 1, 2003

  • SAIMM
    Phase equilibria in the Fe-Zn-O system at conditions relevant to zinc sintering and smelting

    By R. Hansson

    Zincite and spinel phases are present in the complex slag systems encountered in zinc/lead sintering and zinc smelting processes. These phases form extensive solid solutions and are stable over a wide

    Jan 1, 2004

  • DFI
    Overview Of Design Methods Of Axially Loaded Piles In Europe

    By Flor De Cock

    The paper reflects part of the work from the European Regional Technical Committee on Piles (ERTC3) during its mandate between 1994 and 1999, and, in particular, describes the find­ings from an Intern

    Jan 1, 2002

  • CIM
    Tunnelling in Squeezing Ground Conditions - Problems and Solutions

    By W. Schubert, N. Radoncic

    "The term “squeezing” is frequently used, although it is ill defined. Definitions like “large and long lasting displacements” raise the questions about the threshold values for the magnitude and durat

    Jan 1, 2015

  • SME
    Mycobacterium Phlei As A Flotation Collector For Hematite

    By R. W. Smith, A. M. Raichur, M. Misra

    Mycobacterium phlei has very good potential as a hematite flotation collector. The flotation recovery of hematite is dependent upon the solution pH and concentration of the microorganism. The critical

    Jan 1, 1994

  • NIOSH
    Spatial trends in rock strength – can they be determined from coreholes?

    By Deno Pappas, Chrisropher Mark, John Rusnak, Linda McWilliams

    Mine planning for a new reserve is based on information obtained from exploratory coreholes. A critical component of an exploration program is the geotechnical evaluation. Poor assumptions about roo

  • SME
    Optimal pitwall shapes to increase financial return and decrease carbon footprint of openpit mines

    By G. ALBORNOZ, S. Utili, A. AGOSTI, C. VALDERRAMA, R. PELL

    The steepness of an openpit mine’s slopes has a substantial influence on the mine’s financial return. This paper proposes a novel design methodology where overall steeper pitwalls are employed without

  • CIM
    Teck Corona Operating Corporation, David Bell Mine, Concentrator Operating Highlights

    By K. Meyer

    "INTRODUCTIONThe David Bell Mine Concentrator started production in April 1985. A staff of twenty-seven people operate and maintain the concentrator. The crew is grouped into the following main areas.

    Jan 1, 1989

  • SAIMM
    Just-In-Time Development Model For A Sub-Level Caving Underground Mine In Zimbabwe

    By C. Musingwini

    Traditionally, mineral reserves management at most underground mines in Zimbabwe focus on maintaining large mineral reserves so that the time between development and production is as long as possible.

    Jan 1, 2003

  • ISEE
    Quality-Assurance (to ISO-9001 Level) for Quarry Blasting in the Urban Environment

    By Wilfrid Comeau

    This paper deals with the concept of a Quality-Assurance Manual, to the ISO-9001 Level, for quarry blasting in the urban environment. A case history of the incident, which led to its development, is p

    Jan 1, 2003

  • CIM
    Milling Practice at Premier

    By W. J. Asselstine

    Introduction This paper is prepared from data gathered for a similar paper to be submitted to the United States Bureau of Mines, for publication as one of their information circulars. It covers the h

    Jan 1, 1933

  • NIOSH
    OFR-102-83 Computer Simulation Of Mining Subsidence Using The Zone Area Method - I. Introduction

    By M. Karmis

    Surface subsidence is an inevitable consequence of many underground mining operations and has been recognized as such since the fifteenth century. Damage resulting from this phenomenon ranges from sim

    Jan 1, 1983

  • NIOSH
    IC 9137 Eastern Coal Mine Geomechanics - Proceedings: Bureau Of Mines Technology Transfer Seminar, Pittsburgh, PA, November 19, 1986

    The Bureau of Mines is establishing design criteria for effective roof support systems and is developing technology to improve mine planning and design. Geologic studies, surface and underground mine

    Jan 1, 1987

  • AIME
    Deceased

    Elected Died 1903 * ADAMS, CHARLES C. 1905 1884 *ADDY, MATTHEW 1896 1894 *ALLFN R B 1896 1874 *AMIOT, H 1892 1886 *AMSLER, CARL 1894 1895 *ÅNGSTROM, CARL 1901 1895 *ARMSTRONG, JOHN F 1898

    Jan 1, 1910

  • SME
    Characterization of aerosols in an underground mine during a longwall move

    By Jon A. Hummer, MICHAEL R. SHAHAN, Aleksandar D. Bugarski, Shawn Vanderslice

    Occupational exposures to respirable dust and submicrometer aerosols emitted by diesel-powered equipment are a health concern for underground mining operators and regulators. A study was conducted in

  • NIOSH
    RI 3153 Factors Influencing Flow Of Natural Gas Through High-Pressure Transmission Lines

    By W. B. Berwald

    The United States Bureau of lanes, in cooperation with the Natural Gas Department of the American Gas Association, has been studying actively for the past several years the problem of the flow of natu

    Jan 1, 1931

  • NIOSH
    RI 3153 Factors Influencing Flow Of Natural Gas Through High-Pressure Transmission Lines ? Introduction

    By W. B. Berwald

    The United States Bureau of Mines, in cooperation with the Natural Gas Department of the American Gras association, has been studying actively for the past several years the problem of the flow of nat

    Jan 1, 1931

  • DFI
    Apportioning Risks On An Urban Deep Foundation Project

    By Michael P. Balducci

    Urban deep foundation projects contain unique risks that must be recognized by the parties involved. Common pitfalls must be recognized and avoided or addressed through contractual relations and corr

    Jan 1, 2008

  • ISEE
    Measuring and Analysing Percussive Pulses to Extend Depth in Top-hole Percussion Drilling

    By Gary Cavanough, Stuart Addinell, Hector Parra

    Drilling deep, straight, accurate holes in hard rock to achieve efficient blasting is a challenge for the mining/quarrying industries with short holes normally drilled using “top hole hammer” (THH) an

    Jan 1, 2013