Search Documents

  • NIOSH
    RI 3500 Progress Reports - Metallurgical Division - 38. Electrometallurgical Investigations - An Electrolytic Method For The Production Of Calcium Boride ? Introduction

    By J. Koster

    Boron is an element whose metallurgical possibilities never have been investigated thoroughly, probably because of the difficulties experienced in the preparation of elemental boron and its intermetal

    Jan 1, 1940

  • SME
    The Regulation of Subsidence and Underground Coal Mining in Illinois

    By Paul J. Ehret

    With the passage of the Surface Mining Control and Reclamation Act (SMCRA), and the implementation of state permanent programs, underground coal mining operations are for the first time subject to gov

    Jan 1, 1986

  • DFI
    Deep Soil Mixed Wall And Jet Grouting For An Excavation Support System At The Museum Of Fine Arts In Boston, Massachusetts

    By Harry Schnabel

    A 6200 m² cement deep soil mixed (CDSM) wall was constructed for an addition to the Museum of Fine Arts in Boston, Massachusetts. The addition was located along the east side of the existing museum wi

    Jan 1, 2011

  • ISEE
    Concrete Bridge Pier Removal in an Environmentally Sensitive River

    By Paul Kunze

    When a new bridge was needed across the upper reaches of the Yellowstone River in Montana, removing the old concrete bridge piers became an environmental concern for the highway department engineers.

    Jan 1, 2014

  • ISEE
    Prediction of Detonation Parameters (95f7a43f-745c-4ae7-ad4e-74c781870372)

    By P D. Katsabanis

    This chapter describes the principles for the derivation of the equations for a detonation wave. The importance of the equation of state for the detonation products is demonstrated and commonly used e

    Jan 1, 1991

  • SME
    Anticipated Behavior Of Silty Sands In Tunneling

    By Ronald E. Heuer, Debra L. Virgens

    INTRODUCTION Behavior of clay soils in response to tunneling is reasonably well understood by reference to the tunnel stability factor NT = Pz/su (Peck, 1969; Heuer, 1974). With this analysis tool,

    Jan 1, 1987

  • SME-ICGCM
    Improving the Capability for Real Time Assessment of Roof Conditions through Intelligent Roof Bolt Drilling Operations,

    By Robert Anderson

    Advance knowledge of roof conditions can lead to improvement in roof control strategies that will reduce roof falls and ultimately will reduce injuries to mine workers. J.H. Fletcher and Company, in

    Jan 1, 2007

  • AUSIMM
    Old Copper Flotation Tailings Waste Reprocessing

    Old Copper Flotation Tailings Waste Reprocessing

    Sep 13, 2010

  • NIOSH
    OFR-30-83 Phone Line Signal Propagation In Coal Mines

    By Terry S. Cory

    This report describes the results of a measurement program to determine the broad spectral characteristics of both differential and common mode noise on phone lines in three coal mines; and, signal at

    Jan 1, 1981

  • CIM
    National Strategy Overcoming HR Challenges in the Canadian Mining Industry

    Session 1 ? Intro to MiHR ? Business Case for Aboriginal Inclusion ? Overview of the Mining HR Guide for Aboriginal Communities ? Two presentations of Programs featured in the Guide ?? The RAP Pr

    May 1, 2009

  • SAIMM
    Multifractal interpolation method for spatial data with singularities

    By Q. Cheng

    This paper introduces the multi fractal interpolation method (MIM)developed for handling singularities in data analysis and for data interpolation. The MIM is a new moving average model for spatial ma

    Jan 1, 2015

  • NIOSH
    RI 8499 Characterization of Pre-1957 Avionic Scrap for Resource Recovery

    By B. W. Dunning

    This paper describes studies conducted by the Bureau of Mines to achieve its goal of developing methods for increased recovery and utilization of valuable constituents in a wide variety of domestic an

    Jan 1, 1980

  • SAIMM
    Slope Management At Navachab Gold Mine, Namibia

    By Frik Badenhorst, René Roux, Peter Terbrugge

    This paper presents a case study where economics dictated an aggressive slope angle and where an appropriate slope management programme allowed successful completion of mining to 190m below surface.

    Jan 1, 2006

  • NIOSH
    OFR-24(6)-84 Mining And Rock Mechanics Research In Oil Shale And Nahcolite, Horse Draw Shaft, Colorado - Appendix Volume A-4 Surface Testing

    During the period 1979 thru 1982, Multi Mineral Corporation conducted a mining research program at the United States Department of the Interior's Bureau of Mines Oil Shale Mining Environmental Re

    Jan 1, 1983

  • AIME
    Geology - Quantitizing Geological Parameters for the Prediction of Stable Slopes

    By W. C. Lacy

    This article is a progress report of a program designed to quantitatively evaluate geological parameters to predict stable slope angles. The author feels that, although there does not appear to be any

    Jan 1, 1963

  • NIOSH
    RI 7385 Evaluation Of Electrowon Tungsten Sheet

    By G. H. Keith

    Electrowon tungsten powders were investigated with respect to consolidation, fabrication, and mechanical properties. Sheet, 0.03 inch thick, was produced and its tensile strength measured between 250°

    Jan 1, 1970

  • SME
    Fine Copper Grinding Using Metso’s Stirred Media Detritor

    By Graham Davey

    High-speed stirred milling is a relatively new method of grinding in the metalliferous process industries. However, it has been widely used in the industrial mineral field for more than 30 years. Man

    Jan 1, 2004

  • IIMP
    Mitigación de pasivos ambientales mineros en la cuenca Alta del Río Pisco

    By José Vidalón

    Dado que las lagunas de Papacocha y la Virreyna sufren los efectos de los drenajes ácidos de minas abandonadas, relaves y desmontes depositados en sus áreas de influencia, se ha previsto el control de

    Sep 13, 2001

  • SME
    Large-Diameter Tunneling Collapses: Recovery Design and Execution

    By Bradford F. Townsend

    A study was made on six collapses that occurred during large-diameter tunnelling through weak sedimentary rocks and soil using SES methods in three stages?top heading, bench and invert. The collapsed

    Jan 1, 2008

  • AUSIMM
    Building and Calibration of a Geotechnical Model for Sublevel Open Stope Design at Olympic Dam

    By I Thin, L Morizzi, C Seymour, G Mungur

    Olympic Dam has been investigating mine design options for the South Mine Area (SMA), which will continue using the existing sublevel open stoping (SLOS) method. The SMA is an undeveloped mining area,

    May 9, 2016