Search Documents

  • NIOSH
    Detrimental Effects Of Capacitance On High-Resistance-Grounded Mine Distribution Systems

    By Thomas Novak, Jeffrey L. Kohler, Joseph Sottile, Steve J. Gnapragasam

    Modern underground coal mines can be very large, having a total connected load in excess of l5 000 hp. These mines generally have many miles of high-power conveyor belts and 15 or more miles of high-v

  • SAIMM
    Solvent extraction design consideration for the Tati Activox® plant - Synopsis

    By E. Robles

    The Tati Activox® Project (TA®P) is the first step towards the implementation of the Norilsk Nickel Activox® process. The ultrafine grinding (UFG) and autoclave pressure leach process conditions are t

    Jan 1, 2009

  • IOM3
    Long-team open-pit production scheduling through dynamic phase-bench sequencing

    By Qing Wang

    In this method the state of an open-pit mine is represented by the number of benches that are mined in each predesigned mining phase (or pushback). Consequently, a specific mining schedule can be repr

    Jul 1, 1996

  • NIOSH
    RI 9325 - Mitigating Destructive Longwall Bumps Through Conventional Gate Entry Design

    By Alan A. Campoli

    The U.S. Bureau of Mines evaluated two different conventionallongwall gate entry systems in the Southern Appalachian Basin, where mining and geologic conditions are conducive for coal pillar bumps. Th

    Jan 1, 1990

  • AUSIMM
    The Failure of Lead by Creep

    From time to time lead, which is normally considered to be a soft ductile metal, fails by cracking. The cracks which form appear to be of two distinct types-(a) those which follow a zig-zag course aro

    Jan 1, 1935

  • SME
    More Than 400,000 Expected at bauma 2004 in Munich

    bauma 2004 will feature a couple of firsts for one of the world’s largest construction and building materials machinery exhibitions. The event is scheduled for March 29 through April 4 of next year a

    Jan 1, 2003

  • NIOSH
    RI 7173 A Petrofabric Study Of Tectonic And Mining-Induced Deformations In A Deep Mine

    By Elbridge W. Gresseth

    Rock deformational structures in a deep mine were analyzed by petrofabric techniques to learn (1) the relative magnitude and direction of the principal stresses involved in tectonic deformations prior

    Jan 1, 1968

  • NIOSH
    OFR-35-79 Development Of New Bond Release Criteria For Surface Coal Mines In The Eastern And Interior Coal Provinces Of The United States

    By William M. Knuth

    This study involved a review of bonding and bond release practices in the states of the Eastern and Midwestern Coal Provinces. Data was collected from regulatory authorities and site visits to documen

    Jan 1, 1978

  • CIM
    Increasing Availability through Advanced Gearless Drive Technology

    By C. Dirscherl, M. Combes

    "Declining ore grade, leading to increased material transport and plant throughput requirements, is one of the major challenges in the current mining environment. This is accompanied by rising energy

    Jan 1, 2014

  • AUSIMM
    Bioheapleaching of Black Schist-Hosted Nickel-Copper-Cobalt- Zinc Ore in Subarctic Conditions at Talvivaara, Finland

    Talvivaara deposits, Kuusilampi and Kolmisoppi, comprise one of the largest sulfide nickel resources in the world with 642 Mt in Measured and Indicated Resource categories. TalvivaaraÆs preferred extr

    Jan 1, 2009

  • AUSIMM
    Estimating Breakage of Fine Ore Particles by Media in a Small Ball Mill Using DEM

    Estimating Breakage of Fine Ore Particles by Media in a Small Ball Mill Using DEM

    Sep 13, 2010

  • AUSIMM
    A Description of the Iron Ore Industry at Iron Knob and Whyalla

    The whole of the iron ore required by the Broken Hill Proprietary Company Limited at the Newcastle Steel Works, and Australian Iron and Steel Limited, at Hoskins' Kembla Works, is drawn from the

    Jan 1, 1937

  • SME
    Development Of A Methodology That Integrates Environmental And Social Variables In The Investment Decision Process For Mining Projects

    By J. A. Botín

    In modern mining, the core of mine planning and design is the block model, a simplified representation wherein the ore deposit is divided in a number of virtual rock cubes, each characterized by techn

    Feb 27, 2013

  • CIM
    Froth Flotation and Agglomerate Tabling of Nonmetallic Minerals

    By Oliver C. Ralston

    DURING the development of froth flotation for the treatment of sulphide ores, a certain amount of information was collected about a few of the nonmetallic minerals, and occasionally the gangue mineral

    Jan 1, 1937

  • SAIMM
    Electric Arc On A Coke Bed In A Submerged Arc Furnace

    By J. A. Bakken, T. Magnusson, G. Sævarsdottir

    This paper describes measurements of current and voltage done on submerged arc furnaces. The aim is to focus on and attempt to separate from one another the electric arc current and the current bypass

    Jan 1, 2007

  • SME
    Feasibility And Implementation Of Shield Machine Tunnel Passing Through An Operating Airport Runway

    By Hongjie Yang

    The No. 10 metro line of Shanghai city is 36 kilometers in length and will pass through the operating airport runway by using tunnel boring machine with earth pres-sure balance mode. Although there ar

  • NIOSH
    RI 7065 Piezoelectric Pulsing Equipment For Shear Wave Velocity Measurements In Rock Samples

    By Francis X. Cannaday

    Equipment and techniques were developed with Bureau of Mines facilities for measurement in the laboratory of sonic shear wave velocity in variously shaped rock specimens in a wide range of sizes. A va

    Jan 1, 1968

  • ISEE
    Blast Optimization of Hard Ores at Phu Kham Open Pit

    By Wayne Rogers, Kell Monro, Arthur Pacunana

    The Phu Kham Copper-Gold Operation (PKM) is a large-scale open pit mine located in northern Laos. It was developed and is operated by Phu Bia Mining Limited (PBM) a Lao-registered subsidiary company o

    Jan 1, 2018

  • NIOSH
    OFR-50(1)-75 Evaluation Of Mill Tailings Disposal Practices And Potential Dam Stability Problems In Southwestern United States, General Report, Volume I

    This report presents the results of a study of mill tailings disposal practices and potential tailings dam stability problems. Recognizing the long period of time that would be required to develop the

    Jan 1, 1974

  • CIM
    Stuck in Traffic and Boiling Over - Why project-level thinking can?t fix portfolio-level problems

    By Stuart Elliot

    Brownfield project portfolios are notoriously hard to manage. Day to day there is a constant stream of changes and challenges within projects and across the whole program. When the budget year is over

    Nov 1, 2011