Search Documents

  • NIOSH
    OFR-103(1)-75 Circuit Breaker Development And Application - USBM Contract Phase I Report - Section 1. Program Objectives And Results - 1. 1 Background

    By D. A. Paice

    Direct current electrical systems are used in most coal mines primarily to power the main haulage trains and secondarily to feed other equipment and passageway lighting. Electrical power is supplied f

    Jan 1, 2012

  • DFI
    Design and Construction of the Thames Water Lee Tunnel Shafts, London

    By Sivilay Sayavong, David Puller, Julian Gatward, David Hard, Martin Stanley

    "AbstractThe Thames Water Tideway Tunnels programme involves the upgrade of London’s combined sewer and storm water system. The first section is the Lee Tunnel between the Beckton Sewage Treatment Wor

    Jan 1, 2014

  • SAIMM
    Integrated comminution and flotation neurocontrol using evolutionary reinforcement learning

    By A. v. E. Conradie, I. Nieuwoudt

    Comminution and flotation circuits are frequently perturbed by disturbances, such as feed particle size variations, ore hardness and varying mineral liberation, which can have a significant impact on

    Jan 1, 2003

  • SME
    The Factorial Model As A Way Of Thinking About The Results Of A Multi-Factor Lab Experiment Or Plant Trial

    By F. Bruey

    The Factorial Model Experimenters are often interested in systems that are multi-factorial. A multi-factorial system is one whose output is believed or known to be dependent on the particular setti

    Jan 1, 2007

  • TMS
    Characterization of the Deep Interface Traps in Hf-based/Si Gate Stacks

    By S. Y. Tan

    As continual complementary metal?oxide?semiconductor (CMOS) scaling requirements, metal gate/high-k dielectric/Si gate stacks are expected to replace poly-Si/SiO2/Si gate stacks in the future CMOS sub

    Jan 1, 2010

  • DFI
    Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? Introduction

    By Brian R. Zuckerman

    The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State

    Jan 1, 2002

  • SME
    New York-New Jersey?s Mass Transit Tunnel Moves Ahead

    By Arthur D. Silber

    The economic success and growth of any metropolitan region depends on mobility. Today, mobility between New Jersey and New York is threatened by a transportation system that cannot meet 21st century t

    Jan 1, 2009

  • SME
    Longwall Mining, Shale Gas Production, and Underground Miner Safety and Health

    This paper presents the results of a unique study conducted by the National Institute for Occupational Safety and Health (NIOSH) from 2016 to 2019 to evaluate the effects of longwall-induced subsurfac

    Jan 7, 2020

  • NIOSH
    RI 3673 Stemming in Metal Mines, Progress Report 5

    By Wing G. Agnew, John A. Johnson

    "INTRODUCTION This paper is one of a series being published by the Bureau of Mines pertaining to an investigation on the use of stemming in metal mines now being conducted at the Mount Weather Testing

    Dec 1, 1942

  • AIME
  • SME
    Hydrologic Assessment Of Waste Rock Stockpiles: A Case Study From Ajo Mine, Arizona

    By A. L. Williamson, G. Savci

    Hydrologic assessments of existing and proposed waste rock stockpiles (WRS) are typically required for application of operating and closure permits at mine sites. The results of these assessments can

    Jan 1, 2002

  • AUSIMM
    Optimization techniques for the open pit limit problem

    By Giannini M

    Of the optimization techniques proposed in determining the optimum open pit limits, dynamic programming and graph theory have proved most successful. However, publications on these two methods lack a

    Jan 1, 1986

  • SME
    Understanding Geologic and Mining Conditions for Mine Management Decisions: A Case Study

    By Kevin Andrews, Terry Hamric, Scott Nelson

    "Mining conditions in underground coal mines are dictated by the environment in which the coal seams were geologically deposited. Depositional features can change rapidly, significantly affecting mini

    Jan 1, 2019

  • SME
    Maintaining Ring Gears in Ball Mills

    By David Kress

    Mill crushing drive systems are essential to cement producers. With the increased emphasis on operating efficiency, it is vital that these systems be dependable and reliable. No one needs the costs

    Jan 1, 2000

  • AUSIMM
    Concentration of Phosphate Ore by Flotation With/Without Desliming

    Concentration of Phosphate Ore by Flotation With/Without Desliming

    Sep 13, 2010

  • CIM
    Coal-stratigraphic geochemistry: Trends in coal samples from Sydney Coalfield, Upper Carboniferous, Nova Scotia

    By Erwin L. Zodrow

    "IntroductionThrough an extensive coal sampling project in the Sydney coalfield of Nova Scotia during 1981 - 1984 involving a majority of the mineable coals (Zodrow, 1985, Fig. 1), a sizeable inventor

    Jan 1, 1986

  • AUSIMM
    Australian Innovations in High Pressure Grinding Rolls and Large Grinding Mill Manufacture

    By E J. Hofmann, J E. Hofmann, A J. Hofmann-Fritz

    "With its Head Quarters in Perth, global heavy engineering company Hofmann Engineering is one of the largest family owned engineering companies in Australia. The company has pioneered a number of new

    Jul 15, 2013

  • AUSIMM
    Using Haulage Accidents and Incident Reports to Identify the Impact of Substandard Haul Road Design on Operational Safety

    Well designed and maintained haul roads are the key to minimising truck haulage on-road hazards and costs, as well as increasing productivity. However, practically designing and managing a haul road f

    Dec 6, 2010

  • AUSIMM
    Glass Earth Gold Exploration: Combining Geoinformatics Data Intervention

    By J Cahill, D Holden, R Stuart, G Cryan, W Power, W Stratford, S Garwin

    The combination of Stage 1 Geoinformatics legacy data intervention processes with the Stage 2 ultra-detailed airborne geophysical prospecting demonstrates a new approach to converting data to informat

    Jan 1, 2005

  • NIOSH
    IC 9371 Aluminum Availability And Supply - A Minerals Availability Appraisal

    By David R. Wilburn

    The U.S. Bureau of Mines investigated the resources, costs, capacities, market relationships, and short-and long-term supply of bauxite, alumina, and aluminum. The 45 evaluated mines and deposits in 1

    Jan 1, 1993