Onsite Assembly And Hard Rock Tunneling At The Jinping-II Hydropower Station Tunnel ProjectBy Stephen M. Smading
The Jinping-II hydroelectric project in China features four parallel headrace tunnels approximately 18-km- (11-mile-) long. Two will be excavated by tunnel boring machines (TBM) and two by drill-and-b
Jan 1, 2009
-
IC 7692 Technology Of Lignitic Coals - In Two Parts-Part 2: Combustion-Power Generation; Carbonization; Gasification; Hydrogenation; Other Chemical Processing ? 1. Combustion ? Power GenerationThe lignite deposits of the United States represent a huge potential source of fuel for power generation. It has been estimated that lignite constitutes about 24 percent of the remaining National rese
Jan 1, 1954
-
Undercutting to Surface Breakthrough – Cadia East Panel Cave (Stage 1)By B Mobilio, M Secheny, J Rachocki, G B. Sharrock, A Jäger, J L. Lett, I Brunton, G W. Capes
Establishment of the Cadia East Panel Cave Stage One (PC1S1) commenced with the firing of the first bell in early 2011. Production began with the completion of the undercut in May 2014. PC1S1 used a p
May 9, 2016
-
Kell Hydrometallurgical Process For Extraction Of Platinum Group Metals And Base Metals From Flotation Concentrates ? SynopsisBy K. S. Liddell
The Kell Process has been developed for the extraction of platinum group metals (PGMs) and base metals from sulphide flotation concentrates. The process has been successfully tested on several differe
Jan 1, 2012
-
Mineral Indicators - Aluminum (6c2db0c2-24ce-43aa-ac98-cce9e62a63ec)Several primary ingot producers have introduced price changes for July. Howmet Aluminum Corp., Revere Copper and Brass, Inc. and the Anaconda Co, will increase late-July prices of 99.5 percent unalloy
Jan 1, 1978
-
Bindura Nickel Smelter - From Decommissioning, Care And Maintenance, To Plant Re-StartBy A. Mboma
Keywords: Furnace, decommissioning, care and maintenance, re-start, funding, nickel Bindura Nickel Corporation (BNC) operates two nickel mines, and treats concentrates from these mines as well as
Jan 1, 2011
-
Several Scientific Issues on Ground Control in the Mining of Thick Coal SeamsChina has made great progress in thick coal seam mining, commonly characterized by longwall top-coal caving mining and single-pass longwall mining with a large cutting height. At present, the maximum
Jul 28, 2020
-
The Gold-Antimony Veins of Costerfield, VictoriaTHE township of Costerfield is situated in the parish of Costerfield, county of Dalhousie, and lies 6 miles east of Heathcote and 30 miles south-east of Bendigo. It is separated from Heathcote by the
Jan 1, 1922
-
Producing - Equipment, Methods and Materials - Effect of Isolated Vertical Fractures Existing in the Reservoir on Fluid Displacement ResponseBy J. W. Givens, P. B. Crawford
A potentiometric model study has been made of the effect of vertical fractures existing in the matrix of the reservoir on the flooding or cycling performance. Fractures can have unusual flow character
Jan 1, 1967
-
Critical investigation into the problems surrounding pillar holing operationsBy L. Mpolokeng, J. P. Labuschagne, H. Yilmaz
"An investigation into pillar cutting was carried out at a platinum mine on the western limb of the Bushveld Complex. The focus was on crush pillar design and implementation in order to ultimately imp
Jan 1, 2015
-
Transformation of Iron Oxide By-products During the Becher ProcessBy Muir DM, Ritchie IM, Gibbons SL
Fundamental studies on the transformations of iron oxides have been carried out and related to the solution conditions in the Becher Process. The results show that a number of iron oxide interconve
Jan 1, 1989
-
Development of platinum-group minerals in laterites - initial comparison of organic and inorganic controlsBy A. P. Gize, J. F. W. Bowles, D. J. Vaughan, S. J. Norris
Paper presented at the IAGOD international symposium on mineralization related to mafic and ultramafic rocks held in Orleans, France, 1-3 September 1993. Geological evidence from tropical laterites in
Apr 1, 1994
-
Environmental assessment: a new experienceBy I. J. Brown
Paper prepared for presentation at Industrial minerals and the environment, held in Leeds, 24-35 September 1990. The need to submit an environmental statement (EIS) has certainly increased the workloa
Jan 1, 1991
-
Mining Methods at Iron Knob, South AustraliaIn setting out to describe the methods and machinery employed at Iron Knob the writer does not attempt to give any information as to the situation, topography or geological features of the locality. T
Jan 1, 1936
-
Honeywell Multivariable Predictive Control Implementation in the Goldex Grinding CircuitBy M. R. Dion, K. Frenette, R. K. Jonas, S. Simard, F. Robichaud
"In 2011, a site study indicated that the application of Honeywell’s Multivariable Predictive Control Technology (MPC) to the Goldex processing facility would provide significant opportunities for imp
Jan 1, 2017
-
The Manufacture of Sulphuric Acid and its Use in MetallurgyOwing to the number of chemical processes now in use for the separation of metals from their ores, and the consequent employment of chemicals at the mine, it is sometimes necessary to be able to produ
-
Potential for the Utilisation of Micro-Organisms in Gold ProcessingBy D C. McPhail, S L. Rogers, J Brugger
Using iron- and sulfur-oxidising bacteria to catalyse the breakdown of sulfides that host the gold is an important biological method for the pretreatment of refractory gold ores. Following this biolog
Jan 1, 2007
-
Soil Washing and Bioremediation of Slime Dam Material from a Gold And Uranium MineThe solvent extraction section of an old Uranium Plant in the Vaal River region (North West Province in South Africa) produced a substance called CRUD (Chalk River Unidentified Deposit) that formed wi
Jun 1, 2010
-
Case studies illustrate the need for a new concept of coal pillar designBy Syd S. Peng
Introduction The most commonly used ground control design in coal mining is the determination of pillar size by various pillar strength formulae for mine layout (Bieniawski, 1983; Holland, 1973; Hust
Jan 11, 1986
-
Development of downward compact conical-ended borehole overcoring technique for rock stress measurement at great depthBy Y. Suzuki, H. Yoshida, K. Sakaguchi, K. Matsuki, M. Minami
To estimate three dimensional in-situ stress at great depth, Downward Compact Conical-ended Borehole Overcoring (DCCBO) technique, which is one of stress relief methods, was developed. DCCBO techniqu
Jan 1, 2003