Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Ore Characterization For Process Control: An Update Of A Mesabi Range ProjectBy Richard Gertsch, Jack Eloranta, Leslie Gertsch
An ongoing research program is characterizing the ore qualities that most affect mine and mill processing of iron. Current practice uses assays of magnetic iron and silica, but additional qualities a
Jan 1, 2005
-
-
Mathematical modelling of oxidative leaching of nickel concentrate magnetic fractionBy M. I. Kalashnikova, Y. M. Shneerson, E. E. Zhmarin, Y. V. Degtiarev, E. M. Vigdorchik
Separation of a magnetic fraction from nickel concentrate following matte flotation, and its treatment in a separate circuit enable reduces precious metals losses. The magnetic fraction is treated in
Jan 1, 2005
-
Geotechnical Considerations In The Design Of The MOCB Mining Method At Konkola No.3 Shaft.By M Lipalile, A B. Tunono, A W. Naismith
Konkola No 3 shaft experienced severe mining induced stress and time related deterioration in ground conditions in an area where an over-cut and bench (OCB) mining method was used to extract a shallow
Jan 1, 2005
-
Decommissioning For Sustainability with Ecological EngineeringBy Margarete Kalin
"Difficulties arise in implementing environmental technologies in the mining sector because important fundamental processes, which lead to the environmental degradation, are ignored. Weathering rates,
Jan 1, 2005
-
Developments of Granular Emulsion ExplosivesBy Takuya Taguchi, Toshihiro Ogata, Atsuio Inoue, Shigeyuki Sasaki
Highly improved drilling machines and mucking machines have been used for the underground construction. To have rapid construction, the roles of blasting operation ha ve been growing more important. A
Jan 1, 2005
-
Adventures in MicrotunnelingBy Joseph Clare, Elizabeth Anderson, Mike McGinley, Ron Hines, Judy Cochran
The South Lake Union Pipelines contract for King County Wastewater Treatment Division and Seattle Public Utilities in Seattle, Washington included three 1.8 m (72-in)inside diameter microtunneled pipe
Jan 1, 2005
-
The Sullivan Concentrator ù The Last (and Best) Thirty YearsThe optimal production of the metals needed by society is best achieved by a close synergy between concentrate production and smelting. For over 75 years commencing in 1923, such a close relationship
Jan 1, 2005
-
The Relationship Between The Client, Clients Project Team And The EPCM Project TeamBy C. A. F. Sweet
The inter-relationship between these parties and the effect on the outcome of the project is often grossly underestimated. There are numerous success stories where the parties have worked as com
Jan 1, 2005
-
Future Directions in Ground Vibration and Airblast Control within an Australian Regulatory ContextBy A Brodbeck, AT Spathis
Australian regulatory control of ground vibration and airblast arising from mining, quarrying and civil construction operations is spread across a number of federal, state and local authorities and ac
Jan 1, 2005
-
Emerald Mining in AfghanistanBy Antoni Kalukiewicz
From 1997 through 2000, a team of Polish experts headed by the author studied the prospects of mining newly discovered emerald deposits in Afghanistan. This article describes the scheme for mechaniza
Jan 1, 2005
-
Design Of The Marine Foundation For The Skyway Project Of The San Francisco Oakland Bay BridgeBy Gerry Houlahan
The east span of the 3.5 km long SF-Oakland Bay Bridge is supported by different types of foundations along its span. Starting from the west, its first 460 m section comprising twin concrete box-girde
Jan 1, 2005
-
Predicted versus Actual Obstructions for Two Pipe-Jacked Tunnels of the Henderson CSO, Seattle, WashingtonBy Dennis Molvik, Roberto J. Guardia, Brad Cowles, Rick Andrews, Robert A. Robinson
A 220-meter (m) segment of the Henderson/ ML King Combined Sewer Overflow(CSO) consists of two 1.8-meter-inside diameter (I.D.) pipe-jacked tunnels that pass beneath Interstate-5 and the BNSF and UPRR
Jan 1, 2005
-
Development of a new criteria function to predict microporosity in 319 Al-Si castingsBy L. H. Shang
The 319 Al-Si alloy is one of the most prominently used aluminium-based alloys in motor vehicle and engine applications, Microporosity present in 319 alloy castings reduces the load bearing capacity o
Jan 1, 2005
-
7.1 Spangenberg - Sampling Standards In Anglogold Ashanti Gold Mines In SaBy Conné Spangenberg
Contents ?Introduction ?Metal accounting environment ?Problem statement ?Investigations & Achievements ?Metal Accounting ?Principles ?Standards ?Audits ?Questions
Jan 1, 2005
-
The Green Mining Technique in Chinese CollieriesBy Minggao Qian, Jialin Xu, Wenqi Lai, Weibin Zhu
This article advances an innovative concept explaining the connotation and technical system of "green" mining. The important theoretical foundations of "green" mining are the distribution and developm
Jan 1, 2005
-
Economics, Resources, Environment and Technology As Driving Forces in the Base Metals IndustryBy A. D. Dalvi
Economics, Resources, Environment and Technology are the major driving forces in the base metals industry. However, these factors are intertwined and together will propel the industry in the future. T
Jan 1, 2005
-
High Pressure Grinding of Gold Ore HPGR Demonstration at Newmont’s Lone Tree MineBy Polysius AG
"The Lone Tree demonstration was an important milestone in bringing High Pressure Grinding Roll (HPGR) technology into hard rock applications in the mining industry. HPGRs have become standard equipme
Jan 1, 2005
-
Common Infrastructure Project ù Development for the Future of PT Freeport IndonesiaBy B Mennie, R Poedjono, G Coad
PT Freeport Indonesia operates a large copper and gold mining operation near Tembagapura, Papua (formerly, Irian Jaya), Indonesia. This is a remote location with its own set of unique operational char
Jan 1, 2005
-
Sustainability in Opencast Mines of the Rhenish Lignite Mining Area - Planning from Start to FinishBy L. Kulik
Sustainability of lignite mining in the Rhenish lignite mining area is ensured by a preceding study of the overall project, with the involvement of all those affected. The supporting holistic consider
Jan 1, 2005