Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design Of Scalloped-Bottomed Thickener TanksBy John R. Buzek
Thickeners are simply large tanks, usually circular in shape, which are designed to allow settling of solids and to operate with continuous overflow of clear water and underflow of thick pulp. The dim
Jan 1, 1977
-
Design of Segmental Lining for Waterview Project, Auckland, New?ZealandBy S Pradhan, A Kuras, R Mahajan
This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan
Sep 17, 2014
-
Design Of Self-drilling Micropiles For Permanent ApplicationsBy Racquel Nottingham, Freddy Lopez, Ole Gadermann
The ongoing urban development is a global phenomenon, placing has high demands on urban infrastructure (housing, public services, transportation, telecommunications, etc.). Micropiling is one of the m
-
Design of Shallow Caverns in an Urban EnvironmentBy S Pollak, A Amon
This paper describes the current and finished design work which has been performed for shallow rock station caverns for New York CityÆs first new subway construction in 60 years. A new robust, sophist
Jan 1, 2008
-
Design of Shallow Tunnels for Washington Dulles International Airport People MoverBy Frank P. Frandina, Diane R. Hirsch, David P. Field, Colin R. Weeks
To accommodate growth in air service and to follow the Master Plan for long-term airport development, the Metropolitan Washington Airports Authority established thed2 Development Program at Washington
Jan 1, 2005
-
Design Of Sheet Piling For The Prague Metro Line CBy Jan Pru?ka
This paper describes the sheet pile design for the Line C extension from Ládví station to the North of Prague. The first part of the paper describes the geological conditions and structural configurat
Jan 1, 2011
-
Design of Solution Heat Treatments for Aerospace AlloysBy J. Beddoes
Many high strength aerospace alloys undergo solution heat treatment (SHT) and aging to develop precipitate strengthening. Most simply, SHT involves an isothermal hold in a single phase region followed
Jan 1, 2010
-
Design of steel arch supports for gate roadwaysBy Pierre Choquet
"The whole work carried out both in situ and in laboratory by a research group of the West German collieries is presented. This work has led to a design method of steel arch supports for gate roadways
Jan 1, 1986
-
Design Of Stillwater Mining Company’s East Boulder MineBy D. Einarson, B. Strickland
The decision to accelerate development of Stillwater Mining’s East Boulder Mine was made in March of 1998. It required the completion of conceptual designs by July of 1998. This was accomplished thr
Jan 1, 1999
-
Design Of Supersonic Nozzles For Ultra-Rapid Quenching Of Metallic VapoursBy M. N. H. Khan
CSIRO has been experimenting with supersonic flows as a method of rapidly quenching metallic vapours. Cooling rates above 106 °C/s have been achieved. The supersonic flow conditions are achieved by ad
Jan 1, 2006
-
Design Of Surface And Near-Surface Construction In RockBy A. J. Hendron, D. U. Deere, F. D. Patton, E. J. Cording
In the design of structures founded in the near-surface rock, a distinction may be made between those problems that are related to the strength of the rock mass, and those that are related primarily t
Jan 1, 1967
-
Design of Teach Pendant for Robot Glazing SystemBy Seungyeol Lee
Currently, a new construction method using a robotic system is widely spreading in construction sites. This study is related to the design of glazing robot?s teach pendant which can improve convenienc
Aug 1, 2013
-
Design of the AGA Brasil Refractory Gold Pressure Oxidation PlantBy I. Masters, K. Buban, M. Faris, M. Antonio, M. Collins
"AngloGold Ashanti Brasil, with assistance from Sherritt International Corporation, has recently commissioned a new autoclave for the pressure oxidation of refractory gold feeds at their Corrego do Sí
Jan 1, 2012
-
Design of the Akron Northside Interceptor CSO Tunnel - RETC2023By Dominick Mandalari, David Mast, Heather Ullinger, Juan Granja, Amanda Foote
The City of Akron will construct the Northside Interceptor Tunnel project, a U.S. EPA/ DOJ CSO Long Term Control Plan Project. The system will provide at least 10.3 million gallons of storage in a 16.
Jun 13, 2023
-
Design of the Biggest Mill in the WorldBy G Lane, S Morrell
The design of the 12 m diameter SAG mill installed at the Cadia Hill Mine in New South Wales followed after two years of extensive laboratory and pilot plant testwork. The testwork showed the Cadia or
Jan 1, 2000
-
Design Of The BMIP Boat Section - IntroductionBy Kenneth Pidgeon
The Boston Marine Industrial Park (BMIP) Boat Section, which is part of contract C04A2 of the Central Artery/Tunnel (CA/T) project, is currently under construction in South Boston, Massachusetts (Fig.
Jan 1, 1994
-
Design of the Brightwater Conveyance TunnelsBy Leon Maday, Dan L. Pecha, Jeremy Johnson, Daniel N. Adams
The Brightwater conveyance system includes 26 km of tunnels, a 130 mgd pump station, 2 km of micro tunnels, and a 2.4 km outfall. The tunnels extend from Woodinville to Puget Sound through varying soi
Jan 1, 2005
-
Design Of The Conda, Idaho Phosphate Rock Processing MillBy A. Guzman
The design and construction of a new 140-ton-per-day R. O. M. phosphate rock scrubbing and washing plant was undertaken by Western Knapp Engineering Company, a Division of Arthur G. McKee and Company,
Jan 1, 1969
-
Design Of The Drilled Shaft Foundations For The Cooper River BridgeBy Liang Shen
The Cooper River Bridge, the longest cable-stayed bridge in North America, replaces two existing bridges along U.S. Highway 17 and connects the City of Charleston and the town of Mount Pleasant, South
Jan 1, 2013
-
Design of the Epping to Chatswood Rail Line, Sydney, AustraliaBy Jim Rozek, Robert A. Gee
The Epping to Chatswood Rail Line project is the largest publicly funded infrastructure project in New South Wales. Construction commenced in November2002 with opening scheduled for 2008. The work inc
Jan 1, 2005