    Design and Testing of Bubble Curtain at Whirl Bay, BC

    By Alastair Grogan

    In October of 2002, the author was retained by Public Works and Government Services Canada, on behalf of the Department of National Defense, to design, construct and test the effectiveness of a bubble

    Jan 1, 2005

  • DFI
    Design And Testing Of Deep Foundations For Wind Turbines In Western Alaska

    By Lorie M. Dilley

    Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alaska villages, has made a concerted effort to install wind turbines in the villages they serve in an

    Jan 1, 2010

  • AUSIMM
    Design and testing of high capacity surface support

    By T Roberts, S Talu

    Steel wire weld mesh is a common industry standard surface support used in underground mining, traditionally installed with mining drills during the bolting cycle. As underground mining depth and stre

    Nov 30, 2018

  • SME
    Design And Testing Of Multi-Channel Borehole Geophone Array

    By E. C. Westman, F. J. Shreve

    This paper presents the design and construction of a multi-channel geophone array that improves tomographic imaging capabilities in both surface and underground mines. Especially important in the des

    Jan 1, 2002

  • AUSIMM
    Design and Use of Backfill for Support in Polish Coal Mines (80b269b9-766a-4488-9ab9-f96403287b88)

    By J Palarski

    Over the last 100 years in the Polish mining industry considerable work has been done to assess optimum slurry, develop flexible delivery systems and adjust the fill technology to a wide variety of

    Jan 1, 1998

  • CIM
    Design and wear of SAG mill shell liners at Brunswick mine

    By C. Larsen, I. Orford, L. Strah, M. Renaud, P. Radziszewski

    "An AG/SAG mill was commissioned at the Brunswick mine concentrator in October 1998. This paper discusses the original shell top hat liner design for the bi-directional AG/SAG mill, observed liner wea

    Jan 1, 2005

  • DFI
    Design Approaches for Externally Supported Earth Retaining Systems – Details and Limitations

    By Matteo Montesi

    Deep foundation elements are often used as discrete elements in externally supported earth retaining structures such as soldier piles and lagging walls, secant/tangent pile walls, anchored walls, etc.

    Jan 1, 2018

  • SME
    Design Approaches In Quarrying And Pit-Mining Reclamation

    By Belinda F. Arbogast

    Reclaimed mine sites have been evaluated so that the public, industry, and land planners may recognize there are innovative designs available for consideration and use. People tend to see cropland, ra

    Jan 1, 1999

  • SME
    Design Aspects Governing Disc Cutters and Cutterheads of Hard Rock TBM—A Review - Mining, Metallurgy & Exploration (2024)

    By V. M. S. R. Murthy, Biswaraj Dash, Somnath Chattopadhyaya

    Tunnel boring machine (TBM) has been in focus for the last few decades and is currently the most preferred excavation method for metro, hydro and irrigation tunnels. Tunnelling in hard and abrasive ro

    Jan 31, 2024

  • SME-ICGCM
    Design Aspects In Multiple-Seam Mining: Case Studies

    By Gregory J. Chekan

    Developing a coal seam that has been influenced by previous mining in seams either above or below can result in severe ground control problems. In many instances, interactions between operations are i

    Jan 1, 1990

  • SME
    Design Aspects Of A Mineral Processing Simulation Package

    By G. T. Adel

    This paper presents the highlights of a general-purpose simulator for mineral processing plants that is being developed at the University of California, Berkeley. The state-of-the-art structured desig

    Jan 1, 1982

  • CIM
    Design Aspects of Autoclave Batten Strips

    By D. Want

    In titanium-lined autoclave design the most critical point of its mechanical reliability is its titanium batten strips present at the circumferential and longitudinal barrel-weld seams. Recently an Au

    Jan 1, 2005

  • AIME
    Design Aspects Of Stelco's BOF Facility

    By George Newton

    When Mr. Bailey asked us to present a paper describing our new BOF shop, he requested that we avoid a presentation heavily laden with detail and statistics. Not only have we attempted to do this, but

    Jan 1, 1972

  • SME
    Design Aspects Of The Minera Alumbrera Concentrator Circuit

    By V. P. Keran

    Design of the Bajo de la Alumbrera Project started in June 1995 and concentrate production commenced early in the Third Quarter of 1997. The project is situated in North-Western Argentina and is being

    Jan 1, 1998

  • SME
    Design Aspects Of Underground Rescue Chambers

    By A. D. S. Gillies

    The use of refuge chambers for use in handling underground emergencies is an issue of topical relevance within the US mining industry. Chamber design is of importance to meet some new safety requireme

    Jan 1, 2012

  • AIME
    Design Aspects Relating to the Stability of Coal Mining Tunnels

    By B. N. Whittaker, C. J. Bonsall

    The paper gives an account of the factors influencing the stability of coal mining tunnels and goes on to examine various bases of support and lining design of such tunnels in relation to geological a

    Jan 1, 1983

  • SME
    Design Based on Numerical Modelling a Requirement for an Economical Tunnel Construction

    By Gunter Swoboda, Harald Wagner

    Until a few years ago tunnel construction was based exclusively on experience. In recent years, however, numerical models have increasingly become an integrated part of tunnel design [2]. These models

    Jan 1, 1993

  • SME
    Design Build and Design Bid Build Traditional Project Delivery Methods and Modern Industry Trends. What is Most Efficient?

    By Giuseppe M. Gaspari, Tamara Kondrachova

    Contract practices affect cost and schedule of tunneling works, impacting risk allocation between Owners and Contractors. The Authors compiled a dataset of projects constructed in the Toronto Area bet

    Jun 13, 2021

  • DFI
    Design Build of the New NY Bridge Foundations

    By Leykam Chris J., Jacobs Scott. A.

    "Construction of the New NY Bridge over the Hudson River 25 miles north of New York City is one of the largest civil infrastructure projects presently underway in the United States (formerly Tappan Ze

    Jan 1, 2016

  • SME
    Design Concepts For Tomorrow’s Optimized Solvent Extraction Mixer Settler

    By B. Gigas, M. Preston, M. Giralico

    Optimized mixer settler designs will now handle total flows of over 6,000 m3/hr.Computational Fluid Dynamics (CFD) is a timely and predictable tool for design development. Lightnin has the capability