Search Documents

  • DFI
    Design And Application Of Vertical Micropiles To Resist Large Lateral Loads

    By Helen D. Robinson

    Traditional practice to resist large lateral loads on foundations is the use of large diameter caissons, battered driven piles, or battered micropiles. Dense urban construction environments, however,

    Jan 1, 2010

  • SME-ICGCM
    Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)

    By Larry DeGraff

    With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr

    Jan 1, 2009

  • AUSIMM
    Design and calibration of a climate resilient Type B (adapted) sediment basin at the Dugald River Mine in the north-west Queensland minerals province

    By A Harburg, A Dendys, G Green

    Dugald River Mine (DRM) is located approximately 85 km north-east of Mount Isa, and 65 km northwest of Cloncurry, in the north-west Queensland Minerals Province of Australia. DRM is an underground ope

    Aug 2, 2023

  • AUSIMM
    Design and Commissioning of a 40 Tonne per Day Flotation Concentrate Bio-Oxidation Treatment Plant at the Harbour Lights Mine

    By Carter A. J, Miller D. M, Holder N. H M, Van Aswegen P C

    The Harbour Lights Mine situated at Leonora in Western Australia, mines a refractory sulphidic gold ore. The main sulphide minerals are pyrite and arsenopyrite. Due to the association of gold with the

    Jan 1, 1992

  • CIM
    Design and Commissioning of Commercial Coal Preheating Plants

    By R. H. Chambers, L. Alderman

    "The paper is introduced by an examination of the factors which have led to the present world-wide interest in charging preheated coal to coke ovens. Various possible methods of preheating and chargin

    Jan 1, 1972

  • TMS
    Design and Commissioning of the Ausmelt TSL Lead Smelter at Yunnan Tin Company Limited

    By Ross Baldock, Ross Andrews, Gu Helin, Lan Xu, Markus Reuter, Song Xingcheng

    "A commercial lead smelter using Outotec Ausmelt TSL Technology has been successfully commissioned and put into operation at Yunnan Tin Company Ltd operations near Gejiu City, in Yunnan Province, Chin

    Jan 1, 2012

  • AUSIMM
    Design and Commissioning of the Ridgeway Concentrator

    By B Clemen, D Gordon, F Cesnik, P Griffin

    In March 2002 Newcrest Mining Ltd commissioned a 4 Mtpa gold-copper concentrator at its Cadia Valley Operations in New South Wales. This paper presents the design and construction considerations, comm

    Jan 1, 2003

  • DFI
    Design And Construction Aspects Of A Deep Basement In Dublin - Synopsis

    By Philip J. Daynes

    As part of the regeneration of the centre of Dublin, a multi-functional development is being constructed on the site of the historic Smithfield Fruit Market. The site is being developed in three phase

    Jan 1, 2003

  • DFI
    Design and Construction Benefits of Performing a Bi-Directional Test on a Drilled Shaft in Sand, Gravel, and Cobble Deposits

    By Marco Fellin, Van E. Komurka

    Significant cost and construction benefits were obtained from performing a bi-directional static load test prior to construction on the Russell Street Bridge Replacement project in Missoula, Montana.

    Jan 1, 2019

  • SME
    Design And Construction Challenges At The Gualcamayo Mine

    By N. Ward

    The Gualcamayo Mine is located in the Andes Mountains north of San Juan, Argentina (Fig. 1). A property of Yamana Gold Inc., it declared commercial production in July 2009 and has a total mineral rese

    Jan 1, 2011

  • SME
    Design And Construction Challenges At The Gualcamayo Mine ? Introduction

    By N. Ward

    The Gualcamayo Mine is located in the Andes Mountains north of San Juan, Argentina (Figure 1). A property of Yamana Gold Inc, it declared commercial production in July 2009 and has a total mineral re

    Jan 1, 2011

  • SME
    Design and Construction Challenges at the Piney Branch CSO 049 Storage Tunnel in Washington, DC - NAT2024

    By Ritika Kundu, Moussa Wone, Amanda M. Morgan, Tatiana K. Proctor

    The Piney Branch CSO 049 Storage Tunnel (PBST) will be the last major project for the DC Clean Rivers Program. The project includes construction of a 2,200-foot-long, 18-foot-internal-diameter storage

    Jun 23, 2024

  • SME
    Design and Construction Challenges at the Potomac River Tunnel in Washington DC - RETC 2021

    By Moussa Wone, Martino Scialpi, Colin LaVassar, Carlton Ray

    The Potomac River Tunnel (PRT) is the next major phase of the DC Clean Rivers Program. The design-build PRT project includes a 5.5-mile-long, 18-foot-internaldiameter tunnel, seven shafts, and two und

    Jun 13, 2021

  • SME
    Design and Construction Challenges for the Ellicott City North Tunnel - NAT2022

    By Christopher Nelsen, Daniel Dobbels, R. Zachary Hollenbeck

    Recent major floods have inundated Historic Ellicott City, Maryland, resulting in loss of life and property damage. Howard County, Maryland, has developed the Ellicott City Safe and Sound Plan to miti

    Dec 1, 2022

  • SME
    Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base Tunnel

    By Michael Rehbock-Sander

    The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked

    Jan 1, 2012

  • SME
    Design and Construction Considerations for Intersecting Tunnels—Charleston, SC - RETC2021

    By Lindsey Schneider, Steve Kirk, Michael Miglioretti, Jeffrey P. Kolzow, Kyle White

    The US17 Spring/Fishburne Drainage Improvements Project utilizes a stormwater conveyance tunnel system of approximately 8,250 LF. The tunnel system includes two intersecting tunnels of differing diame

    Jun 13, 2021

  • SME
    Design and Construction Considerations for the Pawtucket CSO Tunnel - RETC2023

    By Victor Despointes, Stephane Polycarpe, Kathryn Kelly, Chris Feeney, Brian Hann, Vojtech Ernst Gall

    The Pawtucket Tunnel is a 2.2-mi, 30.2-ft diameter CSO storage tunnel in Rhode Island. The primary tunnel is built using a dual-mode open-EPB TBM capable of sealing the face within 120 seconds to mana

    Jun 13, 2023

  • DFI
    Design And Construction Considerations For The Use Of Slurry Walls To Construct Water Reservoirs In The Denver Formation

    By Ken Andromalos

    Continued population growth combined with limited water resources in the Denver area has resulted in the conversion of a number of mined out gravel pits in the area into municipal water storage facili

    Jan 1, 2007

  • AUSIMM
    Design and Construction Contract C916 Beauty World Station and Tunnels, Singapore

    By R McDonough

    DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal

    Sep 17, 2014

  • CIM
    Design and Construction Evolution of the Kemess Mine Tailings Dam

    By Georgia J. Lysay

    The Kemess Mine tailings impoundment is retained behind an earthfill and rockfill dam that, when complete, will measure about 140 m in height with a crest length in excess of 1 km. Due to weak foundat

    May 1, 2007