Consideration of Post-Peak Response of the Pillar-Rock System in Sill Pillar DesignBy Omkar N. S. Beruar
Extraction of sill pillars has always been problematic because of high risk of seismicity and rockburst. Depending on a number of factors, a sill pillar can undergo different failure modes and cause p
Aug 1, 2013
-
Consideration of Potential Effects of Climate Change and Resulting Hydrologic Impacts on Mine DevelopmentsBy Getu F. Biftu
There is general agreement among scientists that global surface temperatures have been increasing during the past decades. The increase in temperature is postulated to be the result of either an incre
May 1, 2004
-
Consideration of Some Factors Affecting the Economic Use of Wire Rope on Open-Pit Mining •EquipmentBy P. J. Finnis
This paper describes the use of wire rope on open-pit mining equipment, giving specifications and examples of the performance achieved. Installation methods are also discussed, making the paper of con
Jan 1, 1973
-
Consideration on Liquefaction Resistance of Ground Improved by the Sand Compaction Pile MethodBy Kazunori Matsushita, Masaru Sakakibara, Kenji Harada, Naotoshi Shinkawa, Mitsuo Nozu
The Sand Compaction Pile (SCP) method has been widely used as a typical countermeasure against liquefaction in Japan, and its effectiveness has been confirmed in many case histories of damages caused
Jan 1, 2017
-
Considerations and Challenges in the Design and Construction of Tunnels for Remote Hydropower ProjectsBy A G. Noble
Tunnelling for hydro-electric power projects can be a very challenging component of the overall development. In contrast to urban transportation tunnelling where the logistics for access and supply of
Mar 8, 2011
-
Considerations for a District-Level, Tunnel-Risk, Screening ToolBy Ehsan Moradabadi, Debra F. Laefer
"To more rigorously address tunneling risks to above-ground structures, vulnerability evaluation of all structures along a tunnel route is required. This multi-block area along the route can be consid
Jan 1, 2016
-
Considerations for Baselining Groundwater Conditions for Tunneling ProjectsBy Steven W. Hunt, Isabelle Lamb, Steven B. Fradkin
Groundwater control is generally an important consideration and significant source of risk during most tunneling projects. Proper baselining of groundwater conditions requires: 1) a thorough understan
Jan 1, 2005
-
Considerations For Blending Low-Rank And High-Rank CoalsBy M. Downing
This paper gives a brief overview of impacts of coal blending on coal-fired power plants performance and discuses the preliminary results of an on-going study aimed at evaluating the effect of coal pr
Jan 1, 1997
-
Considerations For Blending Low-Rank and High-Rank Coals – Preprint 97-15By O. Ogunsola, M. Downing
This paper gives a brief overview of impacts of coal blending on coal-fired power plants performance and discuses the preliminary results of an on-going study aimed at evaluating the effect of coal pr
Feb 24, 1997
-
Considerations for Conveyor Belts in Tunneling Applications - NAT2022By Ginger L. Hustrulid
Conveyor belts are a critical component in tunneling projects. This paper reviews current design considerations for conveyor belts. Rubber compounding differences to meet local fire resistance regulat
Dec 1, 2022
-
Considerations for Effective Gold Process DevelopmentBy A Giblett, R Dunne, D Appelhans
There are a number of hurdles that must be negotiated in order to design an effective gold ore treatment facility such that the expectations forming the basis of project economics are valid and can be
Jul 15, 2013
-
Considerations for Effective Ground Support in EvaporitesBy C. A. Vining, J. R. Nopola
"Evaporites, such as salt and potash, pose unique problems to ground-support designs not encountered in other rock types. Evaporites are subject to continual creep and no amount of ground support can
Jan 1, 2018
-
Considerations for Grinding Mill FoundationsBy J. V. Belke
There are many aspects of a grinding mill supply and installation that can result in the mill not operating as intended, resulting in unplanned shutdowns, poor reliability and headaches for all concer
Feb 23, 2014
-
Considerations for improving the performance of froth flotation systemsBy Richard R. Klimpel
Introduction Froth flotation is one of the most common unit engineering operations in use today. Its aim is to upgrade the quality of coal by removing ash/pyrite and separating selected minerals from
Jan 12, 1988
-
Considerations for the design and support of underground portalsBy M P. Sandy, R M. Stephenson
Portals to access underground mines are important infrastructure and their design requires careful consideration. Portals are generally expected to last for the life of the mine. Typically, the exposu
Mar 15, 2021
-
Considerations For The Resource Nationalism Debate: A Plausible Way Forward For Mining Taxation In South Africa ? SynopsisBy F. T. Cawood
This article is a continuation of a series of publications by the authors on the international debate on resource nationalism, with specific reference to South Africa. Previous outcomes have shown tha
Jan 1, 2013
-
Considerations For The Use And Application Of Continuous Monitoring SystemsBy Susan G. Bilhorn
A number of studies have been conducted in active and inactive mine environments using continuous monitoring and data acquisition systems to detect various parameters. In addition to the information o
Jan 1, 1984
-
Considerations For Using Roof Monitors In Underground Limestone Mines In The USABy Stephen C. Tadolini, Thomas E. Marshall, Cecil Banta, L. J. Prosser, Anthony T. Iannacchione
The Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) endeavors to provide national and world leadership in the prevention of work-related illness, in
-
Considerations in Blasting Influence on GrindabilityBy Panagiotis (Takis) Katsabanis, Lyall Workman, Jack Eloranta
The reduction of metallic ores to concentrate consumes a great deal of electrical energy. In the past two decades, a number of case studies have demonstrated a beneficial relationship between powder f
Jan 1, 2015
-
Considerations in Heap Leach Pad DesignBy L. A. Hansen, D. L. Buffington, G. H. Beckwith
This paper reviews geotechnical engineering considerations in heap leach pad design, discusses design philosophy and provides design procedures. A brief discussion of surface water hydrology ground- w
Jan 1, 1987