Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Staubbekampfung An Schildausbau In Bruchbaustreben (Combating Dust On Shield Supports On Longwall Mining)

    By Wilfried Ufer

    [1. Einführung in die Problematik 1.1 Die Bedeutung des Schildausbaus Seit fast 30 Jahren ist die Konkurrenzsituation auf dem Primärenergiemarkt der Bundesrepublik Deutschland durch einen von Erdöl

    Jan 1, 1984

  • SME-ICGCM
    Cementitious Seal/Rock Interface Under Hydrostatic And Dynamic Loadings (28th International Conference on Ground Control in Mining)

    By Khaled Morsy

    Cementitious seals are made of foamed cements with strength ranging from 100 to 600 psi. These cementitious seals are usually used at locations where the seal will be subjected to some convergence, as

    Jan 1, 2009

  • SME-ICGCM
    A Sonic Wave Attenuation Technique For Monitoring Of Stress Levels

    By Po-Ming Lin

    Stress has a significant effect on the stability of pillars. In order to get an accurate picture of pillar stability, one needs information not only on the primary Stress distribution but also on all

    Jan 1, 1984

  • SME-ICGCM
    Utilization of the Hilti OneStep Rock Anchor at Twentymile Coal Company to Reduce the Overall Amount of Time for Face Stabilization During Longwall Recovery

    By Bill Stormes

    This paper will discuss implementation of the Hilti OneStep rock anchor technology to improve face bolting operations during the May 2008 longwall move; increase rock anchor installation capacity; and

    Jan 1, 2008

  • SME-ICGCM
    Sizing Of Final Stumps For Safer Pillar Extraction

    By Christopher Mark

    Pillar recovery continues to be one of the more hazardous activities in underground coal mining. Safety requires that the roof above the intersection remain stable until after the pillar has been extr

    Jan 1, 2001

  • SME-ICGCM
    Trail Mountain Mine: A Case Study For Improving Locations Of Mining-Induced Seismicity With Double-Difference Relocation (2de3a4ff-91be-4a02-947a-fc4fd7ffaac8)

    By Eleanor Sonley

    In October 2000, temporary seismographic stations were installed above the Trail Mountain Mine, Emery County, Utah, USA to supplement a regional network. Over seven months, 1826 mining-induced seismi

    Jan 1, 2009

  • SME-ICGCM
    DEPOWS - A Powered Support Selection Model

    By Y. M. Jiang

    A users friendly PC Computer Program has been developed to implement a systematic design of the powered support. The required input data are: (1) thickness, RQD, and compressive strength of the immedi

    Jan 1, 1989

  • SME-ICGCM
    Optimised Layout And Roadway Support Planning With Integrated Intelligent Software

    By S. Kouniali

    Experience with knowledge-based systems for Layout planning and roadway support dimensioning is on hand in European coal mining since 1985. The systems SOUT (support choice and dimensioning, 1989), SO

    Jan 1, 1996

  • SME-ICGCM
    Multiple Seam Highwall Mining In Appalachia (428a0473-c28a-4ef9-81d1-1ed7e6911c69)

    By David Newman

    Multiple seam underground coal mining is ubiquitous in Appalachia. Many coal properties have from two to ten or more economically mineable coal seams. Because of the ability to penetrate 600-feet to

    Jan 1, 2009

  • SME-ICGCM
    Major Hazard Risk Assessment Applied To Pillar Recovery Operations (ad413764-c947-4465-9ec3-62ea91281168)

    By A. T. Iannacchione

    Recent fatal injuries occurring during pillar retreat coal mining call for better identification of the hazards and recognition of risks. Ground control hazards associated with room-and-pillar retrea

    Jan 1, 2009

  • SME-ICGCM
    Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and Monitoring

    By Peter (Yunqing) Zhang

    Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution

    Jan 1, 2006

  • SME-ICGCM
    Cavability Investigation Of A Stratabound Copper Deposit, Tong Kuang Yu Mine, Shanxi Province, China

    By W. C. Lacy

    Stratabound copper ore bodies in thick Proterozoic metamorphosed sedimentary and volcanic rocks at the Tong Kuang Yu Mine in southern Shanxi Province of China were considered as possibly being amenabl

    Jan 1, 1989

  • SME-ICGCM
    Coal Pillar Strength Based On The Ground Reaction Curve - A New Approach

    By Kazem Oraee

    In underground coal mining, particularly room-and-pillar methods, the coal pillars play a significant role in roof stability. If the pillar dimensions are increased, the pillar bearing capacity also i

    Jan 1, 2009

  • SME-ICGCM
    CISPM - A subsidence prediction model

    By Y. Luo

    A PC based computer model has been developed by the authors for predicting the surface subsidence due to underground coal mining. Its reliability, comprehensiveness and user friendliness demonstrate t

    Jan 1, 1989

  • SME-ICGCM
    Airbag Support for Ground Control in Thin Seam Coal Mining

    By Fan Shaogang

    In this paper, the airbags' structure and technical characteristics and its applications in China are described. Based on the practice of the airbags in mining thin seams, the effects on ground c

    Jan 1, 1997

  • SME-ICGCM
    An analysis of roof-pillar-weak floor interaction in partial extraction room-and-pillar mining

    By W. M. Pytel

    The applicability of the beam theory in analysis of roof- pillar-weak floor interaction in partial extraction room-and-pillar mining is presented. The mine structure is modeled as an equivalent multi-

    Jan 1, 1989

  • SME-ICGCM
    Finite element analysis and comparison of shaly mine roof support systems

    By K. F. Unrug

    In the paper a numerical modeling method is used for evaluation of a roof support system, which is commonly used in the US coal industry. The effectiveness of mechanical roof bolting with or without,

    Jan 1, 1989

  • SME-ICGCM
    Roof Control Problems on Development and Longwall Gateroads at a South- western PA Coal Mine

    By T. P. Mucho

    Over the past several years, two types of roof control problems have been en- countered at Beth Energy's Eighty Four Complex mine in Southwestern Pennsylvania. These problems have been (1) poor r

    Jan 1, 1986

  • SME-ICGCM
    Coal Mine Bumps: Case Histories of Analysis and Avoidance

    By David Newman

    In Eastern Kentucky, the Darby seam has had an extensive history of coal bumps and pillar bursts. The combination of high overburden, strong rock and coal, subjacent and superjacent mines, and retrea

    Jan 1, 2008

  • SME-ICGCM
    Mine-Wide Monitoring Applications In Ground Control Research

    By David Conover

    Technological advancements in electronic sensors and mine-wide monitoring systems have improved remote monitoring and analysis of underground mining information. The effective use of . these systems f

    Jan 1, 1990