Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Preliminary Design of the Caldecott Fourth Bore

    By Bhaskar B. Thapa, Michael T. McRae, Johannes V. Greunen

    This paper describes the preliminary design of the fourth bore of the Caldecott Tunnels along State Route 24 in Oakland, California. The paper focus is on two major aspects of the project: initial sup

    Jan 1, 2007

  • SME
    Trends in Availability of Aggregate

    By G. R. Robinson

    Aggregate resources consist of sand and gravel, and crushed stone. They are large-tonnage, bulk-minable mineral commodities that are used in construction and industrial activities (Tepordei, 1999, 20

    Jan 1, 2004

  • SME
    Floodplain Aggregate Mining in Western Oregon

    By E. F. Schnitzer

    During 1996 and 1997, Oregon experienced flooding on a scale not seen in many years. Some gravel pits located near rivers experienced erosion. In several cases, breaches occurred between the gravel p

    Jan 1, 1999

  • SME
    Evolving Soft-Ground Tunneling in Seattle

    By Leon Maday, Robert Robinson, Judy Cochran, Don Davis

    Over the past 20 years, several soft-ground tunnels have been successfully completed in the Seattle area. These tunnels were built using design-bid-build contracting methods, and have benefited from a

    Jan 1, 2005

  • SME
    Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, California

    By Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan

    Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E

    Jan 1, 2007

  • SME
    Means and Methods for Tunneling Through Highly Squeezing Ground: A Case History of the Strenger Tunnel, Austria

    By Günter Huber, Bruno Mattle, Helmut Westermayr, Daniel Spöndlin, Max John, Nejad Ayaydin

    PROJECT DESCRIPTION Alignment The Strenger Tunnel forms part of the S16 four-lane expressway between Landeckand Bludenz. The construction of this important East-West connection started in 1973

    Jan 1, 2005

  • SME
    Leaching Behavior of Lithium from Bauxite Residue Using Acetic Acid Mining, Metallurgy and Exploration (1c2dd284-40d8-467a-9f57-cf193eac1926)

    By Ning Wang, Tengfei Guo, Wanyan Li, Hanjie Wen, Hannian Gu, Zehai Li

    Bauxite residue (red mud) is an alkaline waste derived from the industrial process for extraction of alumina from bauxite ore. Some bauxite residues contain considerable concentrations of critical met

  • SME
    Strata Control

    By Christopher J. Bise

    INTRODUCTION Perhaps no other area reflects the art as well as the science of mining-engineering design quite as obviously as strata control. This is due to the fact that the design of mining stru

    Jan 1, 1986

  • SME
    Lyon–Turin Long and Deep Railway Tunnel Project

    By P. Fauvel, V. Nasri

    In January 2001, French and Italian governments signed an agreement for the construction of a new Lyon-Turin railway line. This project includes a tunnel of 53.1 km length and a maximum of 2500 m over

    Jan 1, 2005

  • SME
    A New Diatomite Resource In Egypt

    By M. I. Al-Wakeel

    Nile sediment was collected as a waste from one of the water treatment plants in Cairo, and subjected to petrographical investigation and granulometric, chemical, and mineralogical analyses. It was ex

    Jan 1, 2008

  • SME
    Engineering Geology and Cavern Design for New York City

    By Christopher Snee

    ??care has to be taken that the design is driven by sound geological reasoning and rigorous engineering logic rather than by the very attractive images that appear on the computer screen.??Hoek 1999

    Jan 1, 2008

  • SME
    Solutions To Reduce Blast-Induced Ore Loss & Dilution At Ahafo Gold Mine In Ghana

    By W. Rogers

    Blast-induced rock mass displacement can have a significant impact on ore loss & dilution. The mischaracterisation of the grade boundaries both prior to, as well as a result of blasting can lead to si

    Jan 1, 2012

  • SME
    Bleeder Entry Evaluation Using Condition Mapping and Numerical Modeling

    One of the most common critical areas of longwall mining in terms of ground stability are the gateroad and bleeder entries. These critical entries provide much-needed safe access for miners and allow

    Jan 7, 2020

  • SME
    Onsite Assembly And HARD Rock Tunneling At The Jinping-II Hydropower Station Power Tunnel Project

    By Stephen M. Smading

    Unique onsite assembly of a 12.43 m Main Beam TBM and back-up system was completed on September 18, 2008 in the remote mountains of the Sichuan province of China. The equipment was assembled onsite, w

  • SME
    Exploration Decision Analyses for the Brightwater Tunnels

    By L. Maday, V. J. Perrone, M. B. Gilbert

    INTRODUCTION The Brightwater conveyance system project in King County, Washington consists of constructing about 21 km (13 mile) of effluent and combined influent and effluent tunnels. The influen

    Jan 1, 2005

  • SME
    De Beers, Sandvik Team Up On Underground Automation

    De Beers? Finsch diamond mine began operation in the 1960s as a surface project using the latest technology available. During the 1990s, the operation, located about 160 km (100 miles) west of Kimber

    Jan 1, 2008

  • SME
    Development of a new method for quality control in the quarry industry for practicing sustainability

    By H. Tudeshki, A. Tayebi

    "The large extent of global production and consumption of aggregates from quarries, grabs one´s attention and makes its substantial and essential standpoint in the world today pretty clear. A great am

    Jan 1, 2011

  • SME
    3D CFD Simulation Of Airflow Re-Distribution And Associated Pressure Drops Inside The Overcast In Underground Coal Mines

    Overcasts are indispensible ventilation control devices to permit one airway to pass over another without mixing in room and pillar coal mining. The airflow distribution inside the overcast depends on

    Feb 27, 2013

  • SME
    Evaluation Of Dust Exposures Associated With Mist Drilling Technology For Roof Bolters

    By T. W. Beck

    Overexposure to respirable dust remains a widespread health hazard to roof bolter occupations in underground coal mines. Recently implemented mist drilling technology was evaluated for its effectivene

    Jan 1, 2008

  • SME
    Ventilation monitoring and control in mines

    By MAHESH SHRIWAS, CHRISTOPHER PRITCHARD

    Ventilation monitoring and control in mines are becoming an integral part of day-to-day activity for maintaining the health and safety of miners. This paper evaluates potential real-time monitoring so