Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Challenges of Drilling and Loading 30 and 48 Inch Poduction Blast Holes in a Unique Oilsands Environment

    By David P. Reddick

    "Suncor Inc. Oilsands Group mining operation in Northern Alberta, Canada, has been blasting to loosen the oilsands to increase production and decrease maintenance of the bucketwheel excavators for ove

    Jan 1, 1992

  • ISEE
    The Reliability of Peak Particle Velocity Analysis Methods

    By N. Powell, P. Hunt, A. Wetherelt

    This paper considers the current methods of analysis employed, the validity of assumptions made and the reliability of results and predictions derived; where appropriate, alternative methods are propo

    Jan 1, 2003

  • ISEE
    Blasting in the New Mellinnium: Safety and CredibilityA Recipe for Success

    By Steve Dillingham

    In every aspect of conduct, on the blast site or off, the issue of credibility is raised. Promises are made, commitments are satisfied, safe practices are obeyed, communication is maintained, and prov

    Jan 1, 2003

  • ISEE
    Swedish Standards for Ground Vibrations and Airblast

    By Roger Holmberg, Donald Jonson

    The Swedish Standard SS 460 48 66, “Vibration and shock - guidance levels for blasting induced vibration limits”, is based on more than 50 years of experience from blasting close to structures and tun

    Jan 1, 2005

  • ISEE
    Underground Bulk Loading Methods

    By Thomas C. Palangio

    Since the advent of explosives, people have been trying to mechanize the process of loading it into long, narrow holes. Automated loading frees manpower from the arduous task of charging granular, car

    Jan 1, 1990

  • ISEE
    Response of a High-Pressure Natural Gas Pipeline to Coal Mine Blasts

    By Ed Clah, Catherine Aimone-Martin

    The vibration response of a 30 in. diameter high-pressure (845 psi) natural gas pipeline to 11 coal mine blasts was measured. The X-52 steel pipeline was buried 7 ft. below the ground surface. Ground

    Jan 1, 2003

  • ISEE
    Highway Lane Rental Requirement Compromises Blast Site Safety and Security

    By Harry L. Siebert

    A major Arizona highway project is jeopardizing site safety and security because of the lane rental policy. One million cubic yards of rock must be fragmented to provide two additional lanes parallel

    Jan 1, 1997

  • ISEE
    Journal: Safety Talk / Determining The REAL Cost of An Accident

    By Mark Abernathy

    When most people think of a motor vehicle accident, the direct costs resulting from that accident, such as vehicle repair or towing charges, are generally easy to quantify. However, the indirect costs

    Jan 1, 2006

  • ISEE
    The Journal of Explosives Engineering Vol 21 No 3 - Dynamite Daze

    I was lucky to land a job in the powder business. I was looking for some way to support my wife and first child to be when I saw an ad in the Hercules magazine, “Explosives Engineer” for technical rep

    Jan 1, 2004

  • ISEE
    The Influence of Oxygen Content and Surroundings on the Heats of Explosion and Detonation of Organic Explosives

    By Edward Barrody

    There are wide variations in the values of heats of explosion and detonation as reported in literature. These values are not “stand-alone” or sole properties of the explosives. Specifications of the c

    Jan 1, 2003

  • ISEE
    Blasting in the New Mellinnium: The Salesmenship of Saying "No"!

    By Steve Dillingham

    The explosives business by nature is providing a specialized, valued service and associated products to a variety of customers whether mine, quarry or construction related. The level of performance de

    Jan 1, 2003

  • ISEE
    Energy Partion in Blastiong

    This paper is concerned with the blasting of rock in mining. The most common purpose of blasting rock is to cast it or to disrupt its structure sufficiently for effective digging and subsequent remova

    Jan 1, 1991

  • ISEE
    Journal: Make a Good Impression / Pre-blast Surveys

    By Sandra Penttinen

    There are several ways to get a positive reaction from neighbors to blasting projects. When you need to enter structures to conduct a pre-blast inspection, the impression you make on the structure own

    Jan 1, 2006

  • ISEE
    Recent Developments Relating to the Certification of Explosives for Sale in European Union Countries

    By D. Pickering, R. Wharton

    The deadline for meeting legal requirements relating to the sale of explosives in the European Union was 1 January 2003. The paper examines the range of materials that have already been certified by t

    Jan 1, 2003

  • ISEE
    Journal: Safety Talk / Regulatory Compliance - Transportation Compliance Challenges

    By Ann Barron

    “Hurry up” is the latest battle cry at explosives companies struggling to stay in compliance with the ever-growing onslaught of government regulations. The pressure continues to mount on industry prof

    Jan 1, 2006

  • ISEE
    A Definition of Criteria Required to Evaluate the Results of Production Blasts

    By Norm Tienkamp, Normand Martineau

    Through the normal course of operation, mine operators are living situations where blast results need to be measured. It becomes the supervisory group responsibility to select evaluation parameters wi

    Jan 1, 1996

  • ISEE
    Variations in Vibration Signals from Single Hole Quarry Blasts

    By Rob Farnfield, Yuill Gavin

    The rock blasting industry continues to be under pressure to reduce the level of vibration induced by the use of explosives. In recent years much research and development has been directed to minimizi

    Jan 1, 2001

  • ISEE
    Iron Ore Blast Designs and Cap Testing at the Minntac Mine

    By Jack Eloranta

    To improve control of blasting, tests were performed to assess non-electric cap accuracy. Simultaneous testing using a Velocity of Detonation Recorder (VODR), Red Lake Lo-Cam and an Instantel DS-677 b

    Jan 1, 1992

  • ISEE
    Post-Blast Cast Profile Shape Prediction at Large Coal Surface Mines

    By Paula Pereira

    The better the capability of accurately predicting the results of any process the less laborious and costly is the optimization or improvement of that process. Rock blasting is a process that one inte

    Jan 1, 2001

  • ISEE
    Experimental and Numerical Investigation of the Effects of Jointing on Fragmentation

    By Nikolaos Petropoulos, Changping Yi, Daniel Johansson, Håkan Schunnesson

    The effect of jointing on fragmentation by blasting was investigated experimentally and numerically. Firstly the experimental results were presented. Then the numerical modelling based on the experime

    Feb 1, 2020