  • DFI
    Challenge From Foundation Engineering To China ? Synopsis

    By R. L. Xu

    In this paper, the author would like to point out with figures that the building industry is one of the key industrial sectors of the national economy in China. And in the coming 15 years, the output

    Jan 1, 2010

  • DFI
    Settlement Of A Building After Cutting Off Pile Tips Due To Tunnelling

    By Richard A. Forth

    During the construction of the Island Line (ISL) in Hong Kong between 1982 and 1986 piled foundations of a building were encountered in a tunnel drive. As the tunnel alignment could not be changed wor

    Jan 1, 2002

  • DFI
    Challenges Associated with the Construction of a Cofferdam – A Case Study

    By Eric S. White, Thomas J. Sabourin, Khuram R. Mohib

    "This paper presents the challenges associated with the design and construction of a steel sheet pile cofferdam supported with one level of grouted anchors in clean to silty sand with gravel. The init

    Jan 1, 2017

  • DFI
    Apportioning Risks On An Urban Deep Foundation Project

    By Michael P. Balducci

    Urban deep foundation projects contain unique risks that must be recognized by the parties involved. Common pitfalls must be recognized and avoided or addressed through contractual relations and corr

    Jan 1, 2008

  • DFI
    Design Of Deep Foundations Over Shallow Mine Workings

    By Tianfei Liao

    Extensive site investigations revealed that abandoned shallow mine workings exist under a site planned for construction of a major new facility. Since the mine voids were susceptible to collapse, they

    Jan 1, 2009

  • DFI
    Use of CSM to Support a Heritage Building

    By Chris G. Leach

    "Abstract A seven storey Northbridge area of Perth, Western Australia presented residential apartment complex located in the an opportunity for a novel application of Cutter Soil Mix technology (CSM).

    Jan 1, 2014

  • DFI
    Analysis of Plugging Effect for Open-Ended Piles in Sandy Soil

    By Sangseom Jeong, Moonkyung Chung, Junyoung Ko

    "Abstract The plugging effect of open-ended piles in sandy soil is analyzed by full-scale field test and plugging measurement. PLR (plug length ratio) measurement data from 144 field cases are analyze

    Jan 1, 2014

  • DFI
    Use of Porous Concrete in Secant Bored Pile Walls

    By Matthias Pulsfort, Markus Herten, Rolf Breitenbücher, Claudia Fierenkothen

    "Secant bored pile walls are frequently used as retaining walls in watertight excavations to cut off ground water aquifers and are subsequently exposed to ground water pressure loading in addition to

    Jan 1, 2017

  • DFI
    Large Diameter Drilling Operations Of Multi Head Down The Hole Hammer Drill Through Boulders And Granite - Mach Drilling System And Some Construction Examples

    By J. Nakayama

    Construction of foundation piles or diaphragm walls through rocky or boulder containing formations has been long-standing difficulty. It has been widely understood that the down-the-hole hammer is t

    Jan 1, 1989

  • DFI
    Reinforcement Project For The Shopping Centre "Grand Littoral" In Marseilles

    By J. -M. Rescoussier

    Due to Important settlements inducing major structural damages, the western part of the Grand Littoral shopping centre has been closed in 1997. The present paper describes the project of underpinnin

    Jan 1, 2002

  • DFI
    Conventional Static And Rapid Load Tests On CIDH Piers At A University Of California Berkeley Site

    By Gyimah Kasali

    Rapid Load Testing was performed as part of an extensive drilled pier testing program for the University of California Berkeley Capital Improvement Program. The purpose of the program was to: (1)

    Jan 1, 2002

  • DFI
    Design Of The Marine Foundation For The Skyway Project Of The San Francisco Oakland Bay Bridge

    By Gerry Houlahan

    The east span of the 3.5 km long SF-Oakland Bay Bridge is supported by different types of foundations along its span. Starting from the west, its first 460 m section comprising twin concrete box-girde

    Jan 1, 2005

  • DFI
    Developing Effective Specifications For Tremie-Concrete Placement In Drilled Shafts

    By Giuliana A. Zelada-Tumialan

    Reduced workability and flowability of the concrete through the tremie tubes and drilled shaft reinforcement have been identified as the main causes of tremie-concrete drilled shaft concrete defects.

    Jan 1, 2009

  • DFI
    Mt. Baker Ridge Access Pits And Seattle Bus Tunnel Jet Grouted Piles

    By John F. MacDonald

    From 19BS thru the present, Guy F. Atkinson Construction Company has been involved in several transportation construction projects in the Seattle area. Two of these contracts, the Mt. Baker Ridge Tunn

    Jan 1, 1990

  • DFI
    "Underpinning By Jet Grouting" - Summary

    By George K. Burke

    Underpinning of a structure has been traditionally expensive, time consuming, and, in many cases, caused as much settlement to the existing structure as it was trying to prevent. As underpinning is no

    Jan 1, 1991

  • DFI
    Sheetpile Wall System With Tiebacks In A Soft Clay Profile - Description - A. Alignment Description

    By Jean J. Abiassi

    The Boston Marine Industrial Park (BMIP) VENT 6 project is a cut and cover tunnel, part of the Central Artery / Tunnel (CA/T) in the city of Boston. The BMIP job will serve as the south approach t

    Jan 1, 1994

  • DFI
    Pile Load Testing At JFK International Airport - Synopsis

    By J. Moskowitz

    Construction of the new JFK International Airport Light Rail System (LRS) began in 1998 with a pre-construction load test program. This $1.2 billion design-build project consists of approximately 13 k

    Jan 1, 2000

  • DFI
    Interpreted Residual Load In An Augered Cast-In-Place Pile

    By Timothy C. Siegel

    Accurate representation of the geotechnical resistance distribution is critical in evaluating the performance of piles and pile groups for design. A current practice is to infer the geotechnical resi

    Jan 1, 2009

  • DFI
    Design and Construction of the Summit Senior Care Facility into the Side of an Unstable California Hillside

    By Patrick O. Shires, Harry W. Schnabel

    With stable building sites becoming scarce in the greater San Francisco Bay Area, the new Summit Senior Care Facility is being built into the side of an unstable hillside adjacent to the San Ramon Reg

    Jan 1, 2018

  • DFI
    In Situ Soil Mixing Concepts Explained; Myths Dispelled - What Is Soil Mixing?

    By Richard W. Hanford

    The geotechnical construction industry generally considers soil mixing to be defined as an in situ ground improvement or treatment method by which a dry or wet reagent is introduced into the ground an

    Jan 1, 2001