    Behavior Of Piled Raft Foundation Systems Under A Combined Set Of Loadings

    By Renato P. Cunha

    The paper explores a parametric analysis of a four-pile group in contact (hence piled raft) and without contact (hence standard pile group) with the superficial soil layer, under a combined set of loa

    Jan 1, 2006

  • DFI
    A Case Study Of A Vibratory Pile Installation Monitoring Of A Precast Prestressed Concrete Pile

    By K. Viking

    It's well known that conventional impact hammers, usually are the method to use in order to drive precast prestressed concrete piles. However sometimes the vibratory technique might be considered

    Jan 1, 2004

  • DFI
    Installation And Testing Of 260 Hollow Core Bar Micropiles

    By Jesús E. Gómez

    A total of 260 micropiles were installed as part of a retrofit effort for two existing bridges. The micropiles consisted of hollow core bars installed under limited headroom conditions. Of the total n

    Jan 1, 2007

  • DFI
    Toward A Unified Design Standard For Steel Sheet Piling

    By Michael J. Garlich

    Steel sheet piling has a long history of use in a variety of permanent and temporary structures. Current engineering practice uses numerous publications and standards for design guidance. U.S. desig

    Jan 1, 2008

  • DFI
    Performance Of Cast-In-Place Piles Installed With A Fixed Mast Drilling Platform In Claystone ? Glenrock WY

    By Brent Wilkins

    The project team was tasked with the design and installation of a deep foundation system to support an expansion to a power generating station in Glenrock WY. Cast-in-place piles installed by a fixed

    Jan 1, 2009

  • DFI
    New Tacoma Narrows Bridge Caissons

    By R. Bruce Patterson

    The New Tacoma Narrows Bridge is a classic suspension bridge founded on concrete caissons. Caisson construction was complicated by the proximity of the existing bridge piers, only sixty feet away. H

    Jan 1, 2013

  • DFI
    Open Well Caissons Of A 1917 Railroad Bridge: How 19th Century Construction Can Influence 21st Century Construction

    By Alan D. Fisher

    Amtrak made a decision to replace an aging bascule bridge with a vertical lift bridge for their crossing of the Thames River in New London, Connecticut. The new lift bridge occupies the same alignmen

    Jan 1, 2013

  • DFI
    Large Diameter Shafts - Youghiogheny Reservoir Bridge (bd308ba5-80e5-464e-8005-1856048b892f)

    By Paul J. Lewis

    Estimation of the axial side shear resistance of drilled shaft rock sockets is directly related to the unconfined compressive strength of the bedrock. Commonly, the mean unconfined compressive strengt

    Jan 1, 2013

  • DFI
    Broadway Viaduct Design Phase Load Test Program For Post Grouted Shafts

    By Mike Muchard

    A design phase load test program was performed at the Broadway Viaduct bridge site to evaluate load carrying capacity and constructability of post grouted drilled shafts. The program included construc

    Jan 1, 2009

  • DFI
    Comprehensive QA/QC Integrity Testing Using Thermal Integrity Profiler

    By Brad W. Taylor

    "During the past several months, I have introduced to civil and structural engineers an innovative solution for the integrity testing of concrete using the Thermal Integrity Profiler (TIP) Wire Cable

    Jan 1, 2017

  • DFI
    Augercast Piles - History And Advancements

    By Larry Rayburn

    Augercast piles evolved in the late forties from the process of pressure grouting open holes backfilled with stone. In 1956, a patent was issued for a cast in situ pile by pumping high pressure grout

    Jan 1, 2005

  • DFI
    Presentation #2 - Non-Destructive Testing For Drilled Shafts - Contents

    By Frank Rausche

    Introduction and Background Testing -Pile Preparation -Data Processing -Data Interpretation/Case Studies Case Studies - Existing Piles Stories from around the world

    Jan 1, 2001

  • DFI
    An Innovative Use Of Bored Tension Piles In Embedded Retaining Wall Design & Construction

    By Abid O. Adekunte

    The design, construction and monitoring of the deep excavation support for the basement of a large-scale commercial development in Cavan, Ireland is presented. Excavation area was adjacent to existing

    Jan 1, 2008

  • DFI
    Evolving Micropiles: Optimizing Foundations For Seismic Retrofit

    By Rob Jameson

    Micropiles are ideally suited to seismic retrofit applications. Their high tensile and compressive capacity can sustain the large concentrated loads induced during seismic events. Micropiles can be

    Jan 1, 2008

  • DFI
    King?s Cross Station Re-Development Passive And Active Mitigation Of Tunnelling - Induced Settlement

    By Clif Kettle

    The paper will detail the design and execution of passive and active settlement control measures, the means adopted to overcome the various physical and operational constraints, and to meet specified

    Jan 1, 2008

  • DFI
    Understanding The Vibratory Pile Driver/Extractor: A Field Man's Perspective - 1. What Is A Vibro Driver/Extractor And How Does It Work?

    By John L. White

    The vibro driver/extractor is a machine that grips to a pile and vibrates it up and down. When the vibrating pile is lowered into the ground, all soil around the pile begins to vibrate. A vibrating pi

    Jan 1, 1990

  • DFI
    Bridge Pier Remediation, New London CT

    By Walter Kaeck

    In a recent upgrade of their system, Amtrak converted a bascule type draw bridge over the Thames River to a vertical lift structure supported by the existing piers. During the bridge replacement, sign

    Jan 1, 2009

  • DFI
    Contactless Anchor Measurement with Elastomagnetic Sensors

    By Damir Dedic, Wörle. Patrick

    "Soil properties within a construction project area are analyzed during the planning phase. However, it is only possible to achieve selective soil exploration, even in the case of very extensive inves

    Jan 1, 2017

  • DFI
    Application of Non-Destructive Testing to Drilled Shafts

    Technically speaking, the concept of NDT sounds like the "magic bullet" when faced with a questionable drilled shaft. All the Contractor or Engineer needs to do is select an NDT method, apply it, unde

    Jan 1, 2004

  • DFI
    New CIGMAT Downhole Penetrometer (DHP-CIGMAT) for Use During Drilled Shaft Construction (7493fc91-7396-4eac-bed2-0406570252cc)

    By Omer F. Usluogullari, C. Vipulanandan

    "It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increa