    Development of the Rainy River Gold Project and Processing Plant

    By Paolo Toscano, Dave Hall

    "This paper discusses the project history, process design and layout of the Rainy River Gold Project mill. The circuit consists of a 55 x 83 primary crusher, 15 MW SAG mill and 15 MW ball mill. Both m

    Jan 1, 2016

  • CIM
    Experimental and Numerical Investigations of the Fluid Flow in a Hydrocyclone in the Absence of an Air Core

    By J. R. Kadambi, E. Kucukal, J. Furlan

    "Hydrocyclone separators are used in various industrial applications, including mining milling and tailings systems, in order to separate or classify solid particles and liquid droplets from multiphas

    Jan 1, 2016

  • CIM
    Managing Pit Slope Displacements: Highland Valley Copper?s Lornex Pit Southwest Wall

    By H. Warren Newcomen

    The southwest wall of the Lornex Pit at the Highland Valley Copper mine has been experiencing slope displacements since 1978. Measures to manage the displacements on previous pushbacks have included s

    May 1, 2002

  • CIM
    Some Current Ideas on Saving Energy in Milling Operations

    By I. R. Ward

    "The need for energy conservation has been of increasing concern since the early 1970's, when the cost of petroleum based energy began to escalate rapidly and security of supply became uncertain. The

    Jan 1, 1981

  • CIM
    The Knob Lake Iron Ore Deposits

    By R. D. Westervelt

    IN JULY 1954, the first iron ore from the deposits in the Knob Lake vicinity was mined and shipped to Seven Islands. The beginning of the production may well be the greatest advance in Canadian econom

    Jan 1, 1957

  • CIM
    An investigation on minimizing reagent consumption in ammonium thiosulphate gold leaching

    By Chen Xia, G. Deschenes, Wan-Tai Yen

    "Ammonium thiosulphate is a potential replacement for the cyanide in gold leaching. However, the high reagent consumption hinders its practical applications. In order to reduce the thiosulphate consum

    Jan 1, 2002

  • CIM
    “Over the Hills and Far Away” Long Distance Slurry Pipelines in Mountainous Regions

    By Donald J. Hallbom

    "While pipeline hydrotransport is often the most economical way to transport large volumes of mineral concentrate, tailings, or fine ore slurry over long distances, it is in mountainous terrain that p

    Jan 1, 2006

  • CIM
    Maintenance

    By Peter C. Jones

    The paper gives a broad view of the maintenance procedures at the Cassiar Asbestos Corporation property. Comparisons are drawn to indicate the changes in facilities and approach that have evolved over

    Jan 1, 1978

  • CIM
    Experiences with a New Generation Automated Long Hole Drilling Rigs at LKAB Kiruna Mine in Northern Sweden

    By Patrik Ericsson

    During the 90?s Atlas Copco and LKAB developed a pioneering fully automatic long hole production drilling system based on the Atlas Copco Simba W469 drill rigs. These drill rigs have since then drille

    May 1, 2007

  • CIM
    Reducing Mercury Production at Bald Mountain Gold Mine

    By Jim Wickens, Vince Lofftus, Mark Kravetz

    "This paper discusses how Bald Mountain Gold Mine (Ely, NV) dramatically reduced mercury production by treating process solutions with a liquid reagent based on organic sulfide chemistry. Cherokee Che

    Jan 1, 2001

  • CIM
    Calibration of On-Stream X-Ray Analyzers

    By Jim Lauder, Russ Calow, Ken Maley, Michael Ounpuu, Stuart T. Caverly

    "Stuart T. Caverly, Section Head XRF Laboratory, Jim Lauder, Systems Engineer, Russ Stuart T. Caverly, Section Head XRF Laboratory, Jim Lauder, Systems Engineer, Russ Concession Street, Lakefield, Ont

    Jan 1, 1996

  • CIM
    A Commodity Cycle ? Where Are We?

    By David D. Davidson

    Commodities remain hot for the time being, but for how much longer? The bulls point to global economic growth lead by China?s insatiable demand for raw materials. To further emphasis the bullish view

    Apr 1, 2005

  • CIM
    Measurements of deformation and stress variations in mine pillars

    By A. P. Bois, K. Saleh, A. Ghorbal, V. Hajiabdolmajid, G. Ballivy

    "The knowledge of the initial stress field is not always sufficient to ensure the stability of mining stopes due to the high-stress variations generated by mining. Monitoring of these openings is then

    Jan 1, 2003

  • CIM
    Re-entry Protocols for Seismically Active Mines: An Update

    By J. A. Vallejos

    Re-entry protocols are a tactical approach for controlling risk after blasts or large events in seismically active mines. Based on the results of a survey on 18 seismically active mines, mostly in Ont

    May 1, 2009

  • CIM
    Classification System Upgrades in HVC Primary Mill Grinding Circuits – Hybrid Cavex Cyclone Testing and Installation

    By Rob Sloan, Simon Yu, Rob Robison, Mark Schmidt

    "In 2000-2009, Highland Valley Copper (HVC) tested new generation 660 mm cyclones supplied by various manufacturers in an aim to replace existing first generation 762 mm cyclones without success. Due

    Jan 1, 2013

  • CIM
    CO Oxidation Activity and Temperature-Programmed Reduction Study of Au/CuZnOx Catalysts

    By Stephen J. Roberts

    Gold catalysts were prepared on co-precipitated, calcined copper oxide - zinc oxide support by an inverse deposition-precipitation method. These catalysts were characterised by X-ray diffraction (XRD)

    Oct 1, 2003

  • CIM
    Metallurgical mapping of the San Nicolas deposit

    By A. H. Winckers

    "The San Nicolás deposit is a complex fine grained polymetallic volcanogenic massive sulphide deposit located in central Mexico.Metallurgical testwork was carried out in 1999 and 2000 to develop a flo

    Jan 1, 2002

  • CIM
    Multiple Feeder Control

    By André Vien, Pedro Gonzalez, Julio Palomino, Rob Perry

    "In many mineral processing plants ore is reclaimed from a stockpile using multiple feeders. The discharge from these feeders is combined onto a single conveyor from which total tonnage is measured. T

    Jan 1, 2000

  • CIM
    Was that Locked Cycle Test Any Good?

    By Mike Ounpuu

    "Locked cycle testing has become more common practice in the last 10 years. Reasons vary from a desire to avoid pilot plant testing, demand for more variability testing within deposits, and perhaps mo

    Jan 1, 2001

  • CIM
    Management, Operational and Cost Controls at Denison Mines Limited, Uranium Division

    By M. J. deBastiani

    The uranium producing division of Denison Mines Limited operates a 6,000-ton-per-day integrated mining unit in the Algoma area of Ontario. The property is located approximately one and one-half miles

    Jan 1, 1963