Organic Management Structure – Its Advantages in a Mining ConsultancyBy G Pitkin, D Sorley
The purpose of any consultancy is to provide a superior service for their client. Organisational structure is a key element in providing this service and differentiating between consultants.In an orga
Jun 22, 2016
-
Quantifying the quality of cable bolt installation by acoustic testingBy M Hawkes, Z Ji Gang, Z Ming, R Hassell
As underground mines become more geotechnically challenging with increasing depth and excavation size, the requirement for ground support to be installed as per design becomes more critical. The verif
Mar 15, 2021
-
30 years of seismic system design, implementation and interpretationBy J Player, G Sweby, S Webber, E Jones
Seismic systems are a tool for the monitoring and forecasting the rock mass response to excavation. Common issues encountered at mine site audits and reviews are: how to design an effective seismic sy
Nov 29, 2022
-
Tunnel Boring Machine Usage Speeds up Development at Stillwater MineBy D Willis, A Shanahan, C Jacobs, T Luxner
The application of tunnel boring machines (TBM) for reef mining is a unique practice with benefits over current mining methods given the right geology and geometry of the orebody. The Stillwater Minin
Sep 17, 2014
-
Mt Isa copper concentrator cleaner circuit redesignBy P Radulovic, V Lawson, M Muller, J Wallace
The Mount Isa Copper Concentrator was commissioned in 1973. Since commissioning some significant upgrades have been undertaken such as: • the replacement of the rod mill/ball mill circuit with AG mill
Sep 11, 2017
-
The application of critical chain project management to sublevel open stoping at Olympic DamBy J Light
Since 2019, the mine planning team at Olympic Dam has been establishing and maturing a shift from deterministic to probabilistic scheduling techniques. This paper outlines this journey undertaken by t
Mar 29, 2023
-
Getting underground: design and construction of a portal in a pit with moving wallsBy J Player, P Evans, G Sweby
Achieving quick underground access after the completion of an open pit mine can be critical to maintaining project value and ensuring regular ore feed to the mill. This paper outlines the design and c
Mar 15, 2021
-
Greater Use of Geoscan On-belt Analysis for Process Control at Sepon Copper OperationBy T D. Jolly, L A. Balzan, A R. Harris, Z Bauk
"The availability of real-time data in any process control system is critical for effective management of that system. At MMG LXML Sepon Copper Operation in Lao PDR, controlling the copper grade of th
Oct 10, 2016
-
What the Internet of Things Means to MiningBy D Kent, D Eisner
A lot of talk has been generated about the so called ‘Internet of Things’ (IoT) and its potential to transform the way we interact with our homes and devices. But the true potential and value of IoT i
Nov 4, 2015
-
Grinding Circuit Improvements at Evolution Mining’s Edna May OperationBy D Atheis, S Williams, A Dance, D Taplin
"Resurrected from its former life at the Big Bell operation, the grinding circuit at Evolution Mining’s Edna May operation in Western Australia has many a story to tell. The task of optimising a plant
Sep 1, 2014
-
Optimisation of the Peak Gold Mine’s Processing Plant through Advanced Process ControlBy J Hartog, V Beehan, D Beeson
Treating an ore blend from five different deposits at Newgold’s Peak Gold Mine (PGM) has always been a challenge due to the inherent variability between each of the orebodies.Operating the processing
Sep 1, 2014
-
Production Variance Benchmarks and Their Use in Project Evaluation and Due Diligence"Cash flow modelling during project evaluation is enhanced when probabilistic methods are applied to the inputs. One of the important inputs is the quarterly production profile. Typically, the steady-
Mar 8, 2016
-
Unlocking mine productivity by changing-the-equation on the where, what and when of orebody characterisationBy S Warden, T Neville, P Leckie
At its simplest, the classification and characterisation of an orebody is a matter of Where, What and When. Where and with what spatial resolution are measurements taken, What properties are measured,
Sep 1, 2024
-
In situ dynamic testing of mesh straps and W-strapsBy P Mikula, B Darlington, J Graham, P Young
In underground mines experiencing dynamic events, there is an ever-present challenge to design and maintain a capable ground support system. One key component of ground support systems is surface supp
Nov 29, 2022
-
Making use of potentially contaminating mine waste in cover designBy N Jamson, T K. Rohde
The Mine is an underground zinc (Zn), lead (Pb) and silver (Ag) operation in central New South Wales (NSW). Broadly speaking the Mine has two domains that require rehabilitation, the mine industrial a
Jul 23, 2018
-
Are there differences in size distribution when comparing conventional crushing and HPGR?By I Ritchie, G Lane, C Morley, D Yataco
Marcobre SAC (Marcobre) is developing the Mina Justa project in Peru. The project has a lower grade oxide orebody overlaying the higher grade sulfide orebody. The oxide ore is treated by acid leaching
Sep 11, 2017
-
Iron Ore Washing – Achieve More with Fewer ResourcesBy M Zlatev, S Silge
Producers of primary resources such as iron ore face the challenge of processing crude materials with increasing levels of impurities, which may result in the requirement for wet processing. This resu
Jul 13, 2015
-
Controlling Blast Related Fumes with Unconventional ExplosivesBy J Rock, K Bambrook
"Hanwha Mining Services was approached by Glencore Coal to provide a series of (trial) demonstration blasts at its Clermont coalmine. The intent of the project was to trial a bulk explosive product th
Nov 15, 2016
-
Incorporation of a Full Process Plant Model as an Active Constraint for Mine Planning and Production SchedulingBy P Cesare, S Munro, D Wandel, R A. Bearman
Consideration of the processing plant operational envelope is a key factor in production scheduling,and therefore mine planning, for any mining operation. In many cases hard-wired or regressionbased t
Nov 24, 2014
-
MMG Century Mine, A Case Study – Maximising Project Net Present Value Through Targeted Capital Expenditure and Process Optimisation Against a Backdrop of Falling Metal Prices and Feed GradesBy R Wynn, T J. Akroyd, C Costa
In an environment of lower zinc prices, falling revenues and reducing zinc feed grades, Century mine implemented a fast-tracked capital upgrade program in less than 15 months. The program was designed
Sep 1, 2014