Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The critical pool levels for the Yallourn Mine determined using the MGRI

    By J Butler, N Patel, S Narendranathan, S Rastogi

    The Yallourn Mine (YM) commenced mining of brown coal in the 1920s under operation by the State Electricity Commission of Victoria (SECV), prior to it becoming privatised in 1996. The present owners o

    Aug 2, 2023

  • AUSIMM
    Investigation and Construction of Tunnels in Tamalia Limestone, Perth, Western Australia

    By Klenowski G, Gilmour G. A

    The Metropolitan Water Supply, Sewerage and Drainage Board, Perth, has recently con- structed two major sewerage tunnels in the metropolitan area and a further one is under construction. These tunne

    Jan 1, 1981

  • AUSIMM
    Development of Robot System for Automatic Assembling of Bolted Segments

    By Harada M, Katsuta S

    In order to shorten the time taken to com- plete shield tunnel excavation work, reduce labor costs and to improve safety, an automatic assembly robot system for the segments used has been developed

    Jan 1, 1987

  • AUSIMM
    An approach for evaluating a liberation function

    By Massacci P

    A review has been made of the studies focusing on methods for the description of grain -size distribution after breakage and, separa- tely, of the degree of liberation of the miner- al species makin

    Jan 1, 1986

  • AUSIMM
    Belt Conveyor Transport Systems

    The demands of the economy require larger manufacturing facilities using greater quantit- ies of raw materials which must be mined, handl- ed, stockpiled and recovered with efficiency and dependabili

    Jan 1, 1976

  • AUSIMM
    The Lochiel Trial Pit Design and Excavation

    By Sullivan T. D

    The Lochiel Deposit is a large occurrence of soft brown coal about 130 km north of Adelaide. The deposit is undergoing continued evalua- tion of which an integral part was the excavation of a Trial P

    Jan 1, 1988

  • AUSIMM
    Initiating-Systems for Underground Mass Firings Using Large Diameter Blastholes

    By Rashleigh C

    The selection and application of an effect- ive firing system first require a clear under- standing of the initiating abilities of the com- ponents in such systems. The conditions under which charges

    Jan 1, 1978

  • AUSIMM
    Open Strip Pitwall Instability at Goonyella Mine-Causes and Effects

    By Richards BG, Komdeur W

    Instability in spoil piles and in high wall slopes in natural overburden has been ex- perienced at Utah's Goonyella Mine since com- mencement of operations in early 1971. Annual production target

    Jan 1, 1978

  • AUSIMM
    Machine learning at a gold-silver mine: a case study from the Ban Houayxai Gold-Silver Operation

    By P Stewart, S Cowie, A Offer, J Carpenter, E Jones

    The Ban Houayxai Gold-Silver Operation is a producing asset for Australian-based copper and gold producer, PanAust Limited. The Operation lies within PanAust’s 2600 square-kilometre Phu Bia Contract A

    Nov 21, 2018

  • AUSIMM
    Enhanced fine particle recovery with the Concorde Cell

    By P G. Bourke, A Yáñez, G J. Jameson, N M. L Kupka

    The kinetics of fine and ultrafine particles in conventional mechanical flotation cells are limited (Feng and Aldrich, 1999; Trahar, 1981; Wang et al, 2016). Accordingly, even limited recoveries with

    Aug 24, 2022

  • AUSIMM
    Choice of Electric Driving System for Mining Equipment

    The author presents various procedures for the choice of dri-ving systems for mining, including the method of indeterminate Lagrange factors and linear programming.The possible application of the poin

    Jan 1, 1985

  • AUSIMM
    A ‘no tailings dam future’ – preconcentration strategies ‘down the sizes and across the value chain’

    By P Revell, B Adair, D King, L Keeney

    Grade Engineering®, integrated across the mine value chain, has a pivotal role to play in achieving step change reductions in energy and water usage in mine operations. High levels of gangue rejection

    Nov 10, 2020

  • AUSIMM
    Field Trials of the Mobile Miner MM130 at Broken Hill

    The Mobile Miner MM130 was delivered to Broken Hill in February 1992. During March the machine was extensively trialled on the surface to test manoeuvrability, climbing ability and muck handling pri

    Jan 1, 1993

  • AUSIMM
    The Application of Value Engineering Principles to Mining Studies

    By T Schrimpf, I Bryan

    The life cycle of a mining project begins with initial regional exploration and ends with mine closure and rehabilitation. Between resource definition and the commencement of mine construction is the

    May 24, 2012

  • AUSIMM
    The underdog mechanical alternative for tailings dewatering: the screw press

    By S Whitton, W Wimmler, L Wimmler

    “Given the increasing scrutiny of the mining industry and its relatively poor record with regards to mine tailings management, increased requirements to minimise water usage (often accompanied by very

    Jul 1, 2021

  • AUSIMM
    Value Creation Through Sampling of a Gold Ore

    By S Cossfo Torres

    Minera PenmontÆs gold mine, La Herradura, is located at the northwestern Mexican state of Sonora and consists of an open pit mine and heap leaching facility for the recovery of gold. The production be

    Jan 1, 2008

  • AUSIMM
    A Numerical Model to Simulate the Effectiveness of Remedial Measures Aimed at Reducing Acidity and Metal Concentrations in the Ngakawau River and its Tributaries Near Stockton Coal Mine, West Coast, New Zealand

    By P Lindsay

    A numerical model has been developed to simulate the effectiveness and costs of a number of conceptual remedial measures aimed at reducing acidity and metal concentrations in the Ngakawau River and it

    Jan 1, 2006

  • AUSIMM
    Conclusions from long-term cover system performance monitoring – a case study

    By R Barritt

    Remedial options for a waste rock dump (WRD) were considered as part of closure planning studies at an active mine in Western Australia. To minimise the impact of any seepage from the landform it was

    Jul 25, 2018

  • AUSIMM
    Diversion decision making with an integrated approach to design for operations and mine closure

    By M Rafty, A Markham, S Atkinson

    Australia contains some of the most productive mining areas and is characterised by ancient landscapes and highly variable hydrology. Historical mining of iron ore, coal and other minerals has targete

    Jul 25, 2018

  • AUSIMM
    Using an undisturbed landform to calibrate long-term predictions of the evolution of a rehabilitated landform

    By G R. Hancock, M J. Saynor, J B. C Lowry, K G. Evans, M Narayan

    Tools such as landform evolution models (LEMs) provide a means of predicting how a landform may evolve over extended periods of time. Here, we utilise the CAESAR-Lisflood LEM to assess a proposed reha

    Jul 25, 2018