Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Simple Technique for Using High Energy in Blasting

    By S J. Hawke, L A. Dominguez

    In non-ferrous metal mining operations, it is generally necessary to crush and grind the ore to a very fine particle size to effectively liberate the contained mineral from the host rock. Fragmentatio

    Aug 24, 2015

  • AUSIMM
    Tunnelling on Northern Beaches Storage Project, Sydney, to Improve Water Quality

    By N Taylor, P Hewitt

    The Northern Beaches Storage Project (NBSP) is part of Sydney Water’s SewerFix™ Program to improve the wastewater system and protect public health and the environment. It was built by the SewerFix Wet

    Sep 17, 2014

  • AUSIMM
    Ventilation Upgrade at the FrogÆs Leg Mine - Case Study

    By A Llewellyn, M Varvari

    The ventilation circuit at the FrogÆs Leg Mine was originally designed to permit mining to progress down to 440 m below surface at a maximum production rate of 500 kt/a, as per the feasibility study.

    Jul 1, 2013

  • AUSIMM
    Modern mining – why bandwidth matters

    By D Kent

    "There has been a revolution occurring in underground mining over the last several years, where big headline items such as the Internet of Things (IoT), optimisation, managing data, data mining etc –

    Oct 16, 2017

  • AUSIMM
    Numerical Analysis of Extreme Deformation and Ground Support Performance at the N3500 Project

    The N3500 orebody is the northern continuation of the 3500 orebody at Xstrata Copper's Enterprise Mine and occurs at a depth of 1.3 to 1.8 km. At the nearby S3500 orebody, extreme deformation was

    Nov 25, 2010

  • AUSIMM
    Parametric assessment of tailings liquefaction and earthquake induced embankment deformations using FLAC

    By B Ghahreman‐Nejad, M Munro

    Design of embankment dams often requires seismic analyses, or an assessment of earthquakeinduced ground and dam movements. There are a large number of cases where earthquakes have triggered sliding an

    Jul 1, 2021

  • AUSIMM
    Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)

    By D Horacek, I K. Sheppard

    Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in

    Jan 1, 2007

  • AUSIMM
    Data cross validation for a newly commissioned dynamic drop test facility

    By D W. Evans

    Research into the dynamic properties of ground support elements continues to grow at a global level, given the increasing importance of this field of application within underground hard rock mining. M

    Nov 29, 2022

  • AUSIMM
    Real time phosphorus analysis using GEOSCAN on belt analysers at Assmang Khumani Mine in the Northern Cape

    By L A. Balzan, F Nieuwenhuys

    GEOSCAN on belt analysers have been widely utilised in iron ore for nearly two decades. Since the first installations in 2003, the availability of accurate and reliable grade data has become standardi

    Nov 8, 2021

  • AUSIMM
    Design and Construction of the Access Tunnels for the New Top Ryde City Shopping Centre, Northern Sydney

    By Q Yang

    This paper describes the design and construction of three 7.2 m span access ramp-tunnels to the three level underground car park of the newly redeveloped Top Ryde City Shopping Centre in northern Sydn

    Mar 8, 2011

  • AUSIMM
    Float it, Clean it, Depress it – Consolidating the Separation Stages at Clarabelle Mill

    By V Lawson

    Vale’s Sudbury Clarabelle Mill processes Cu/Ni ores from a number of mines in the Sudbury basin in Ontario, Canada. Bulk sulphide flotation produces a copper-nickel concentrate with pyrrhotite as the

    Aug 8, 2011

  • AUSIMM
    Simulation Aided Engineering – Integration of Monitoring, Modelling and Planning

    By D Beck

    Open access to forecasts of mine geotechnical performance in the form of open databases of model results has been considered risky in the past, with a concern that the results will not be understood o

    Mar 21, 2011

  • AUSIMM
    Open Pit to Underground ù Transition and Interaction

    By P J. Terbrugge

    Many ore deposits have considerable vertical extent which is not always known at the time of commencement of mining. In many of these cases, initial mining is by opencast methods, and as ore reserves

    Jan 1, 2000

  • AUSIMM
    Open Issues in Tunnel Boring Machine Excavation of Deep Tunnels

    By G Barla

    In Europe, a major interest in the infrastructure and tunnelling fields is in the new crossings of Alps in the form of base tunnels, which are important components of the high-speed (for passengers)/h

    Mar 8, 2011

  • AUSIMM
    Bauxite Deposits of the Kimberley, Western Australia

    By Zani J. A, Jackson W. D

    Bauxite was discovered in the Kimberley in 1965 by an Amax field crew. Reserves of 230 million tons, of bauxite. averaging 47% total alumina on Mitchell Plateau and 980 million tons averaging 36%

    Jan 1, 1973

  • AUSIMM
    Characterisation of Gold Ore from the Nick O’Time Shoot (Tarnagulla, Australia) Using High Resolution X-ray Computed Tomography

    By I M. Platten, Y Xie, B W. Cuffley, S C. Dominy

    "Geometallurgical programs require the collection of representative samples for geochemical, mineralogical and metallurgical test work. Such protocols must be designed to suit the style of orebody in

    Jun 15, 2016

  • AUSIMM
    Fimiston Open Pit

    By Neill A, O&apos

    The City of Kalgoorlie/Boulder is situated approximately 600 kilometres to the east of Perth (Fig. 1), and is the major regional centre of the Eastern Goldfields, supporting a population of approxim

    Jan 1, 1991

  • AUSIMM
    Developing the Foundation Communication Infrastructure to Support Remote and Automated Mining Initiatives in Underground Mines

    By D Kent, R Paine

    "Automated mining systems are increasingly being seen as a key requirement for a productive mining operation in the future. The importance of an integrated communication network infrastructure to supp

    Mar 24, 2014

  • AUSIMM
    Soft Computing Approach to Predict Blast-induced Flyrock

    By N Gupta, R Trivedi, S Bhandari

    Managing blasting operations in four mines surrounded by villages is a challenging task. This study aims to compare the blast-induced flyrock as observed in opencast mines by predicting flyrock distan

    Aug 24, 2015

  • AUSIMM
    Current and Best Practice for Monitoring Tunnelling Projects in Urban Areas – Alaskan Way Bored Tunnel, Seattle, Washington

    By L Galisson, E Audigé, D Sowers

    Establishing a robust geotechnical instrumentation and construction monitoring plan is one of the keys to the successful delivery of the world’s largest soft-ground bored tunnel in Seattle, Washington

    Sep 17, 2014