Search Documents

  • CIM
    Development of a Two-Stage Middlings Circuit at Inco’s Clarabelle Mill Part 1: Laboratory Studies

    By Manqiu Xu, Glen Robertson, Steve Wilson, Pete Quinn

    "The middlings circuit, once called the pyrrhotite rejection circuit, at Inco’s Clarabelle mill was a single flotation stage. It used to process a combined feed consisting of the main flotation scaven

    Jan 1, 2000

  • SME
    Selection, Design And Construction Of A Retaining Structure To Support The Primary Crusher Relocation Project At Round Mountain Mine - Preprint 09-022

    By O. MacIntosh

    The Round Mountain gold mine, located 90 km (55 miles) north of Tonopah, Nevada began large-scale production in 1977. During 2008 Round Mountain Gold Corporation (RMGC) relocated the primary crusher

    Jan 1, 2009

  • NIOSH
    OFR-63-77 Feasibility Study Of A Differential Current Ground Fault Or Leakage Current Sensor For Direct Current Offtrack Machines - 1.0 Introduction

    By Robert R. Perron

    The U.S. Bureau of Mines is engaged in many diverse programs fur improving mine safety. One area of interest to the Bureau is new and improved means for minimizing the hazards of accidental gas igniti

    Jan 1, 1976

  • NIOSH
    RI 6065 Factors Influencing The Design Of Hydraulic Backfill Systems (In Two Parts) 1. Friction-Head Losses Of Sand Slurries During Pipeline Transport ? Summary

    By William R. Wayment

    The objective of this investigation was to obtain data on friction-head losses of sand slurries during their transport in pipelines. The data ultimately will be used in designing hydraulic transport s

    Jan 1, 1962

  • AUSIMM
    The Century Discovery, Queensland, Australia - Is Exploration Ever Complete?

    The Century zinc-lead-silver deposit has a geological resource of 118 million tonnes averaging 10.2% zinc, 1.5% lead and 36 g/t silver. It lies approximately 250 krn NNW of Mt Isa in NW Queensland, Au

    Jan 1, 1995

  • CIM
    Ball Charge Dynamics and Liner Wear Simulation

    By Peter Raziszewski

    "A ball charge dynamics model is presented. Simulation results are compared with observed data showing good correlation. Based on the charge dynamics models, a liner wear model is presented along with

    Jan 1, 1997

  • SME
    Building An Intelligent Mining System – Morenci’s Approach

    By J. A. Flinn

    Phelps Dodge’s Morenci copper mine has had six drills, six track-dozers, 16 shovels, two loaders, and 90 haul trucks equipped with either Caterpillar, Aquila, or Modular GPS systems for nearly three y

    Jan 1, 2000

  • DFI
    Non-Linear Evaluation Of Pile Groups Lateral Deflection

    By F. Castelli

    A simplified non-linear method to predict the behaviour of a single pile and/or pile group under horizontal loads is presented in the paper. The evaluation of the non-linear lateral deflection is base

    Jan 1, 2006

  • SME
    Mountaintop Removal Controversy Slows West Virginia Coal Mining

    By Syd S. Peng

    Mountaintop removal (MTR) mining started in West Virginia nearly 30 years ago. This surface mining method can extract multiple coal seams as thin as a few inches in whole and minimum rock dilution in

    Jan 1, 2000

  • SME
    Specimen Mining at the Sweet Home Mine in Colorado’s Alma District

    By Paul Bartos

    Operations at the Sweet Home Mine transformed the mineral specimen industry, not only in the development of new innovative extraction techniques, but also in the fields of sample preparation and marke

    Jan 1, 2007

  • CIM
    Frozen Lump Generation of Oil Sands ? Climatic Challenges and Solutions

    By Derek J. Cyr

    Climate has an immense impact on the properties of Athabasca oil sands and the ease or difficulty with which it is excavated and extracted. During the winter months, exposed oil sands surfaces freeze.

    May 1, 2004

  • AUSIMM
    The San Cristobal Gold District, Antofagasta, Chile

    By S Kasaneva

    TheSan Cristobal gold district is located 110 km east of the port of Antofagasta, Chile. It contains the San Cristobal gold mine, where Niugini Mining Ltd. commenced a heap leach operation, with initi

    Jan 1, 1995

  • ISEE
    Vibration Reduction Mechanism and Experiment of Stepped V-cut Millisecond Blasting

    By Shi Hongchao, Zou Zou Xinkuan, Zhang Jichun

    As drilling and blasting is carried out in an urban tunnel, which is adjacent to an existing building or structure, the balance between blasting-induced vibration reduction and drivage efficiency is a

    Jan 1, 2015

  • AUSIMM
    Optimisation of a Semi-autogenous Grinding Mill through Trajectory and Power Modelling

    By P Toor

    Mill filling is an important operational parameter in a SAG mill circuit and by its control and optimisation it can produce significant improvements in production capacity and energy efficiency. Howev

    Sep 7, 2015

  • NIOSH
    Using Ultrasonic Anemometers to Evaluate Face Ventilation Conditions

    By J. Chilton

    The fact that methane ignitions continue to occur at the mining face indicates that monitoring with machine-mounted methanometers does not always indicate the presence of high methane concentrations.

  • SAIMM
    Secondary Breaking Strategy For Block 4 At De Beers - Finsch Mine

    By R. D. Hull

    Paper written on project work carried out in partial fulfilment of B.Sc. (Eng.) (Mining) degree As a partial fulfilment for the degree of B.Sc. (Eng) (mining) at the University of the Witwatersrand

    Jan 1, 2002

  • NIOSH
    OFR-72-84 Application Of A Portable Device For Measuring Dragline Roller Circle Track Deviations And Roller Loadings

    By R. Pallini

    The Franklin Research Center (FRO, a Division of The Franklin Institute was contracted by the U.S. Department of Energy to investigate the application of elastomeric materials for the purpose of smoot

    Jan 1, 1982

  • IOM3
    Application of physical modelling and particle flow analysis to evaluate ore-pass design

    By M. J. Beus, B. Stewart, S. Iverson

    Ore-pass hazards are a significant safety problem in US underground metal mines. From 1975 to 1995, nearly 75% of injuries during pulling or freeing of ore-pass chutes were related to falls of broken

    Jun 19, 1905

  • CIM
    Numerical Modeling Simulations of Spray-On Liners Support Potential in Highly Stressed and Rockburst Prone Rock Conditions

    By A. P. E. Dirige

    Extensive field study has been performed to assess the capabilities of thin sprayon liners (TSLs) and conventional spray-on support systems for preventing rock and support material damage that often r

    May 1, 2009

  • SME
    In-Mine Study Of High-Expansion Firefighting Foam - Preprint 09-095

    By L. L. Chasko

    A mine fire is one of the most challenging safety issues facing a mine operator and can occur at any location underground. The National Institute for Occupational Safety and Health (NIOSH) and the Tw

    Jan 1, 2009