Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Influence of Direct Aged Treatment on Creep Behaviors of Hot Continuous Rolling GH4169 SuperalloyBy Tian Sugui
By direct aging treated, creep properties measurement and microstructure observation, the influences of the direct aging treatment on the creep behaviors of Hot Continuous Rolled GH4169 superalloy are
Jan 1, 2010
-
Process Developments At Tailings Leach PlantBy Martin Banda, Gift C. Chisakuta, Moses Chabinga
KCM made a major modification to the Nchanga Tailings Leach Plant (TLP) changing the circuit from feeding post leach thickeners in parallel with leach discharge for solid ?liquid separation to a Count
Jan 1, 2005
-
The Reliability Of Conventional Design Methods For Driven Piles In Sand - SynopsisBy Kenneth Gavin
The accurate prediction of the shaft capacity of drives piles in sand continues to present problems for foundation designers. Research in this field has been carried out for many years and has yielded
Jan 1, 1996
-
Elm Road Generating Station Water Intake TunnelBy Brendan Reilly, Jon Isaacson, Paul McDermott
Kenny/Shea JV is constructing the water intake tunnel for the new Elm Road Generating Station, a supercritical coal-fired power plant in Oak Creek, Wisconsin, being built by Bechtel Power Corporation.
Jan 1, 2007
-
Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - SynopsisBy N. S. Yet
This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C
Jan 1, 2000
-
Innovations In ScandinaviaBy Carl-John Grävare
This paper deals with some of the systems and equipment that are being developed and/or are in use in Scandinavia. The main subject is the development of loading tests on the piles using monitoring eq
Jan 1, 2000
-
More Than 400,000 Expected at bauma 2004 in Munichbauma 2004 will feature a couple of firsts for one of the world’s largest construction and building materials machinery exhibitions. The event is scheduled for March 29 through April 4 of next year a
Jan 1, 2003
-
Mini-Bench Blasting Applicability at the Excavation for Foundation in SettlementBy Sadettin Bagdatli, Ali Kahriman, Umit Ozer, Alper Celtikci, Yucel Karakus
Due to population growth and rapid urbanization in Turkey, the need for the construction of residential units, transportation and infrastructure facilities has become increasingly more pressing. Since
Jan 1, 2014
-
Case History: Use Of Rock-Socketed Augered Cast-In-Place PilesBy Tracy Brettmann
The use of rock-socketed Augered Cast-In-Place (ACIP) piles is new to the Austin and central Texas region. This case history describes the design methodology, load test results, quality control proced
Jan 1, 1998
-
Precious Metal Deposits Related to Alkaline Igneous Rocks – A Space-Time Trip Through the CordilleraBy Felix E. Mutschler
Alkaline rock-related precious metal deposits include: • orthomagmatic platinum group elements (PGE) ± gold (Au); • porphyry copper-silver-gold (Cu-Ag-Au, ±PGE); • epithermal Au-only, and Au-Ag-bas
Jan 1, 1991
-
Role Of The Mill In A Competitive Minerals Company - Is Low Cost Enough?By Bruce Cavender
Historically, the processing function has been regarded as efficiently managed as long as production costs were kept low, recovery was adequate and sufficient plant capacity was avail-able. In this pa
Jan 1, 2008
-
Dynamic Testing of Combined Rock Bolt and Mesh SchemesBy A G. Thompson, E Villaescusa, A De Zoysa, J R Player
Ground support performance is critical to the safe and economical extraction of ore. This is particularly important for mass mining extractions at great depth, which are currently being considered by
May 9, 2016
-
Self-similarity and multiplicative cascade modelsBy F. Agterberg
In his 1978 monograph ‘Lognormal-de Wijsian Geostatistics for Ore Evaluation’, Professor Danie Krige emphasized the scale-independence of gold and uranium determinations in the Witwatersrand goldfield
Jan 1, 2015
-
Environmental Planning in Mine Waste Management - The Huckleberry Mines ExperienceBy Henri F. Letient
At the 25th Annual B.C. Mine Reclamation Symposium in September 2001, Huckleberry Mines Limited received the Jake MacDonald Reclamation Award for its exemplary mine waste management plan, conceived to
May 1, 2002
-
The Computerized Design Program for Tunnel BlastingBy Jeon Jeon, Yong-Kun Choi, Chung-In Lee, Yong-Hun Jong, Hag-Soo Kim
In this study, a computer program to design tunnel blasting pattern has been developed. The program consists of two parts; one is for tunnel blasting pattern design and the other is for blasting model
Jan 1, 2005
-
Concepts and Case Study for Regular Rhythmic Timing and SequenceBy Neal Lee, Braden T. Lusk, Jhon Silva-Castro, Patrick J. Jenks
"Timing and charge sequence are very important for optimized blast design. Traditional nonelectricinitiation systems have moved the industry toward a system of delays consisting of hole-to-hole androw
Jan 1, 2016
-
Adeco As An Alternative To NATM: How It Works, WHY It WorksBy Fulvio Tonon
And Rabcewicz said ?tunnels should be driven full face whenever possible.? ADECO, which stands for ?Analysis of Controlled Deformations in tunnels,? now allows us to fulfll Rabcewicz?s dream in any st
-
Physical Strength Assessment in Ergonomics - 1. IntroductionBy Sean Gallagher
Humankind's interest in measurement of human physical strength probably dates to the first humans. At that time, life was truly a struggle in which the fittest survived. To a great extent, fittes
Jan 1, 1998
-
Quality Control Of Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Piles ? IntroductionBy Rudolph P. Frizzi
Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is
Jan 1, 2003
-
Design, Construction, and Start-up of Stillwater Mining’s East Boulder ConcentratorBy P. Lefebvre, J. Sargent, K. Major, B. Darnton
"Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin
Jan 1, 2003