Search Documents

  • ISEE
    The Accuracy of blasting vibration prediction using signature hole and site constant analysis (a case study: Blasting near crusher structure, limestone mining in Indonesia)

    By Jihan Farhan Lubis, Putu Chandra Darmansyah

    Ground vibration caused by blasting has become a common concern, especially when blasting is conducted near buildings or structures. Uncontrolled vibrations can potentially damage nearby infrastructur

    Jan 26, 2026

  • AIME
    The Geology Of Some Kaolins Of Western Europe

    By Ernest Lilley

    WHILE American scientific literature contains much information upon geologic conditions controlling the production of oil in Rumania, copper in Chile, and other fuel and metallic resources in many for

    Jan 1, 1932

  • SME
    A New Gold Mill For Nevada - Introduction

    By Robert E. Baker

    Cortez Gold Mines, the United States' third largest primary producer of gold, commenced continuous operations on January 10, 1969. The decision to proceed to production was made in March of 1968

    Jan 1, 1969

  • SME
    Sustainable Change of Coal-Mining Regions Mining, Metallurgy and Exploration

    By Jürgen Kretschmann

    According to the model of product life cycles, the global coal mining industry is in the stagnation phase. The coal demand of the main consumer, China, has peaked in 2013 and is slowly declining. The

  • CIM
    Evolution and Optimization of the Gravity Recoverable Gold Test

    By S. Koppalkar

    ABSTRACT: The development and evolution of the gravity recoverable gold (GRG) test procedure at McGill University is reviewed in this paper. Since the late 1980s, the research group led by the late Pr

    Jan 1, 2010

  • CIM
    The Steel Industry of the Prairie Provinces

    The primary steel industry of the Prairie Provinces consists essentially of three companies whose total annual melting capacity, as of January 1, 1963, was 333,000 net tons. These companies have steel

    Jan 1, 1963

  • TMS
    Mixture Design Applied to the Electrochemical Reduction of CaW04 to W

    By Metehan Erdogan, Orhan Gökçe Göksu, Ishak Karakaya

    "An experiment (mixture) design was created to optimize the process parameters of the electrochemical reduction of CaW04 to W in molten CaCl2-NaCl eutectic mixture. Temperature, applied voltage and th

    Jan 1, 2012

  • SME
    Room-and-pillar panel design method to avoid surface subsidence (baff531e-1217-4963-ad11-1cde90cbd566)

    By Y. Luo

    Cuando se diseña y operan minas de carbón subterráneas con el método de cámaras y pilares, es siempre difícil obtener un buen equilibrio entre la prevención de subsidencia de la superficie y la obtenc

    Jan 1, 2014

  • CIM
    Direct Contact Heat Transfer between Steam and Aqueous Slurries

    By D. T. White

    "Metallurgical extraction processes often call for the heating of aqueous slurries. Indirect heat exchangers are generally not feasible for service with high yield stress slurries because of low heat

    Jan 1, 2012

  • AUSIMM
    The Flotation of Alluvial Gold (1221b610-5c83-4a74-abdf-ffdcdef2d0d1)

    By Keyte SG

    Gravity methods of recovering alluvial gold are not very efficient at particle sizes below about 0.1mm. Whereas such gold may not have been economic to recover in the past, the same may not be true to

    Jan 1, 1990

  • CIM
    The impact of rotary lobe blower seal upgrades at INCO’s Copper Cliff Nickel Refinery

    By J. Costigan, C. Corless

    In 1997, damage as a result of Castrol R40 entering the INCO pressure carbonyl plant carrier gas stream was becoming increasingly severe. The oil in the gas stream was adversely affecting both equipme

    Jan 1, 2000

  • CIM
    Oil and Gas Possibilities in Prince Edward Island

    By E. P. Williams

    "Prince Edward Island, Canada's smallest Maritime Province, is located in the southwestern part of the Gulf of St. Lawrence. The Province is more or less centrally located in the Maritimes Basin, a la

    Jan 1, 1967

  • CIM
    A methodology for rock mechanics feasibility studies

    By Dave Ecobichon, Éric Côté, Simon Nickson, Michel Leclerc

    The feasibility assessment of a mineral deposit requires the construction of a geo mechanical model of rock mass properties, for the purpose of preliminary mine design. The Noranda Technology Centre h

    Jan 1, 1996

  • TMS
    Zinc Sulphide Pressure Leaching at Kidd Creek

    By A. C. Mollison

    In November of 1983 a fire inside the autoclave caused the curtailment of operation of the Kidd Creek pressure leaching facility. Subsequent repairs and recommissioning of the autoclave in 1984 allowe

    Jan 1, 1990

  • TMS
    Practice on Exploration of Oxygen-Enriched Converting Industrial Production by Kaldo Furnace

    By Zhihua Wang

    Through metallurgical calculation and process analysis based on metallurgical theory, it is aimed to raise the concentration of smelting oxygen and improve the update speed of reaction interface, acce

  • SME
    Pumice and Pumicite – A Review of 1992 Activities

    By Gordon C. ‘Bud’ Presley

    The pumice and pumicite review arrived too late for the June issue. Estimated domestic production of pumice and pumicite in 1992 was up compared with 1991, according to US Bureau of Mines statistic

    Jan 1, 1993

  • ABM
    Effects Of The Incorporation Of Clay On Properties Of The Biodegradable Copolyester/pla Flexible Film

    By Andressa Alves da Silva

    Nowadays, population growth and the interest of food industry, makes the research and applications of biodegradable polymers increase, because under favorable conditions its degradations may occur wit

    Aug 8, 2018

  • AUSIMM
    A Note on Kitaev et al Fomulation of the Gas Flow with Tuyere Wind Entry

    By Propster M, Choudhry M

    THIS note gives comments on the paper by Kitaev et al on p. 68 of this book and compares results with those obtained by ourselves. We wish to say that the authors are to be congratulated on their s

    Jan 1, 1975

  • ABM
    Tk-csa New Rh Installation – Moving To Industry 4.0 Solution

    By Andrea Pezza

    The paper describes the recent new installation and start-up of the second RH (Recirculation Degasser) in Rio de Janeiro plant of thyssenkrupp CSA Siderúrgica do Atlântico. The new plant is installed

    Oct 30, 2017

  • NIOSH
    RI 8666 Electrokinetic Densification of Solids in a Coal Mine Sediment Pond - A Feasibility Study - (In Two Parts) - 1. Laboratory and Field Tests

    By R. H. Sprute

    This report describes a feasibility study to consolidate coal waste sludge in a 100-acre pond by applying direct current between floating and buried electrodes. The study was conducted by the Bureau o

    Jan 1, 1982