A Linear Coal Pillar Strength Formula for South African CoalBy Nielen van der Merwe
The data base of failed pillar cases as used by Salamon and Munro (1967) in their original analysis to determine the strength of coal pillars empirically, has been updated for this study. It is shown
Jan 1, 2002
-
Longwall Moves At Twentymile Recovery Mesh SystemBy Michael A. Berdine
In early 1997, Twentymile Coal Company took a dramatic departure from traditional longwall recovery methods. Previously, Twentymile's standard longwall meshing procedure included the use of chain
Jan 1, 2001
-
The Technical Progress and Problems to Be Solved of Thick Coal Seam Mining in ChinaBy Jiacheng Wang
The current state of thick seam coal mining methods is illustrated in three typical cases of thick seam longwall mining, each pointing out the outstanding achievements in top-coal caving mining and la
Jan 1, 2011
-
An Approach To Identifying Geological Properties From Roof Bolter Drilling ParametersBy Gerald I. Finfinger
Identifying the properties of overlying rocks in underground mining operations is important to ensure the appropriate roof support design is used to maintain stability of the mine entries. Recently J.
Jan 1, 2000
-
Automation Of A Progressive Failure Procedure For Analysis Of Underground Mine Pillar DesignsBy N. P. Kripakov
The U.S. Bureau of Mines (USBM) is conducting research to develop a practical computer-based tool that will allow coal mine planners to anticipate rock mass behavior surrounding mine entries prior to
Jan 1, 1994
-
Methods of Designing Mechanical Roof Bolting in Horizontally Bedded Strata (7261e3ed-3657-491d-b3f5-21e326427bd6)By David H. Y. Tang
The reinforcement mechanism of suspension effect is analyzed based on beam-column theory. The equations of the maximum bending stress, deflection and transferred bolt load for the bolted roof strata
Jan 1, 1984
-
Analysis And Field Testing Of Presupport Application In Coal StrataBy J. D. Dizon
Conventional strata control methods (i.e. roof bolts. cable trusses) are not always effective for ground control of very weak coal strata. An alternative method, termed presupport. is being investigat
Jan 1, 1990
-
Laboratory Testing of Rib StrapsBy E. Bane Kroeger
Rib failure is a hazard that has resulted in many injuries and fatalities in underground coal mines, especially in soft coal seams. Conventional rib control methods including rib boarding, shotcreting
Jan 1, 2004
-
Influence Of Support Capacity And Geometry On Tailgate SupportBy E. Hosca
Alternative tailgate loading conditions due to conventional and conventional/yield pillar combinations were evaluated to define roof loading. In order to isolate different loading situations, the tail
Jan 1, 1994
-
Techniques To Increase Yield Pillar Residual StrengthBy Dennis R. Dolinar
The U.S. Bureau of Mines has modeled yield pillars to determine the effects of reinforcement techniques on pillar performance. Model pillars with width-to-height (w/h) ratios ranging from one to four
Jan 1, 1993
-
Shear Bond Characteristics in Grouted Cable BoltsBy Jian Yong Chen
The results of a laboratory investigation of pullout tests conducted on grouted, plain cable bolts are reported. The main purpose of the study is to determine experimentally the shear bond stiffiess o
Jan 1, 2005
-
Updating the NlOSH Support Technology Optimization Program (STOP) With New Support Technologies and Additional Design FeaturesBy Thomas M. Barczak
The initial Support Technology Optimization Program (STOP), Version 1.0, was released at the 19th Gmund Control Conference. This original program has since been updated to Version 2.3 which was releas
Jan 1, 2001
-
Design Considerations For Bump-Prone Longwall MinesTailgate pillar and tailgate-face corner humps have been a major threat to longwall coal mines where hump-prone conditions exist. The yield pillar design concept, in which the longwall chain pillars a
Jan 1, 1999
-
Geotechnical Aspects of Subsidence over Room and Pillar Mines in IllinoisBy Gennaro G. Marino
Site conditions at several shallow room and pillar mines in Illinois are described and compared with the charac¬teristics of the subsidence profiles at the ground surface. The shape and magnitude of t
Jan 1, 1984
-
A Novel System For Automatic Installation Of Cement Grouted Roof BoltsBy A. Mahyera
BETTER ROOF SUPPORT During the last decade, resin-grouted roof bolts have taken a substantial foothold in the coal mining industry - now accounting for about one-third of all bolts installed annual
Jan 1, 1984
-
The Effectiveness Of Interpanel Pillars In The Control Of Surface Subsidence (ef7cc44b-3192-4f5f-a75c-62563d519797)By Laxminarayan Holla
There exist many formulae for designing coal pillars. However, when applied to a given set of mining parameters, they lead to different pillar sizes and factors of safety. From the subsidence point of
Jan 1, 1992
-
Subsidence Studies In Thick And Steep Coal Seam MiningBy M. Y. Fisekci
This paper concentrates on subsidence measurements, applied over the thick and steep seam mining in the Rocky Mountains Region of Western Canada. The studies to date indicate that two new subsidence m
Jan 1, 1981
-
Development And Demonstration Of An Alternate Mining Geometry For Improved Ground Control In An Illinois Coal MineBy Y. P. Chugh
About 60-70% of the underground mined coal in Illinois is extracted using a room-and-pillar mining method that permits extraction of about 50% of the coal. The remaining coal is left behind in the for
Jan 1, 2004
-
Calibration Of The Analysis Of Longwall Pillar Stability (ALPS) Chain Pillar Design Methodology For Australian ConditionsBy Mark Colwell
This paper summarizes the results of a research project whose goal was to provide the Australian coal industry with a chain pillar design methodology readily usable by colliery staff. The project was
Jan 1, 1999
-
Case Studies Using Mine-Wide Monitoring Systems For Geotechnical EvaluationsBy John P. Dunford
U.S. Bureau of Mines researchers are investigating the ability of mine-wide monitoring systems already in place at many coal operations to provide a direct link between geotechnical instruments and th