Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Improving Screen-Bowl Centrifuge PerformanceBy T. Burchett, F. Stanley, K. McGough, G. Luttrell
The vast majority of U.S. coal preparation plants utilize screen-bowl centrifuges to dewater their fine clean coal products. In light of this popularity, researchers at Virginia Tech have engaged in a
Jan 1, 2006
-
Energy Growth Bodes Well For Western Coal, RMCMI Attendees ToldBy Steve Kral
The coal mining industry in the western United States is seeing the same boom as the rest of the country and the world. Most coal mines in the West are operating flat out as the nation’s appetite for
Jan 1, 2005
-
Machine Utilization Time Of NATM Method In Metro Tunnels: The Case Of Kadikoy-Kartal Metro Tunnels (Istanbul) ? IntroductionBy I. Ocak
Initial investment for mechanical boring of tunnels is found to be high in most cases. Conventional drilling and blasting is not the possible especially in urban area. In these conditions impact hamme
Jan 1, 2011
-
Innovative features of the Bridger Coal Company supply air fans and systemBy G. S. Takenaka
When Bridger Coal Company transformed their operations from surface mining to an underground longwall operation their plans included not only the addition of new mining equipment but also surface fans
Jan 1, 2009
-
Acquiring Capital Funds for Coal MiningBy Dale S. Hursh, William A. Brooks
Introduction US dependence on external energy sources is dangerous because of unstable political situations existing in key energy exporting countries. So, recent national energy policies call for
Jan 9, 1982
-
Modeling helps tame surges in rapidly filling storage tunnelsBy Peter Klaver
Deep tunnels have been used for decades for the temporary storage of large volumes of urban runoff, both storm water and combined sewer overflow (CSO). Tunnels are attractive because they reduce surfa
Jan 3, 2010
-
Energy Dissipation and Fragmentation of Granite Core During High Velocity Impact Mining, Metallurgy and ExplorationBy Ying Lu, Jeffrey C. Johnson, Chen-Luh Lin, Jan D. Miller, Sindhoora Puvvada
Energy dissipation and fragmentation of rock is of interest for mine-to-mill operations in order to understand breakage and to minimize energy consumption during blasting at the mine site, and comminu
-
Energy Dissipation and Fragmentation of Granite Core During High Velocity Impact Mining, Metallurgy and Exploration (1de527b1-559a-4ec3-825e-46bd7ac58c2b)By Ying Lu, Jeffrey C. Johnson, Chen-Luh Lin, Jan D. Miller, Sindhoora Puvvada
Energy dissipation and fragmentation of rock is of interest for mine-to-mill operations in order to understand breakage and to minimize energy consumption during blasting at the mine site, and comminu
-
Antiscalants For Gold Processing ApplicationsBy W. H. Dickinson
The performance of seven antiscalants spanning a range of chemistries was evaluated for control of calcium carbonate (CaCO3) formation in gold processing applications. Three preferred chemistries were
Feb 27, 2013
-
Geotechnical And Structural Design Challenges Of The Fremont Central PARK Subway For The Bart WARM Springs ExtensionBy Mitchell L. Fong
The Bay Area Rapid Transit (BART) District will be extending BART service south along an 8.7-km (5.4-mile) -long corridor in the city of Fremont, California as part of the Warm Springs Extension (WSX)
-
Adding A Third Main Fan At The Waste Isolation Pilot Plant (SME Annual Meeting March 1-3, 1999, Denver, Colorado)By K. H. McDaniel, L. Griswold
The Waste Isolation Pilot Plant (WIPP) is adding a third fan to operate in parallel with, and supplement, its two existing main fans. An engineering analysis conducted in 1995 identified the need for
Jan 1, 1999
-
Drop Shafts for Narragansett Bay Commission CSO Abatement Program, Providence, Rhode IslandBy Rafael C. Castro, Geoffrey Hughes, Fredrick (Rick) Vincent, Philip H. Albert
Seven pairs of drop and ventilation shafts, between two and nine feet in diameter, will convey combined sewer flow to a 230-foot-deep, 26-foot diameter storage tunnel. This paper will present case his
Jan 1, 2007
-
The Next Step Change In The Size Of Mining ProjectsMany of the world?s largest existing mines are considering substantial step changes in production volumes, compensating for declining ore grades while trying to address increases in world demand for r
Feb 27, 2013
-
Processing Of Arsenic Bearing Gold Ores (2002 SME Annual Meeting)By V. E. Chrapunov, T. V. Chnyrenkova, R. A. Isakova, V. A. Luganov
Arsenic-gold bearing ores are used as a flux in smelting or leached out to extract gold. To decrease arsenic content in processed materials and to break up the lattice to free the gold, raw materials
Jan 1, 2002
-
Operating Ideas That Have Saved Me Some Bucks-Gold Milling at RayrockBy Debbie Laney
DOUG HALBE: Second in our quick run-through on "Operating Ideas That Have Saved Me Some Bucks," was Debbie Laney of Rayrock Mines. Debbie apologizes. She can't be here. But she said, "Doug, don&a
Jan 1, 1998
-
Data Evaluation for Sustainable Development IndicatorsBy S. Möllerherm
"The evaluation of data and information provided by the existing traditional indicators in sustainability assessments is most important. Therefore the Institute of Mining Engineering I from the RWTH A
Jan 1, 2005
-
Beach sand mining and its separation in Oscom, Orissa (India)By K. N. Panigrahi
India bestowed with 6000km of the coastal belt, contains some of the richest and largest placer deposits with a mixture of heavy minerals like ilmenite, rutile, leucoxene, zircon, monazite, sillimanit
Jan 1, 2005
-
Site Specific Blasting Model For Mine-To-Mill OptimizationBy K. M. Kim
A site-specific blasting model has been developed for the Asarco Mission mine. The main inputs to the model are the in-situ block size (F80), the post-blast fragmentation (P80) and the intact tensile
Jan 1, 2011
-
Use of Simulation to Validate Load And Haul Requirements at Cortez Gold MinesBy W. L. Jacobsen, T. L. Dyer
Cortez Gold Mines is completing a Feasibility Study for a new open pit gold mine in north central NV. The production schedule calls for a peak in material movement. This schedule is based on current o
Jan 1, 2006
-
3D CFD Simulation Of Airflow Re-Distribution And Associated Pressure Drops Inside The Overcast In Underground Coal MinesOvercasts are indispensible ventilation control devices to permit one airway to pass over another without mixing in room and pillar coal mining. The airflow distribution inside the overcast depends on
Feb 27, 2013