Geometallurgy, Geostatistics And Project Value - Does Your Block Model Tell You What You Need To Know? (79805515-8020-457c-a8c9-03fe63a5b813)The key functions of project evaluation are to assess potential profitability and to develop an effective operational design. For mining projects, design aspects include mining methodology, ore treatm
Jan 1, 2007
-
A quality classification of building stones from P-wave velocity and its application to stone cutting with gang saws - SynopsisBy S. Kahraman
P-wave velocity measurements were carried out on 22 large limestone blocks in a stone processing plant. In the laboratory, P-wave velocity of core samples was measured to obtain intact rock velocity.
Jan 1, 2007
-
Dealing with Expansive Rocks in the Los Quilos and Chacabuquito Water Tunnels Andes Mountains of Central ChileBy S. O. Castro, R. E. González, L. E. Velasco, J. M. Van Sint, P. V. Lois
Abstract Several zones with expansive rocks were encountered during construction of two tunnels of the water conduction system for the Chacabuquito Hydropower Plant, located in the Aconcagua river
Jan 1, 2003
-
Knowledge in—Money out, redefining mine planning and scheduling standards to improve and stabilize business performanceBy M. Arnesen
Mining professionals recognize the need to continuously evaluate and refine mine planning standards and scheduling. We must examine our current reality, and evaluate the following: •How well do our p
Jan 1, 2003
-
Interaction Of Slurry Pipe Flow With A Stationary Bed (eab14233-2963-4b47-b514-ae051e43ba35)By V. Matou?ek
The paper addresses pipe flows of aqueous medium-sand slurries at velocities lower than the deposition-limit velocity. Laboratory test results including measurements of particle concentration distribu
Jan 1, 2007
-
Empirical Correlation Of Mineral Commodity Prices With Exchange-Traded Mining Stock Prices ? SynopsisBy C. Nangolo
Mineral commodity prices comprise one of the key criteria in the selection of mining stocks. We contend that of the three principal elements of mineral commodity prices, spot price, forward price and
Jan 1, 2011
-
The Art and Science of Dense Medium SelectionBy Bosman
Medium suspensions play an integral part in the successful application of dense medium separation for both static and dynamic separators. Although models exist to predict particle movement as a functi
Jan 1, 2014
-
A cobalt solvent extraction investigation in Africa?s Copper Belt - SynopsisBy T. Könighofer
Processing of copper-cobalt orebodies in Africa?s Copper Belt has received much recent attention with various flowsheet options being developed specifically for the refining of cobalt. The upfront lea
Jan 1, 2009
-
Analysis of Deep-level Mine Design Problems Using the MINSIM-D Boundary Element ProgramBy J. A. L. Napier
Computer programs which rely on the assumption of linear, elastic rockmass behaviour have been used routinely for many years in the South African mining industry to determine the stresses arising in t
Jan 1, 1987
-
Computer Aided Lignite Mining in the Rhineland Lignite Mining AreaBy E. Dermietzel
The fundamental ideas of Computer Aided Lignite Mining (CALM) with respect to hardware and software used at Rheinbraun are explained and outlined in detail. The computers used in the main data process
Jan 1, 1987
-
Design?a strategic issue - SynopsisA set of six design principles for rock engineering was developed by Bieniawski: design objectives; minimum uncertainty; simplicity of design components; state-of-the-art practice; optimization; and c
Jan 1, 2009
-
Computer-aided Use of a Screening Process ModelBy G. Ferrara
The mathematical framework of a well-established model proposed earlier by the authors for the screening process is briefly recalled. Some numerical methods for the application of the model, concernin
Jan 1, 1987
-
Review Of Mud Rush Mitigation On Kimberley?s Old Scraper Drift Block CavesBy A. Holder
A major mud push occurred on the 870 m production level, scraper drift block cave at Dutoitspan diamond mine in November 2011, during which it is estimated that more than 4 400 m3 of mud engulfed the
Jul 1, 2013
-
Integrated Production Of Liquid Sulphur Dioxide And Sulphuric Acid Via A Low-Temperature Cryogenic ProcessBy M. Verri
The paper describes the design options available for the simultaneous production of liquid sulphur dioxide, via cryogenic condensation, and sulphuric acid in a sulphur-burning sulphuric acid plant. Th
Aug 1, 2013
-
Geometallurgical Characterization of South Georgian Complex Copper-Gold OresBy V-P. Takalo, M. Natsvlishvili, M. Hicks, S. Khizanishvili
"The complexity of copper-gold ores leads to large variations in recoveries and concentrate grades in the processing plant. Detailed chemical and mineralogical studies revealed considerable variation
Apr 1, 2019
-
The Mixing Of Backfill In Gold MinesThe special mixing requirements for backfilling are discussed, and the problems associated with the mixing of coarse and deslimed slurries, as well as the tailings from the gold plant are outlined. Th
Jan 1, 1988
-
Mechanical Sampling - A Manufacturer?s PerspectiveWith the advent of the First World Conference on Sampling and Blending (WCSB1) in Denmark in 2003 and the subsequent biannual meetings, together with other sampling conferences held on a regular basis
Jan 1, 2014
-
The Influence of Various Factors on the Results of Stability Analysis of Rock Slopes and on the Evaluation of RiskBy M. J. Kanda
"The design of rock slopes in the planning and operation of open pit mines and for road and rail cuttings requires the evaluation of their stability. This is commonly done using two well-established m
Jan 1, 2016
-
Geotechnical Rock mass Evaluation of Givi Damsite, (Case study, Ardabil-Iran)By R. Ajalloian, L. Karimzadeh
This paper describes the engineering properties of Givi dam foundation. Givi dam will be built across the Givi River on the andesitic rocks (Karaj formation) in Ardabil province (northeast of Iran). G
Jan 1, 2003
-
A Robust Approach to the Design of Milling Circuit Control Systems in the Presence of Modelling ErrorsBy A. Montini
The problems encountered in the design of control systems for milling cir- cuits when the model of the system and the model parameters are uncertain are discussed. Considering these uncertainty factor