Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Gradation Control Using Low Density Bulk EmulsionBy Adam T. Young
This paper will describe the process of using low density bulk emulsion as a means to maximize the production of an oversize or “rip rap” aggregate size range (8 inch to 72 inch) that the quarry custo
Jan 1, 2017
-
Worsey-Silva Equation for Modeling Fragmentation Caused by Row TimingBy J. Silva, T. Worsey
The Worsey-Silva equation determines the optimal row timing for the smallest fragmentation and allows fragmentation models to be adjusted due to row timing. The equation utilizes the concept of dynami
Jan 1, 2024
-
Update on Blasting Near a CrusherBy Scott G. Giltner, Alex Schwenk
This paper is an update on a paper presented at the 2022 ISEE conference. The original paper presented how the mine operator desired to open up ore reserves near several mine structures including two
Jan 21, 2025
-
Fragmentation Improvement Through the Application of Explosive Charge in the Stemming for the Reduction of Oversize in High Hardness RockBy Gustavo Huerta Valer, Jorge Cárdenas Miranda, Johan Salas Flores
One of the challenges of mining is the optimization of the blasting process, which has an important impact downstream in the processing of crushed ore in the plant, that is why mining companies ensure
Feb 6, 2023
-
Cast Blasting Advances and Challenges at Arco's Black Thunder MineBy Robert L. Martin, Brian W. Stump
"The Black Thunder Mine is located in the Powder River Basin of Northeastern Wyoming. Over 39.2million tons of coal were produced at the Black Thunder Mine in 1996. Just over 100 million pounds ofANFO
Jan 1, 1997
-
Numerical Modelling and Electronic Initiation to Assist Blasting in Heavily Jointed RockBy Andrew Theobald, Peter Dare-Bryan, Trevor Byers
The use of advanced modelling techniques and the timing flexibility of electronic initiation systems allows for unprecedented control over blast outcomes as shown in several complex blasting problems
Jan 1, 2010
-
Monte Carlo Approach to Signature Hole AnalysisBy Braden Lusk
Vibrations as a result of blasting practices in mining engineering are a complex phenomenon controlled by many variables. Mine blast vibration modeling and prediction is becoming more important as a c
Jan 1, 2013
-
Gas bubble sensitisation of a non-ideal explosive using different gases as hot spotsBy Italo Onederra, Miguel Araos
Most of the current explosives for mining blasting activities rely on voids to become sensitive to initiation, then detonating and finally, sustaining that detonation. The use of voids is known as hot
Jan 26, 2026
-
Improving stope productivity with wireless initiation.By Luan Monteiro, Francisco Biulchi
The AngloGold Ashanti - Cuiaba mine sought innovative approaches to minimize lateral development and stope extraction time while maintaining optimal gold recovery and minimizing dilution. The stope 8G
Jan 21, 2025
-
Mine-to-Plant Optimization Through Ultra High-Energy Explosives and Blending Strategies in Extremely Hard Rock ConditionsBy Luis Huaroc, Jorge Cardenas, José Salvador
One of the current challenges in mining is managing increasingly competent rock conditions within the mine-to-plant value chain, particularly when working with marginal ore grades. This study presents
Jan 26, 2026
-
Missouri S&T Experimental Mine Expansion and Associated Risk Safety AnalysisBy Patrick Cahill, Jacob Miller, Nolan Mundwiller, Catherine Johnson
"The Experimental Mine at the Missouri University of Science and Technology is undergoing major developments. The underground workings are being expanded to include a ramp down to a second level which
Jan 1, 2017
-
Subdrill – The Underutilised Blasting ParameterBy Stephen Mansfield
In metalliferous mining operations, subdrill is that portion of the blast hole that is drilled below the target grade elevation, and in most cases loaded with explosives. Its primary aim is to enable
Feb 1, 2020
-
Efficient and Safe Pre-Split Blasting Through Mechanized Explosive Loading SystemBy Jorge Cárdenas, Gustavo Huerta, Regina Rocha Oriundo, Miguel Angel Humpire, Johan Salas Flores
Currently a critical activity for slopes stability and safety in mining is pre-split blasting to reduce damage from trim blast. Most common explosive used are based on packaged explosives, with 1 ½ in
Feb 6, 2023
-
Blast optimisation at limestone quarry operations – good fragmentation, less finesBy Benjamin Cebrian
Rock blasting at quarries represents multiple challenges not easy to see at first sight. Aggregate industries face similar or superior prices for explosives while extracting a material that usually is
Jan 1, 2010
-
HMX Based Electronic Initiation System for Blasting in High Temperature Ground and/or Extremely Reactive GroundBy K. Dufresne
Blasting in geothermally high temperature ground and/or extremely reactive ground is an increasing common challenge for surface and underground mines. Many current PETN based non-electric and electron
Jan 1, 2024
-
Vibration Data Analysis to Increase Slope AdhesionBy August Ferraz Ribeiro, Guilherme Dias Mendona, Paula Henrique Lisboa, José Silvio Corsini
Correct slope adhesion is related to the conformity of the slope’s real geometry to slope planning. It is very important in mining because slope design has economic and safety implications. Slope desi
Feb 6, 2023
-
Blast Optimization using Air Decking with Gasbags – An Open Pit Gold Mine Case Study.By Angelina Anani, Seffit Aderuyi, Sylvester Avane, Joseph Wilson-Sey, Amatus Niminye
The Edikan mine in Ayamfuri, Ghana, faces economic challenges and community resistance due to its proximity to residential areas, particularly concerning blasting operations. Controlled blasting trial
Jan 21, 2025
-
Journal: 20th Annual Photo and Art Contest - Honorable Mention "Snoqualmie Pass"By Corry Goumans
Photos 1 - 4 – Chris Elliott is a rock slope supervisor on a construction project east of Seattle, Washington. His job is to look after a “two man” scaling crew working on the rock bluffs some 300 fee
Jan 1, 2014
-
Thiokol's Accublast Detonator: Precision Benefits the Industry can JustifyBy W B. Gregg
"A review, update, and expansion of Thiokol’s presentation at BAl’s Fiih High Tech Seminar titled ‘ADetonator - An Era of Precision in All-Electronic Detonators” is provided herein (and should be cons
Jan 1, 1995
-
A New Method to Calculate the Frequency Associated with the Peak Particle Velocity of the Vector SumBy Ruilin Yang
The vector sum peak particle velocity (PPV) of blast vibrations describes the blast vibration intensity more completely than the PPV of a single component waveform. It is more logical to use a vector
Jan 1, 2015