Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Investigation of Cautious Blasting Model Applied During Tunneling of Kadikoy-Kartal Subway ConstructionBy Ali Kahriman, Olivio Angelini, Ibrahim Sefer, Burak Ekmen, Koray Arpak, Ertugrul Kaya, Yucel Karakus, Abdullah Sak, Aziz Ozdemir
In recent years, in order to bring solution to traffic intensity arising from transportation problems and facilitate public transportation in the modern world in paralel to urbanization and to the inc
Jan 1, 2010
-
Experimental and Numerical Investigation of the Effects of Jointing on FragmentationBy Nikolaos Petropoulos, Changping Yi, Daniel Johansson, Håkan Schunnesson
The effect of jointing on fragmentation by blasting was investigated experimentally and numerically. Firstly the experimental results were presented. Then the numerical modelling based on the experime
Feb 1, 2020
-
Magnitude 2.8 Earthquake Caused by 90 Pounds (41 kg) Per Delay! Not So FastBy D. Rudenko, C. T. Aimone-Martin, J. K. Ratliff, I. G. Wong, J. Aiken, R. E. Burnham, T. A. Davidsavor
A small quarry blast was conducted with a maximum of 90 pounds per delay and shortly afterwards, area residents sensed ground motion and building shaking indicative of an earthquake. In addition, seis
Feb 6, 2023
-
Optimization of Ring Blast Design for Ore Dilution Control in Underground Hard Rock Mine Using Numerical SimulationBy A. Vishwakarma, V. Himanshu, K. Dey
Underground mining is the most feasible method after extinction of shallow depth ore deposits. Longhole stoping method is the most technically advanced method for the faster excavation. In this method
Jan 1, 2024
-
Evaluation of Emergent Electronic Detonators and Modern Non-Electric Shocktube Detonators AccuracyBy J Silva Castro, W C. Wedding, B T. Lusk, J Calnan, E G. Morris
The emergence of electronic detonators for use in production mine blasting has enabled mining professionals to rethink the traditional blast design methodologies that pertain to timing. In many ways,
Jan 1, 2012
-
Technology for Risk Management and Decision Making in Civil ExplosivesBy Davey Bickford, Johan Hawinkel
Blasting and the use of civil explosives are a critical step in the mining process. Good decisions provide significant downstream benefits and create a safe and sustainable working environment, while
-
Optimized Blast Design Through Drone Surveying and 3D Geological Modeling to Solve Highwall Stability ProblemsBy Matt Brandon
This case study demonstrates how integrating drone and GPS surveying with 3D modeling software creates more effective blast designs that address specific geotechnical challenges while improving safety
Jan 26, 2026
-
Underground Longhole Blasting near Large-diameter Booster FansBy Norm Disley, Kingsley Hortin, Gertjan Bekkers
As part of the expansion of the Kidd Creek Mine to 2,682 meters (8800 feet) below surface, two largediameter 3000kW (4000HP) booster fans were installed at the 6000 level. Shortly after commissioning
Jan 1, 2008
-
How to Achieve 100% of Advance in TunnelBy Alan Diaz Butron, Eng. Thierry Bernard
"In tunnel blasting the most challenging objective is definitively obtaining the maximum advanceassociated to a minimum overbreak. Achieving 100% of advance with no overbreak is the targetchallenge by
Jan 1, 2017
-
Burden Profiling: Do You Measure What You Think You Do?By Greg Shapiro, Paul Dr. Worsey
Mining, quarry, and construction blasts are becoming more and more dependent on bench profiling. The use of accurate profiling gives the blaster better data for the most efficient blast results. So,
Jan 1, 2019
-
Precision Delay Detonators and Their Effect on Blasting Performance in Quarry BlastsBy B Mohanty, M Alam, F Gauthuer
A series of eleven full-scale production blasts has been earned out in a limestone quarry to study the effect of delay interval and its precision on overall blasting performance. The quarry employed A
Jan 1, 1991
-
Better Fragmentation Through Team work At Dos Pobres Mine Safford, ArizonaBy Denard Brandt, Isidro Martinez, Greg Baker, Laura Slattery, Teddy French
The Dos Pobres Mine is a copper oxide heap-leach mine located near Safford, Arizona. Mine production is 180,000 tons (163,293 tonnes) per day with a stripping ratio of 2:1. During the startup phase of
Jan 1, 2010
-
Drill Monitoring & Navigation Systmes at BHP Billiton's Navajo MineBy John Vynne
BHP’s Navajo coal mine installed drill monitoring and high precision navigation systems on their three overburden drills during 2002 and 2003. Details of the DrillNav system hardware and reporting sys
Jan 1, 2007
-
Drilling on the Taum Sauk Upper Reservoir Rebuild ProjectBy Randall Head
The drilling at the Taum Sauk Reservoir was a unique compilation of the latest technology and everyday common sense. This site is comprised of rhyolite, which is 30 times harder than limestone in comp
Jan 1, 2010
-
Surveying the Damage: Post Traumatic Stress and Pre-Blast SurveysBy Jeffrey Loeb
Recent trends in blasting engineering and its related fields, at the level of professional academia, have tended to exclude detailed discussion and examination of the formative experiences of the engi
Jan 1, 2009
-
Damage to Rock: Near Field Seismic Models RevisitedBy Santiago Gómez, Pablo Segarra, José A. Sanchidrián
In this paper, differences between the industry-standard Holmberg-Persson (H-P) approach and a semi-analytical vibration prediction model called full-field solution (FFS) are analized. The analysis is
Feb 1, 2020
-
Optimization of Up Raises from Blind-Hole to Multiple Blasting Events MethodologyBy S. Gajardo, E. Valdés Guerra
Together with Sociedad Punta del Cobre S.A. (Pucobre) and Orica, we are carrying out a study of alternatives for methodology of excavation in Slot Up Raises from actually built with Blind Hole (BH) to
Jan 1, 2024
-
Vibration Effects on Underground Concrete StructuresBy Frederick Kuhnow
In open pit blasting, energy is released and transmitted through the geology. Negative effects can impact operations and can affect mine production. This paper presents recommendations for blast desig
Jan 1, 2014
-
Modeling An Artificial Screen For Reducing Seismic VibrationBy Lazar Kricak, Vladislav Kecojevic, Dragan Bogunovic
In spite of many advantages explosives have, their usage may cause environmental problem such as seismic vibration. One of the solutions to this particular problem may be application of an artificial
Jan 1, 2007
-
Electronic Detonator Timing Approaches for Surface Quarries and Metals MinesBy Tristan Worsey, Nathan Rouse, Evan Thibaud
Electronic detonators allow for variability and accuracy with blast delay selection and timing sequence. However, a single published guideline for selection of electronic timing delays is not availabl
Jan 21, 2025