    Pre-engineered Hydraulic Bracing Systems

    By Braxton P. Erbe, Douglas C. Brunot

    A variety of systems and techniques exist to support deep excavations where sloping is not feasible. This paper will explore an example project involving the use of pre-engineered hydraulic bracing sy

  • DFI
    Embodied Carbon Assessment For A Multi-Phased Development Pile Testing Strategy

    By Jack Taggart, Chris Barker

    Pile load testing strategies for large infrastructure projects and multi-phase building developments have historically justified cost and programme benefits for undertaking advance preliminary and wor

    May 1, 2022

  • DFI
    Geographic Information Systems Technology Use in Tracking Quality Control in In Situ Barrier Wall Construction (50051f21-259c-48c8-b98a-08fa9c39001e)

    By Michael Arnold, Robert Bachus, Michael Bracher, Jamey Rosen, Robert Roff

    "For a high hazard USACE facility, the Center Hill Dam in Tennessee, several disparate streams of data were compiled into a single geospatial and relational enterprise data management system to store,

    Jan 1, 2017

  • DFI
    Design of Pile Foundation for Tall Railway Bridges in North-East India

    By Sumantra Sengupta

    "Northeast Frontier Railway (NF Railway) intends to connect Imphal, the capital of Manipur (bordering Myanmar) with Assam by railway link. They have planned a 125km long railway line that passes throu

    Jan 1, 2015

  • DFI
    Engineering The Mansion's Heritage

    By Ken MacLeod

    A development at 83 Queens Road in Melbourne, Australia required construction of a three level basement. The normal geotechnical constraints of excavating adjacent to an existing relatively new buildi

    Jan 1, 2006

  • DFI
    Bluestone Dam Safety Assurance Program: An OPA Runner Up

    By Jeff Hopple

    "Bluestone Dam in Hinton, W.Va., along the New River, is owned and operated by the U.S. Army Corps of Engineers (USACE). Completed in 1949, the dam is 165 ft (50 m) tall, 2,048 ft (624 m) wide, and en

    Jan 1, 2014

  • DFI
    Eglinton Crosstown - Over and Under the Existing Subway

    By Shawna Munn, Sarah Speir

    Cedarvale Station is one of 25 new Eglinton Crosstown light rail transit (ECLRT) stations along Eglinton Avenue in Toronto. It is an interchange station with the existing Toronto Transit Com- mission

    Jan 1, 2023

  • DFI
    Structural Evaluation of Thermal Integrity Profile Results of Transmission Foundations

    By Ryan Weaver, Travis Coleman

    The drilled shafts that support transmission lines and substations have been increasingly subject to testing to assess the integrity of placed concrete. Cross-hole Sonic Logging (CSL) has been used, b

    Jan 1, 2019

  • DFI
    Elliptical Jet Grouting for the Sela-22 Project in New Orleans, LA: An Innovative Solution

    By Filippo Maria Leoni, Gianluca Pianezze

    "As part of the Southeast Louisiana (SELA) drainage program, designed to reduce flood damages in the City of New Orleans and surrounding parishes, the SELA-22 project entailed the construction of a co

    Jan 1, 2017

  • DFI
    Geophysical Applications For Highway Infrastructure, A Retrospective

    By William M. Dalrymple, William P. Owen, Benjamin S. Rivers

    For the California Department of Transportation (Caltrans), geophysical applications have played an important role as part of a successful multidisciplinary approach to subsurface characterization for

  • DFI
    Optimization Of Drilled Shaft Design For A Highway Bridge In Arizona Using Load Test Results

    By John C. Niedzielski

    The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter)

  • DFI
    Effective Plane Arrangement of Deep Mixing Piles to Resist Lateral Flow of Liquefied Ground

    By Daiki Takano, Naoki Takahashi, Hidenori Takahashi, Ikuo Towhata, Yoshiyuki Morikawa

    "The method in this study, in which cement-treated piles are installed into the ground to decrease the amount of liquefied lateral flow, has been studied. The authors are also investigating the most e

    Jan 1, 2015

  • DFI
    Very Deep Piling For The Highrise ‘De Zalmhaven’ In Rotterdam (Nl)

    By Ed Revoort, Robert Schippers

    In Rotterdam in the Netherlands the project ‘De Zalmhaven’ is being developed. The project consists of the realization of houses, parking facilities, two residential towers of 70 m and a residential h

    May 1, 2022

  • DFI
    Vibrations Caused by Pile Driving (bb4f9935-841f-4be3-bb1b-f95875d26e25)

    By K. Rainer Massarsch

    "Part 1 of 2 By K. Rainer Massarsch, Geo Engineering AB, Stockholm, SwedenINTRODUCTIONConstruction activities, such as driving of piles and sheet piles, soil compaction or excavation generate noise an

    Jan 1, 2004

  • DFI
    Soil Mixing for the LPV-111 Levee Improvements, New Orleans: A Case History

    By Filippo Maria Leoni, George Filz, Wesley Schmutzler, Matteo Bertoni

    "The US Army Corps of Engineers selected the Deep Mixing Method (DMM) for the required stabilization at the LPV 111 Project (New Orleans, USA). DMM was used for ground improvement/foundation strengthe

    Jan 1, 2015

  • DFI
    Effect of Cold Joint on Behavior of Block Type Deep Mixing Improved Ground

    By M. Kitazume, H. Imai

    The deep mixing method was developed in Japan and put into practice in the middle of 1970s. Since then, the wet and dry type methods have been applied for various improvement purposes in Japan. One st

    Sep 8, 2021

  • DFI
    Construction of High Road Embankment over Thick Soft Silty Clay- A Case Study

    By R. Radhakrishnan, C. Gunasekaran

    "Calicut Bypass Phase-II project included construction of 7 m high embankment over soft compressible clays up to 18 m in thickness. Approx 1.5 km length of road out of a total 5 km length consisted of

    Jan 1, 2015

  • DFI
    Building Drilled Shafts to Bridge the Mississippi

    By Brian Koch

    Michels installed 242 drilled shafts to support the piers for a new basket-handle, true-arch twin bridge across the Mississippi River from Moline, IL to Bettendorf, IA. The installation of the drilled

    Jan 1, 2019

  • DFI
    Construction Of A Spillwall In The Columbia River

    By Francis B. Gularte

    The Dalles Dam is located 192 miles upstream from the Columbia River?s mouth. As part of an effort to increase survival rates for young salmon migrating downstream to the Pacific Ocean, a river spillw

    Jan 1, 2010

  • DFI
    Quality Control and Testing of Jet Grouting and its Interpretation in Relation to the Christchurch Town Hall Restoration Project.

    By David Chadwick, Paul Marsden, Chris Hughes, Mathias Delapille

    "Following damage caused by the 2011 Christchurch earthquakes, the NZ$127.5million Christchurch Town Hall Restoration project is due for completion in 2018. The building is undergoing extensive repair