Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Application of Synthetic Seismograms to Geophysical Prospecting

    Synthetic seismograms of reflectivity method and some field records available are studied to detect the amplitude anomalies at the interface of the gaothermal reservoir the gas and/or oil boundary, an

    Jan 1, 1990

  • AUSIMM
    Effect of Stresses and Acoustic Emissions on Gas Permeability of Coal

    By Ma F, Yang Q, Ujihira M

    The effect of stresses and acoustic emissions on the gas permeability of coal was investigated in the field and the laboratory in order to find an estimative method of the practicability of gas draina

    Jan 1, 1991

  • AUSIMM
    Excavation of Two Long Tunnels Through Clay (Campania Waterworks, Italy)

    By Turco E, Pelizza S, Castellani F, Stanganelli V

    Excavation are in progress for the building of tunnels of the waterworks in West Campania (Naples). The works afferent to part II envisage tunnelling through a miocenic clay formation over consoli

    Jan 1, 1987

  • AUSIMM
    Golden Pig Mine Case Study

    The Golden Pig Mine is wholly owned by Bunnine Operations Limited and is located in the Yilgam Goldfields at Southern Cross, Western AustraliaThe paper briefly describes the geology and history of the

    Jan 1, 1993

  • AUSIMM
    Design Selection and Application of a Pressure Filtration System to the Dewatering of Copper and Lead Sulphide Slurries

    By Hawes GW

    Until 1980 copper, lead and zinc sulphide slurries have been success- fully dewatered for rail and sea transport for many years at the Rose- bery site of North Broken Hill Holdings Ltd. utilizing conv

    Jan 1, 1988

  • AUSIMM
    Heap Leaching

    The preferred alternatives in heap design and their motivation are identified as- -normal heap leaching, to be generally applied wherever possible, - flooded vat leaching, to be appliedwhere wetted or

    Jan 1, 1984

  • AUSIMM
    Minerals - Are They Needed?

    In the 100 years since the formation of The Australasian Institute of Mining and Metallurgy there have been significant changes in all aspects of the mining industry.A number of the changes have been

    Jan 1, 1993

  • AUSIMM
    Liquidus Surfaces in a Part of the Systems ZnO-PbO-SiOn and ZnO-"FeO"-SiO2

    By Tozawa K, Nishimura T, Sasaki K

    Liquidus surfaces in a part of the systems ZnO-PbO-Si02 and ZnO-"FeO"-SiO 2 were constructed by the quenching method. The ex- periments were carried out in air in the system ZnO-PbO-Si02. In the pa

    Jan 1, 1980

  • AUSIMM
    Initiation of Cablebolting at West Coast Mines, Roseberry

    Incompetent ore and country rock have caused stability problems in longhole open stopes. Fully grouted pre-placed cablebolts have reduced these by preventing ground relax- ation and joint dilation t

    Jan 1, 1977

  • AUSIMM
    Limits Excavation at Mt Whaleback

    Within the Mt Whaleback open cut mine the integrity of the final pit wall is achieved through careful rock slope design, use of rock reinforecement technology where marginal stability exists and u

    Jan 1, 1986

  • AUSIMM
    Outsource or Owner Operate

    The decision to contract or owner mine should be independent of, and should be made before, definitive estimated cost comparisons could be available. There is substantial potential risk of estimated c

    Jan 1, 2003

  • AUSIMM
    Validation of Measurements Used to Solve Ventilation Problems

    By Chavant G, Begis D, Gunther J

    To study the ventilation of a mine (improve on the existing situation, examine extension projects) the calculation program used must take into account all the resistance values in the branches of

    Jan 1, 1988

  • AUSIMM
    The Basement Contact Zone at Mount Isa - Its Impact on Rock Mechanics and Mine Design Philisophy

    By Struthers M. A

    The basement contact zone, a major fault structure underlying the copper orebodies at Mount Isa, has a significant influence on orebody extraction. The zone is comprised of a variety of weak, barren l

    Jan 1, 1990

  • AUSIMM
    Methods and Reliability of Measuring Winder Rope Degradation

    Mining regulatory authorities worldwide mandate frequent inspection of winder ropes used in shaft-equipped underground mines and ski lifts. Visual inspections are effective in identifying and assessin

    Jan 1, 2003

  • AUSIMM
    Automation in Underground Drilling, Loading and Transportation

    By Ulvelin K, Antila K

    Large scale cut and fill mining in narrow silver-lead-zinc orebodies began at Mount Isa in 1964. Initially each orebody was one stope and access was via raises from the level above. Upholing was t

    Jan 1, 1988

  • AUSIMM
    Manihiki Plateau û Results of Recent Resource-Oriented Shipboard Investigations and Discovery of a Major ?Mud Volcano Complex

    By Coulborn W. T, Glasby G. P, Maylan M. A

    Research cruises by HMNZS 'Tui' (1986) and RV 'Moana Wave' (1987) investigated the geology, geophysics and seafloor mineral resources of Manihiki Plateau in the central Pacific Oce

    Jan 1, 1990

  • AUSIMM
    The Mt Kasi Gold Mine, Fiji (92159131-93f3-4adb-8a50-03b7b9ccff8e)

    By Taylor GP

    Mining Lease SML 57 was registered to Mount Kasi on 5 January, 1995. The Mount Kasi gold mine is located in Vanua Levu, Fiji's second largest island and operated from 1932 to 1946 producing 261,

    Jan 1, 1995

  • AUSIMM
    Partnering in Joint Ventures - Major vs Minor

    A mining joint venture presents a real management challenge to achieve harmony with the other participants in the successful development and operation of a mine. This can best be facilitated by a

    Jan 1, 1997

  • AUSIMM
    Discussion of the Results of Coal Drilling at Mount Davy

    This paper will be a discussion of the geological exploration and drilling carried out on the Mt Davy Block, Greymouth Coalfield. A brief summary of the geology of the Greymouth Coalfield will be giv

    Jan 1, 1979

  • AUSIMM
    Pilot Plant Work as an Aid to Process Flow Line Development and Process Choices

    Pilot plant work has played a major role in the process development and design phase of the Iscor Heavy Minerals project. The pilot plant campaigns have been aimed at three process areas, namely prima

    Jan 1, 2001