Effective CommissioningBy Lane G
This paper addresses project commissioning, that is, activities that culminate in the transfer of a project from the construction phase to routine plant operation. These activities should be initia
Jan 1, 1997
-
Improved Decopperising of Lead Bullion at Port PirieBy Miller M. J, Bauer J. C
The continuous copper drossing process operated at Port Pine since 1962 has had limited copper removal capacity as determined by a maximum tolerable Cu/S ratio in feed and the level of sulphur in b
Jan 1, 1989
-
Magma Suites and Metallogeny - Examples from the Canadian Cordillera (41807178-17ab-42f6-a7e5-653f438c4d11)By Mortensen JK, Lang JR
The Canadian Cordillera contains numerous classic porphyry deposits and several unusual subtypes, including the alkaline suite of porphyry Cu-Au deposits and the Tombstone magmatic suite and associat
Jan 1, 1995
-
HellyerÆs Exploration DevelopmentBy Viney K. G, Molinia A. B
The Hellyer Pb-Zn-Ag orebody in western Tasmania was discovered in 1983, and mine production at a rate of 250 000 tonnes/yr commenced in 1987. Expansion to 1 million/yr will be completed by early
Jan 1, 1988
-
Ore Block Modelling and Structural Geology: Their IntergrationBy Hall C. E, Chrisholm J. M
Resource calculations for shear hosted deposits of any type are difficult regardless of which calculation technique is used. One of the main problems is the determination of the geometry of the minera
Jan 1, 1993
-
Design and Commissioning of the Sepon Copper Pressure Oxidation CircuitBy A G. Pavlides, B L. Weekes
The Sepon Copper Project is located in the Savannakhet Province of Laos PDR and is operated by Lane Xang Minerals Ltd (LXML). An Ausenco - Bateman Engineering joint venture, the Khanong Development Gr
Jan 1, 2005
-
Facilitating Continuous Expansion of a Bulk Materials Handling FacilityBy P Rourke
In this climate of increasing demand for commodities, it is becoming necessary to expand and optimise existing bulk material handling facilities in order to increase capacity to satisfy demand. Produc
Jan 1, 2005
-
Volcanic Origin of the Proterozoic Itabira Iron Formation, Quadrilßtero Ferrffero, Minas Gerais, BrazilBy D M. Aranha, A R. Cabral
Theories on the origin of the Itabira iron formation (itabirite) in Quadrilßtero Ferrffero (QF), as elsewhere in the world, are restricted by the apparent lack of adjoining volcanic units, severe synd
Jan 1, 2005
-
Can Mine to Mill Optimisation Succeed Under Complex Constraints?By D Thornton, B Smith, S Demey
Mine to Mill (MTM) optimisation, a total systems approach to the reduction of energy and cost in mining and mineral processing operations, is well-established technology. However, successful applicati
Jan 1, 2007
-
How to Cope with Cutter Roof ProblemThis paper presents results of the experiments carried out in Beth Energy No. 33 Mine for the purpose of alleviating problems associated with cutter roof. Cutter roof problems have delayed the adva
Jan 1, 1992
-
Historical Review of Mineral Valuation MethodologyThe basic principles of mineral valuation were recognised and propounded at the beginning of this century and have remained virtually unchanged since then. Valuation is seen as a two part process
Jan 1, 1994
-
Overburden Preparation Moura-Kianga Coal Mines, Bowen BasinQuite apart from economic considerations, the following performance parameters must be considered when selecting an explosive for a particular blasting operation. 1. total energy yield/kg, and more
Jan 1, 1974
-
The Interaction Between a Tunnel/Cavity and Nearby StructuresBy Abdalla MH
The deformation resulting from the presence of a tunnel may signifcantly affected, nearby structures and need to be considered during design of both tunnel and structure. The aim of this paper is t
Jan 1, 1987
-
The Project TeamThe necessity for agreed project outcomes, which are in accordance with client needs, and the subsequent requirement for a unique approach to managing project implementation is discussed. Reasons f
Jan 1, 1997
-
Recoverable Resource Estimation Using Bivariate Uniform Conditioning at the Lihir Gold MineBy A Tomsett, R Kidd, Z Casley
Bivariate recoverable resource estimation aims at predicting the recovered metal for a secondary variable when a cut-off is applied to a primary variable. The choice of a consistent geostatistical mod
Jan 1, 2009
-
Electromagnetic Testing of Mine Winding Ropes û The Field Pattern of an Internal Broken WireWith the recent wider introduction of friction hoists of the Koepe type. for winding from depths of more than 3000 feet it has been found that failure by fatigue is the most common form of rope det
Jan 1, 1971
-
The Design of Multi-Seam Workings at Shallow Depth Under Tidal WatersBy Anderson KG
Multi-seam mining under the western portion of Lake Macquarie NSW commenced in 1982. Up to three seams separated by partings ranging from 10 to 30 metres are mined simultaneously by Newcom Collier
Jan 1, 1986
-
Investigation into Cable Bolt Corrosion at Mt Whaleback Mine, Newman, Western AustraliaCable bolts have been used extensively in the development of the footwall of the Mt Whaleback Mine as a part of the ground improvement program since 1986. High tensile seven wire stress relieved steel
Jan 1, 1992
-
Refurbishment and Modernization - the Proven Alternative to Replacement of Large Materials Handling EquipmentThe process of refurbishment is not a precisely defined one. It is under- stood to mean an upgrading of a plant which is normally performed only once. The application of refurbishment in the field of
Jan 1, 1989
-
Confidence in Mine Planning ù The Role of Intelligent TechnologiesMine planning is difficult. Even for small operations, it involves reasoning with complex variables and the practical difficulties of mining. It is also about predicting and planning the future in an
Jan 1, 2003