Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Effect of mill-scale and calcined dolomite on high Al2O3 sinter and its reduction behaviour

    By S J. Kim, S W. Kim, L Tomas da Rocha, S Jung

    Al2O3 has been regarded as a harmful gangue component in iron ore, especially causing reduction degradation in industrial sintering of iron ore. The current study aimed to utilise low-grade iron ore c

    Jun 19, 2024

  • AUSIMM
    Flotation Optimisation Studies of the Perilya Broken Hill Lead Circuit

    By B Kilgariff

    Flotation has been in use at Broken Hill for nearly 100 years, and the process has gone through many different optimisation studies over that time. This paper reviews the current flotation practice at

    Jan 1, 2005

  • AUSIMM
    Modelling of Froth Transportation in an Outokumpu 3 m<sup>3</sup> Tank Cell

    By J-P Franzidis, E V. Manlap

    Froth transportation characteristics have a significant impact on the flotation recovery especially in large flotation cells. The probability of an attached particle being recovered into the concentra

    Jan 1, 2005

  • AUSIMM
    The Role of Surface Silanol Groups in Flotation Separation of Quartz from Feldspar using Nonionic Surfactants

    By Nakahiro Y, Wakamatsu T

    In the present study, from experimental results, a new concept of possibility of flotation separation of quartz from feldspar is presented. The effect of the nonionic surfactant Brij 58 on the flota

    Jan 1, 1993

  • AUSIMM
    High-Resolution Pit Water Quality Model for the Highway Reward Mine, Queensland, Australia

    By B G. Lottermoser

    Field and laboratory data combined with computational modelling have been used to predict the pit water quality for the Highway Reward mine. Open pit mining of the Highway Reward copper-gold deposit h

    Jan 1, 2003

  • AUSIMM
    An analysis of productivity in sublevel caving mines

    By G R. Power

    A useful way to assess potential productivity of SLC mines is by quantifying tonnes/drawpoint/day to be extracted from the mine. However limited industry information has been published to help mines b

    Mar 15, 2021

  • AUSIMM
    Use of Draglines - Where to in the 21st Century

    Draglines have been a significant part of world open cut mining since the early part of the 20th century particularly for the removal of overburden in the strip mining of coal. Since the mid-1960s dra

    Jan 1, 1992

  • AUSIMM
    Forecast the mineral processing destinations based on spatial interpolation of geometallurgical variables

    By N Madani, Y Abildin, E Topal

    Mine planning is a crucial part of all mining industry projects, and nowadays, geometallurgical mapping through advanced computer technologies provides an opportunity to involve metallurgical response

    Nov 21, 2018

  • AUSIMM
    Algebraic optimisation of excavation alignment using the stress tensor

    By P B. Hills

    A simple algebraic method of aligning large scale underground excavations such as a crusher station or workshop or indeed any large cavern or mine layout to the optimal stress condition is outlined. T

    Nov 29, 2022

  • AUSIMM
    Unlocking value in drill and blast at Olympic Dam – Lime 390 case study

    By P Vaikkattil, K Li, J Bullock

    Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout

    Mar 15, 2021

  • AUSIMM
    Rock stress measurements – a site geotechnical toolkit

    By P B. Hills

    Increasingly over the past couple of decades, the importance of understanding the in situ stress regime in underground hard rock mines has become accepted by all. Providers have responded to this requ

    Nov 29, 2022

  • AUSIMM
    The Impact of Residence Time on Copper Recovery in Telfer Gold MineÆs Cyanide Recycling Process

    By P Breuer, A Simons

    The sulfidisation, acidification, recycle and thickening (SART) process is currently being used at NewcrestÆs Telfer Gold Mine to recover cyanide and copper from the cyanidation tails of the pyrite co

    Sep 26, 2013

  • AUSIMM
    Multivariate Block Simulations of a Lateritic-type Nickel Deposit and Post-processing of a Representative Subset

    By J Deraisme, P Epinoux, O Bertoli

    "Société le Nickel exploits the Dôme lateritic nickel orebody at its Tiébaghi operations in New Caledonia. The site geology has an obvious bearing on recovery and metallurgical performance, with contr

    Nov 24, 2014

  • AUSIMM
    Coal Pillar Design Criteria for Surface Protection

    Large areas of ground are permanently supported on coal pillars, both in extensive old workings and current drivages in active mining operations. Continued growth of civil infrastructure is resulting

    Jan 1, 2005

  • AUSIMM
    Development of a Pyrite Regrind Circuit at Telfer Gold Mine

    By D R. Seaman, Y Peng, F Burns, D J. Bradshaw

    Telfer Gold Mine is a gold-copper mine in the eastern Pilbara of Western Australia, owned and operated by Newcrest Mining Limited. TelferÆs ores are processed by a dual train, 21 Mt/a, concentrator wh

    Oct 29, 2012

  • AUSIMM
    Improving the Recovery of Coarse Coal Particles in a Jameson Cell

    By G J. Harbort, Z Pokra

    It has been observed in several Jameson cell installations where the source for flotation feed is deslime screens, that the recovery of coal particles greater than 0.5 m is not as great as that of fin

    Jan 1, 2005

  • AUSIMM
    Setting new standards at Kanmantoo – effective grade control procedures

    By M Reid, H Arbon

    Hillgrove Resources (HGO) commenced open pit mining in 2011 and from 2011 to 2016 the geology team experienced a consistent negative reconciliation between grade control estimated copper (Cu) grade an

    Sep 20, 2017

  • AUSIMM
    Fine grinding circuit process improvement at the Karara mine concentrator

    By H Ishikawa, H Zhou, M Spagnolo, R Halomoan, S Palaniandy

    The Karara Mine concentrator commenced operation in November 2012 to produce high-grade magnetite concentrate. The circuit consists of three stages of comminution plus magnetic separation at each stag

    Sep 11, 2017

  • AUSIMM
    Fire Modelling in Underground Mines using Ventsim Visual VentFIRE Software

    By D J. Brake

    The risk from fire remains one of the most serious of underground mine disaster scenarios. The impacts of mine fires on the underground ventilation system and the production of toxic gases have been d

    Jul 1, 2013

  • AUSIMM
    The Interaction Between Pulp Density and Frother Addition in Coal Flotation

    By Roberts T, Firth B. A

    A series of flotation experiments was carried out to study the interaction between the parameters of pulp density (mass per cent of solids in feed slurry) and frother addition (on the basis of solid m

    Jan 1, 1984